Accessibility Statement Skip Navigation
  • Resources
  • Investor Relations
  • Journalists
  • Webcasts
  • Français
  • my CNW 
    • Login
    • Register
  • Client Login
  • Sign Up
  • Send a Release
Return to PR Newswire homepage
  • News
  • Products
  • Contact
Search
When typing in this field, a list of search results will appear and be automatically updated as you type.

Searching for your content...

No results found. Please change your search terms and try again.

News Releases

view all
    Advanced Search
    • News in Focus
        • Browse News Releases

        • All News Releases
        • All Public Company
        • News Releases Overview

        • Multimedia Gallery

        • All Multimedia
        • All Photos
        • All Videos
        • Multimedia Gallery Overview

        • Trending Topics

        • All Trending Topics
    • Business
        • Auto & Transportation

        • Aerospace, Defense
        • Air Freight
        • Airlines & Aviation
        • Automotive
        • Maritime & Shipbuilding
        • Railroads and Intermodal Transportation
        • Supply Chain/Logistics
        • Transportation, Trucking & Railroad
        • Travel
        • Trucking and Road Transportation
        • Auto & Transportation Overview

        • View All Auto & Transportation

        • Business Technology

        • Blockchain
        • Broadcast Tech
        • Computer & Electronics
        • Computer Hardware
        • Computer Software
        • Data Analytics
        • Electronic Commerce
        • Electronic Components
        • Electronic Design Automation
        • Financial Technology
        • High Tech Security
        • Internet Technology
        • Nanotechnology
        • Networks
        • Peripherals
        • Semiconductors
        • Business Technology Overview

        • View All Business Technology

        • Entertain­ment & Media

        • Advertising
        • Art
        • Books
        • Entertainment
        • Film and Motion Picture
        • Magazines
        • Music
        • Publishing & Information Services
        • Radio & Podcast
        • Television
        • Entertainment & Media Overview

        • View All Entertain­ment & Media

        • Financial Services & Investing

        • Accounting News & Issues
        • Acquisitions, Mergers and Takeovers
        • Banking & Financial Services
        • Bankruptcy
        • Bond & Stock Ratings
        • Conference Call Announcements
        • Contracts
        • Cryptocurrency
        • Dividends
        • Earnings
        • Earnings Forecasts & Projections
        • Financing Agreements
        • Insurance
        • Investments Opinions
        • Joint Ventures
        • Mutual Funds
        • Private Placement
        • Real Estate
        • Restructuring & Recapitalization
        • Sales Reports
        • Shareholder Activism
        • Shareholder Meetings
        • Stock Offering
        • Stock Split
        • Venture Capital
        • Financial Services & Investing Overview

        • View All Financial Services & Investing

        • General Business

        • Awards
        • Commercial Real Estate
        • Corporate Expansion
        • Earnings
        • Environmental, Social and Governance (ESG)
        • Human Resource & Workforce Management
        • Licensing
        • New Products & Services
        • Obituaries
        • Outsourcing Businesses
        • Personnel Announcements
        • Real Estate Transactions
        • Residential Real Estate
        • Small Business Services
        • Socially Responsible Investing
        • Surveys, Polls and Research
        • Trade Show News
        • General Business Overview

        • View All General Business

    • Science & Tech
        • Consumer Technology

        • Artificial Intelligence
        • Blockchain
        • Cloud Computing/Internet of Things
        • Computer Electronics
        • Computer Hardware
        • Computer Software
        • Consumer Electronics
        • Cryptocurrency
        • Data Analytics
        • Electronic Commerce
        • Electronic Gaming
        • Financial Technology
        • Mobile Entertainment
        • Multimedia & Internet
        • Peripherals
        • Social Media
        • STEM (Science, Tech, Engineering, Math)
        • Supply Chain/Logistics
        • Wireless Communications
        • Consumer Technology Overview

        • View All Consumer Technology

        • Energy & Natural Resources

        • Alternative Energies
        • Chemical
        • Electrical Utilities
        • Gas
        • General Manufacturing
        • Mining
        • Mining & Metals
        • Oil & Energy
        • Oil and Gas Discoveries
        • Utilities
        • Water Utilities
        • Energy & Natural Resources Overview

