Petromin announces update of Frog Lake Project
Dr. Ross Gorrell reports,
VANCOUVER, April 2, 2013 /CNW/ - Petromin Resources Ltd. (the "Company") is pleased to announce that it has successfully completed the work over operations at its Frog Lake 7A and 7B wells in which the Company has 100% and 45% working interests respectively. 7A is currently being produced at approximately 40 b/d and 7B at approximately 70 b/d. The Company is also reviewing farm out options to drill its fourth well location at Frog Lake.
CANADA
Petromin's core Canadian properties are strategically located in Central Alberta (Morningside, Redwater, Frog Lake and Gilby)
CHINA
Petromin is believed to be the only Canadian junior public company listed on the TSX Venture Tier One Board (PTR.V) to have an interest in China's Massive Coalbed Methane ("CBM") / Shale Gas Production Sharing Contracts ("PSC"). Petromin's interest is held through its current 22.28% ownership in Terrawest Energy Corp. ("TWE"). The PSC was acquired by TWE in December 2005 and after completing a coal study of all China, the Southern Jungar Basin in N.W. China's Xinjiang Province was handpicked for the 653 square kilometer PSC.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
SOURCE: Petromin Resources Ltd.

PETROMIN RESOURCES LTD.
1120-1090 W. Pender Street
Vancouver, B.C. V6E 2N7
Telephone: (604) 682-8831
Fax: (604) 682-8683
Attn: Arthur Ross Gorrell
Share this article