        • View All Energy & Natural Resources

        • Environ­ment

        • Conservation & Recycling
        • Environmental Issues
        • Environmental Policy
        • Environmental Products & Services
        • Green Technology
        • Natural Disasters
        • Environment Overview

        • View All Environ­ment

        • Heavy Industry & Manufacturing

        • Aerospace & Defense
        • Agriculture
        • Chemical
        • Construction & Building
        • General Manufacturing
        • HVAC (Heating, Ventilation and Air-Conditioning)
        • Machinery
        • Machine Tools, Metalworking and Metallurgy
        • Mining
        • Mining & Metals
        • Paper, Forest Products & Containers
        • Precious Metals
        • Textiles
        • Tobacco
        • Heavy Industry & Manufacturing Overview

        • View All Heavy Industry & Manufacturing

        • Telecomm­unications

        • Carriers and Services
        • Mobile Entertainment
        • Networks
        • Peripherals
        • Telecommunications Equipment
        • Telecommunications Industry
        • VoIP (Voice over Internet Protocol)
        • Wireless Communications
        • Telecommunications Overview

        • View All Telecomm­unications

    • Lifestyle & Health
        • Consumer Products & Retail

        • Animals & Pets
        • Beers, Wines and Spirits
        • Beverages
        • Bridal Services
        • Cannabis
        • Cosmetics and Personal Care
        • Fashion
        • Food & Beverages
        • Furniture and Furnishings
        • Home Improvement
        • Household, Consumer & Cosmetics
        • Household Products
        • Jewelry
        • Non-Alcoholic Beverages
        • Office Products
        • Organic Food
        • Product Recalls
        • Restaurants
        • Retail
        • Supermarkets
        • Toys
        • Consumer Products & Retail Overview

        • View All Consumer Products & Retail

        • Entertain­ment & Media

        • Advertising
        • Art
        • Books
        • Entertainment
        • Film and Motion Picture
        • Magazines
        • Music
        • Publishing & Information Services
        • Radio & Podcast
        • Television
        • Entertainment & Media Overview

        • View All Entertain­ment & Media

        • Health

        • Biometrics
        • Biotechnology
        • Clinical Trials & Medical Discoveries
        • Dentistry
        • FDA Approval
        • Fitness/Wellness
        • Health Care & Hospitals
        • Health Insurance
        • Infection Control
        • International Medical Approval
        • Medical Equipment
        • Medical Pharmaceuticals
        • Mental Health
        • Pharmaceuticals
        • Supplementary Medicine
        • Health Overview

        • View All Health

        • Sports

        • General Sports
        • Outdoors, Camping & Hiking
        • Sporting Events
        • Sports Equipment & Accessories
        • Sports Overview

        • View All Sports

        • Travel

        • Amusement Parks and Tourist Attractions
        • Gambling & Casinos
        • Hotels and Resorts
        • Leisure & Tourism
        • Outdoors, Camping & Hiking
        • Passenger Aviation
        • Travel Industry
        • Travel Overview

        • View All Travel

    • Policy & Public Interest
        • Policy & Public Interest

        • Advocacy Group Opinion
        • Animal Welfare
        • Canadian Federal Government
        • Canadian Municipal Government
        • Canadian Provincial Government
        • Corporate Social Responsibility
        • Domestic Policy
        • Economic News, Trends, Analysis
        • Education
        • Environmental
        • European Government
        • FDA Approval
        • Federal and State Legislation
        • Federal Executive Branch & Agency
        • Foreign Policy & International Affairs
        • Homeland Security
        • Labor & Union
        • Legal Issues
        • Natural Disasters
        • Not For Profit
        • Patent Law
        • Public Safety
        • Trade Policy
        • Policy & Public Interest Overview

        • View All Policy & Public Interest

    • People & Culture
        • People & Culture

        • Aboriginal, First Nations & Native American
        • African American
        • Asian American
        • Children
        • Diversity, Equity & Inclusion
        • Hispanic
        • Lesbian, Gay & Bisexual
        • Men's Interest
        • People with Disabilities
        • Religion
        • Senior Citizens
        • Veterans
        • Women
        • People & Culture Overview

        • View All People & Culture

    • Advanced Search
    • Explore Our Platform
    • Plan Campaigns
    • Create with AI
    • Distribute Press Releases
    • Report Results
    • Amplify Content
    • IR
    • All Products
    • Become a Client
    • Request a Demo
    • Editorial Bureaus
    • Partnerships
    • General Enquiries
    • Media
    • Worldwide Offices
    • Hamburger menu
    • Cision Canada
    • Send a Release
    • FR
      • Phone

      • 877-269-7890 from 8 AM - 10 PM ET

      • ALL CONTACT INFO
      • Contact Cision

        877-269-7890
        from 8 AM - 10 PM ET

    • Searching for your content...

      No results found. Please change your search terms and try again.

      News Releases

      view all
      Close menu
    • News
    • Products
    • Contact
      • Send a Release
      • Sign Up
      • Resources
      • Investor Relations
      • Journalists
      • Webcasts
      • my CNW
      • GDPR
      • 3 News in Focus
      • 5 Business
      • 5 Science & Tech
      • 5 Lifestyle & Health
      • 1 Policy & Public Interest
      • 1 People & Culture
      • Send a Release
      • Sign Up
      • Resources
      • Investor Relations
      • Journalists
      • Webcasts
      • my CNW
      • GDPR
      • Explore Our Platform
      • Plan Campaigns
      • Create with AI
      • Distribute Press Releases
      • Report Results
      • Amplify Content
      • IR
      • All Products
      • Send a Release
      • Sign Up
      • Resources
      • Investor Relations
      • Journalists
      • Webcasts
      • my CNW
      • GDPR
      • Become a Client
      • Request a Demo
      • Editorial Bureaus
      • Partnerships
      • General Enquiries
      • Media
      • Worldwide Offices
      • General Enquiries
      • Send a Release
      • Sign Up
      • Resources
      • Investor Relations
      • Journalists
      • Webcasts
      • my CNW
      • GDPR
      Close submenu (News in Focus) News in Focus
      • Browse News Releases
      • Multimedia Gallery
      • Trending Topics
      Close submenu (Business) Business
      • Auto & Transportation
      • Business Technology
      • Entertain­ment & Media
      • Financial Services & Investing
      • General Business
      Close submenu (Science & Tech) Science & Tech
      • Consumer Technology
      • Energy & Natural Resources
      • Environ­ment
      • Heavy Industry & Manufacturing
      • Telecomm­unications
      Close submenu (Lifestyle & Health) Lifestyle & Health
      • Consumer Products & Retail
      • Entertain­ment & Media
      • Health
      • Sports
      • Travel
      Close submenu (Policy & Public Interest) Policy & Public Interest
      • Policy & Public Interest
      Close submenu (People & Culture) People & Culture
      • People & Culture

      Agnico Eagle Reports Second Quarter 2018 Results; Production Guidance Increased for 2018; Amaruq Project Receives Permit Approval; Meliadine Project Progressing on Budget and on Schedule; Drilling Continues to Extend Mineralization at Multiple Mine Sites


      News provided by

      Agnico Eagle Mines Limited

      Jul 25, 2018, 17:00 ET

      Share this article

      Share this article


      Stock Symbol: AEM (NYSE and TSX)

      (All amounts expressed in U.S. dollars unless otherwise noted)

      TORONTO, July 25, 2018 /CNW/ - Agnico Eagle Mines Limited (NYSE:AEM, TSX:AEM) ("Agnico Eagle" or the "Company") today reported quarterly net income of $5.0 million, or $0.02 per share, for the second quarter of 2018.  This result includes a realized gain on asset disposals of $25.0 million ($0.11 per share) primarily related to the sale of the West Pequop Joint Venture, Summit and PQX properties in Nevada, non-cash foreign currency translation losses on deferred tax liabilities of $15.9 million ($0.07 per share), non-cash foreign currency translation losses of $3.9 million ($0.02 per share) and mark-to-market adjustments and derivative losses on financial instruments of $2.8 million ($0.01 per share).  Excluding these items would result in adjusted net income1 of $2.6 million or $0.01 per share for the second quarter of 2018.  In the second quarter of 2017, the Company reported net income of $54.9 million or $0.24 per share.

      Included in the second quarter of 2018 net income, and not adjusted above, is non-cash stock option expense of $3.8 million ($0.02 per share).

      Income and mining taxes expense for the second quarter of 2018 was $35.4 million, or an effective tax rate of 88%.  In the first six months of 2018, the income and mining taxes expense was $59.9 million, or an effective tax rate of 55%.  These tax rates are higher than prior guidance partly due to the distribution of earnings by jurisdiction in the second quarter of 2018.  The Company anticipates the overall effective tax rate to normalize over the remainder of 2018 to approximately 45% for the full year 2018.

      In the first six months of 2018, the Company reported net income of $49.9 million, or $0.21 per share.  This compares with the first six months of 2017, when net income was $130.8 million, or $0.57 per share.

      In the second quarter of 2018, cash provided by operating activities was $120.1 million ($159.5 million before changes in non-cash components of working capital), as compared with the second quarter of 2017 when cash provided by operating activities was $184.0 million in ($197.2 million before changes in non-cash components of working capital).

      In the first six months of 2018, cash provided by operating activities was $327.8 million ($340.1 million before changes in non-cash components of working capital), as compared with the first six months of 2017 when cash provided by operating activities was $406.6 million ($421.2 million before changes in non-cash components of working capital).

      The decrease in net income and cash provided by operating activities during the current quarter compared to the prior year period was mainly due to lower gold sales volumes and higher costs, partially offset by higher realized gold prices.  Lower gold sales were as a result of expected lower gold production in the period primarily due to reduced throughput levels at Meadowbank as the mine transitions through the last full year of mining at site.  The higher costs were principally a result of the strengthening of local currencies against the U.S. dollar and higher costs at several operations, principally at Meadowbank and Kittila.

      "Our mines continued to deliver strong operational performance during the quarter, which has allowed us to increase 2018 production guidance to 1.58 million ounces of gold from 1.53 million ounces.  Cash costs remained at the mid-point of our guidance, but we expect these costs to trend lower in the second half of the year", said Sean Boyd, Agnico Eagle's Chief Executive Officer.  "In the second quarter, we continued to make good progress on our development projects in Nunavut.  We recently received the Type A water licence for the Whale Tail pit at Amaruq, which allowed us to begin construction in late July, and the shipping season is now underway at Meliadine, which should facilitate timely completion of the project allowing for the expected start of production in the second quarter of 2019" added Mr. Boyd.

      ______________________________
       1 Adjusted net income is a non-GAAP measure.  For a discussion regarding the Company's use of non-GAAP measures, please see "Note Regarding Certain Measures of Performance".

      Second quarter 2018 highlights include:

      • Operational performance remains strong – Payable gold production2 in the second quarter of 2018 was 404,961 ounces at production costs per ounce of $750, total cash costs3 per ounce of $656 and all-in sustaining costs per ounce4 ("AISC") of $921

      • Production guidance increased for 2018 – Full year production guidance is now forecast to be 1.58 million ounces of gold compared to previous guidance of 1.53 million ounces of gold.  Unit cost guidance is unchanged, with total cash costs per ounce of $625 to $675 and AISC of $890 to $940 per ounce.  However, the Company expects total cash costs per ounce to trend lower in the second half of 2018

      • Amaruq project receives permit approval – The Type A water licence for the Whale Tail pit was approved by the Minister of Crown-Indigenous Relations and Northern Affairs Canada on July 11, 2018.  Preliminary construction work and stripping of the Whale Tail pit began in late July, as expected, and the Whale Tail deposit remains on schedule and budget for the start of production in the third quarter of 2019

      • Meliadine project proceeding on schedule and on budget; step-out drilling extends Tiriganiaq mineralization – The 2018 shipping season is underway at Meliadine and development activities remain on track for the expected commencement of production in the second quarter of 2019.  A recent drill hole returned 27.3 grams per tonne ("g/t") gold over 12.8 metres at 483 metres depth.  This hole is expected to extend the inferred mineral resources envelope at Tiriganiaq

      • Akasaba West Project receives Federal and Provincial authorization – The Company will now proceed with applications for the Mining Lease and Certificates of Authorization.  The Company is reviewing the timeline for the integration of the Akasaba West project into the Goldex production profile

      • LaRonde Zone 5 (LZ5) declares commercial production and Lapa mine life extended until the fourth quarter of 2018 – LZ5 declared commercial production on June 1, 2018.  In order to maximize production, ore from LZ5 will be batch processed with ore from Lapa until the end of 2018

      • A quarterly dividend of $0.11 per share was declared

      __________________________
      2 Payable production of a mineral means the quantity of a mineral produced during a period contained in products that have been or will be sold by the Company whether such products are shipped during the period or held as inventory at the end of the period.
      3 Total cash costs per ounce is a non-GAAP measure and, unless otherwise specified, is reported on a by-product basis.  For a reconciliation to production costs and for total cash costs on a co-product basis, see "Reconciliation of Non-GAAP Financial Performance Measures" below.  See also "Note Regarding Certain Measures of Performance".
      4 All-in-sustaining costs per ounce is a non-GAAP measure and, unless otherwise specified, is reported on a by-product basis.  For a reconciliation to production costs and for all-in sustaining costs on a co-product basis, see "Reconciliation of Non-GAAP Financial Performance Measures" below.  See also "Note Regarding Certain Measures of Performance".

      Second Quarter Financial and Production Highlights

      In the second quarter of 2018, strong operational performance continued at the Company's mines, which led to payable gold production of 404,961 ounces, compared to 427,743 ounces in the second quarter of 2017.  In the first six months of 2018, payable gold production was 794,239 ounces, compared to 845,959 ounces in the 2017 period.

      The lower level of production in the second quarter of 2018 and the first six months of 2018, when compared with the prior-year periods, was primarily due to reduced throughput levels at Meadowbank as the mine transitions through the last full year of mining at site.  A detailed description of the production of each mine is set out below.

      Production costs per ounce for the second quarter of 2018 were $750, compared to $634 in the prior-year period.  Total cash costs per ounce for the second quarter of 2018 were $656, compared to $556 per ounce in the prior-year period.

      Production costs per ounce in the first six months of 2018 were $754, compared to $606 in the prior-year period.  Total cash costs per ounce in the first six months of 2018 were $652, compared with $548 in the prior-year period.

      Production costs per ounce and total cash costs per ounce in the second quarter of 2018 and the first six months of 2018, when compared to the prior-year periods, were negatively affected by lower gold production levels at Meadowbank, the strengthening of local currencies against the U.S. dollar and higher costs at several mines (principally at Meadowbank and Kittila).  The impact of the strengthening of local currencies compared to the second quarter of 2017 was approximately $23 per ounce.

      AISC for the second quarter of 2018 were $921 per ounce, compared to $785 in the prior-year period.  The higher AISC is primarily due to expected lower gold production and higher total cash costs per ounce compared to the second quarter of 2017.

      AISC in the first six months of 2018 were $906 per ounce, compared to $764 in the prior-year period.  The higher AISC is primarily due to the same reasons as described above.  A detailed description of the cost performance of each mine is set out below.

      Cash Position Remains Strong

      Cash and cash equivalents and short term investments increased to $721.2 million at June 30, 2018, from the March 31, 2018 balance of $464.8 million.

      The outstanding balance on the Company's credit facility remained nil at June 30, 2018.  This results in available credit lines of approximately $1.2 billion, not including the uncommitted $300 million accordion feature.

      On April 5, 2018, the Company issued notes to certain institutional investors totalling $350 million.  The notes consist of $45 million at 4.38% due 2028, $55 million at 4.48% due 2030 and $250 million at 4.63% due 2033.  The terms of the notes are substantially the same as the terms of the outstanding notes of the Company.  The Company previously announced the issuance of these notes in its news release dated April 26, 2018.  During the quarter, DBRS Limited changed the trend on the Company's investment grade credit rating to Positive from Stable and confirmed the rating at BBB (low).

      Approximately 56% of the Company's remaining 2018 Canadian dollar exposure is hedged at an average floor price of 1.28 C$/US$, of which approximately one third are designated for capital expenditures at Meliadine.  Approximately 48% of the Company's remaining 2018 Mexican peso exposure is hedged at an average floor price of 19.00 MXN/US$.  Approximately 8% of the Company's remaining 2018 Euro exposure is hedged at a rate of 1.20.  The Company's full year 2018 cost guidance was based on assumed exchange rates of 1.25 C$/US$, 18.00 MXN/US$ and 1.20 US$/EUR.  Agnico Eagle anticipates adding to its operating currency hedges, subject to market conditions.

      Approximately 20% of the Company's diesel exposure relating to the Nunavut operations for the July 2018 to July 2019 consumption period is hedged at prices better than the 2018 cost guidance assumption of C$0.80 per litre.  Agnico Eagle anticipates adding to its diesel hedges, subject to market conditions.

      Capital Expenditures

      Total capital expenditures (including sustaining capital) in 2018 remain forecast to be approximately $1.08 billion.  The following table sets out capital expenditures (including sustaining capital) in the second quarter and first six months of 2018.

      Capital Expenditures




      (In thousands of US dollars)






      Three Months Ended

      Six Months Ended



      June 30, 2018

      June 30, 2018

      Sustaining Capital





      LaRonde mine


      $

      18,215

      $

      33,612


      LaRonde Zone 5


      539

      539


      Canadian Malartic mine


      13,172

      29,290


      Meadowbank mine


      9,225

      12,115


      Kittila mine


      13,670

      23,468


      Goldex mine


      5,303

      10,415


      Pinos Altos mine


      11,150

      18,325


      Creston Mascota mine


      1,224

      1,726


      La India mine


      1,494

      2,924

      Total Sustaining Capital


      $

      73,992

      $

      132,414





      Development Capital





      LaRonde mine


      $1,093

      $1,935


      LaRonde Zone 5


      7,448

      15,001


      Canadian Malartic mine


      6,070

      11,281


      Amaruq satellite deposit


      28,467

      43,443


      Kittila mine


      24,732

      43,311


      Goldex mine


      8,229

      16,541


      Pinos Altos mine


      246

      284


      Creston Mascota mine


      6,889

      9,950


      La India mine


      182

      743


      Meliadine project


      109,124

      170,454


      Other


      1,158

      1,600

      Total Development Capital


      $

      193,638

      $

      314,543





      Total Capital Expenditures


      $

      267,630

      $

      446,957

      Revised 2018 Guidance – Production Increased

      Production for 2018 is now forecast to be 1.58 million ounces of gold (previously 1.53 million ounces).  Unit cost guidance is unchanged with total cash costs per ounce of $625 to $675 and AISC of $890 to $940 per ounce.  However, the Company expects total cash costs to trend lower in the second half of 2018.

      2018 Tax Guidance

      The Company anticipates the overall effective tax rate to normalize over the remainder of 2018 and expects the overall tax rate to be near the higher end of the previous guidance range of 40% to 45% for the full year 2018.

      As previously outlined in the Company's news release dated February 14, 2018, the Company expects its effective tax rates by jurisdiction for the full year 2018 to be:

      Canada - 40% to 50%
      Mexico - 35% to 40%
      Finland - 20%

      Dividend Record and Payment Dates for the Third Quarter of 2018

      Agnico Eagle's Board of Directors has declared a quarterly cash dividend of $0.11 per common share, payable on September 14, 2018, to shareholders of record as of August 31, 2018.  Agnico Eagle has declared a cash dividend every year since 1983.

      Other Expected Dividend and Record Dates for 2018

      Record Date

      Payment Date

      November 30

      December 14

      Dividend Reinvestment Plan

      Please see the following link for information on the Company's dividend reinvestment plan: Dividend Reinvestment Plan

      Second Quarter 2018 Results Conference Call and Webcast Tomorrow

      The Company's senior management will host a conference call on Thursday, July 26, 2018 at 11:00 AM (E.D.T.) to discuss financial results and provide an update of the Company's operating activities.

      Via Webcast:

      A live audio webcast of the conference call will be available on the Company's website www.agnicoeagle.com.

      Via Telephone:

      For those preferring to listen by telephone, please dial 1-647-427-7450 or toll-free 1-888-231-8191.  To ensure your participation, please call approximately ten minutes prior to the scheduled start of the call.

      Replay Archive:

      Please dial 1-416-849-0833 or toll-free 1-855-859-2056, access code 3680786.  The conference call replay will expire on August 26, 2018.  The webcast, along with presentation slides, will be archived for 180 days on the Company's website.

      NORTHERN BUSINESS REVIEW

      ABITIBI REGION, QUEBEC

      Agnico Eagle is currently Quebec's largest gold producer with a 100% interest in the LaRonde, Goldex, Lapa and LaRonde Zone 5 mines and a 50% interest in the Canadian Malartic mine.  These mines are located within 50 kilometres of each other, which provides operating synergies and allows for the sharing of technical expertise.

      LaRonde Mine – Higher Gold Grades Continue to Drive Increased Quarterly Production

      The 100% owned LaRonde mine in northwestern Quebec achieved commercial production in 1988.

      LaRonde Mine - Operating Statistics







      Three Months Ended


      Three Months Ended



      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)


      507


      520

      Tonnes of ore milled per day


      5,571


      5,708

      Gold grade (g/t)


      5.46


      4.51

      Gold production (ounces) 


      84,526


      72,090

      Production costs per tonne (C$)


      $

      158


      $

      118

      Minesite costs per tonne (C$)


      $

      120


      $

      113

      Production costs per ounce of gold produced ($ per ounce): 


      $

      744


      $

      647

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      395


      $

      482

      Production costs per tonne in the second quarter of 2018 increased when compared to the prior-year period due to higher underground and mill maintenance costs, lower tonnage and the timing of unsold concentrate inventory. The higher mill maintenance costs were primarily related to an unscheduled five-day mill shutdown in second quarter of 2018. Production costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above and the strengthening of the Canadian dollar relative to the U.S. dollar between periods, partially offset by higher production.

      Minesite costs per tonne5 in the second quarter of 2018 increased when compared to the prior-year period due to higher underground and mill maintenance costs and lower tonnage.  Total cash costs per ounce in the second quarter of 2018 decreased when compared to the prior-year period due to higher production and by-product metal revenues, partially offset by higher underground and mill maintenance costs and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Gold production in the second quarter of 2018 increased when compared to the prior-year period due to higher grades resulting from the mining sequence in the western pyramid in the lower part of the mine.

      ______________________
      5 Minesite costs per tonne is a non-GAAP measure.  For a reconciliation of this measure to production costs as reported in the financial statements, see "Reconciliation of Non-GAAP Financial Performance Measures" below.  See also "Note Regarding Certain Measures of Performance" below.

      LaRonde Mine - Operating Statistics







      Six Months Ended


      Six Months Ended



      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)


      1,038


      1,079

      Tonnes of ore milled per day


      5,735


      5,960

      Gold grade (g/t)


      5.48


      4.56

      Gold production (ounces) 


      174,311


      151,002

      Production costs per tonne (C$)


      $

      156


      $

      112

      Minesite costs per tonne (C$)


      $

      120


      $

      111

      Production costs per ounce of gold produced ($ per ounce): 


      $

      733


      $

      603

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      412


      $

      473

      Production costs per tonne in the first six months of 2018 increased when compared to the prior-year period due to higher underground and mill maintenance costs, lower tonnage and the timing of unsold concentrate inventory. The higher mill maintenance costs were primarily related to an unscheduled five-day mill shutdown in second quarter of 2018.  Production costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to the reasons described above and the strengthening of the Canadian dollar relative to the U.S. dollar between periods, partially offset by higher production.

      Minesite costs per tonne in the first six months of 2018 increased when compared to the prior-year period due to higher underground and mill maintenance costs and lower tonnage.  Total cash costs per ounce in the first six months of 2018 decreased when compared to the prior-year period due to higher production and by-product metal revenues, partially offset by higher underground and mill maintenance costs and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Gold production in the first six months of 2018 increased when compared to the prior-year period due to higher grades resulting from the mining sequence in the western pyramid in the lower part of the mine.

      Drilling is ongoing at LaRonde 3 with a focus on mineral resource conversion to mineral reserves.  The Company continues to evaluate a phased approach to development between the 311 level (a depth of 3.1 kilometres) and the 350 level (a depth of 3.5 kilometres).

      Under this phased approach, an additional two or three levels will be developed per year in either the east or west areas of the mine through 2022.  This is expected to result in the conversion of mineral resources into mineral reserves, with full mining activities to commence in 2022.  The Company believes that this phased approach is a lower risk, less capital intensive option for developing the deeper levels of the LaRonde mine.

      LaRonde Zone 5 – Commercial Production Declared; Operations Continue to Ramp Up

      In 2003, the Company acquired the LaRonde Zone 5 project (LZ5).  The property lies adjacent to and west of the LaRonde mining complex and previous operators exploited the deposit by open pit.  In February 2017, LZ5 was approved by Agnico Eagle's Board of Directors for development.

      In the first quarter of 2018, development of the first five mining stopes was essentially completed and the first production blast was carried out in May 2018.  Three stopes were blasted by the end of the second quarter of 2018 and a total of 45,200 tonnes of ore (stopes and development) were mined.  Commercial production was achieved on June 1, 2018, coincident with the start of processing LZ5 ore at the Lapa mill circuit.  In addition, the paste plant was commissioned in the second quarter of 2018.

      LaRonde Zone 5 Mine - Operating Statistics





      Three Months Ended



      June 30, 2018

      Tonnes of ore milled (thousands of tonnes)


      56

      Tonnes of ore milled per day


      1,867

      Gold grade (g/t)


      2.75

      Gold production (ounces) 


      4,601

      Production costs per tonne (C$)


      $

      12

      Minesite costs per tonne (C$)


      $

      85

      Production costs per ounce of gold produced ($ per ounce): 


      $

      113

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      796

      Production costs per tonne in the second quarter of 2018 were $12.  Production costs per ounce in the second quarter of 2018 were $113.  Minesite costs per tonne in the second quarter of 2018 were C$85.  Total cash costs per ounce in the second quarter of 2018 were $796.  Gold production in the second quarter of 2018 was 4,601 ounces of gold.

      Currently, a fourth stope is in production and 36,500 tonnes of ore is stockpiled on surface.  Mining will continue at LZ5 over the balance of 2018, but in order to maximize production (tonnage and ounces), ore from LZ5 will be batch processed with ore from Lapa until the end of 2018. Gold production from LZ5 in 2018 is now forecast to be approximately 15,000 ounces (previous guidance was 20,000 ounces), with 2018 total cash costs per ounce expected to be in line with those reported in the second quarter of 2018.

      One production truck arrived at site in the second quarter of 2018.  Additional production equipment (one truck and one scoop tram) and the required material for automated mining at LZ5 are expected to be delivered in the third quarter of 2018.  Pilot testing is expected to start in the fourth quarter of 2018 for both trucks and the scoop tram.  Ultimately, the Company is examining the potential to use the same LTE network that was developed at LZ5 and the automated mining equipment at LaRonde 3.

      Under the current LZ5 mine plan, a total of approximately 350,000 ounces of gold are expected to be mined through 2026.  The Company is evaluating the potential to extend operations at depth and along strike onto the Ellison property, which adjoins LZ5 to the west.  Ellison hosts an indicated mineral resource of 68,000 ounces (651,000 tonnes grading 3.25 g/t gold) as of December 31, 2017.

      Canadian Malartic Mine – New Quarterly Record for Gold Production and Mill Throughput

      In June 2014, Agnico Eagle and Yamana Gold Inc. acquired Osisko Mining Corporation and created the Canadian Malartic General Partnership (the "Partnership").  The Partnership owns and operates the Canadian Malartic mine in northwestern Quebec through a joint management committee.  Each of Agnico Eagle and Yamana has an indirect 50% ownership interest in the Partnership.  All volume numbers in this section reflect the Company's 50% interest in the Canadian Malartic mine, except as noted.

      Canadian Malartic Mine - Operating Statistics







      Three Months Ended


      Three Months Ended



      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)(100%)


      5,266


      5,206

      Tonnes of ore milled per day (100%)


      57,868


      57,209

      Gold grade (g/t)


      1.23


      1.11

      Gold production (ounces)(50%)


      91,863


      82,509

      Production costs per tonne (C$)


      $

      25


      $

      27

      Minesite costs per tonne (C$)


      $

      25


      $

      24

      Production costs per ounce of gold produced ($ per ounce): 


      $

      550


      $

      639

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      537


      $

      540

      Production costs per tonne in the second quarter of 2018 decreased when compared to the prior-year period due to a decrease in contractor costs and higher throughput, partially offset by higher fuel costs.  Production costs per ounce in the second quarter of 2018 decreased when compared to the prior-year period due to higher production and the reasons described above, partially offset by higher fuel costs and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Minesite costs per tonne in the second quarter of 2018 were essentially the same when compared to the prior-year period.  Total cash costs per ounce in the second quarter of 2018 decreased when compared to the prior-year period due to a decrease in contractor costs and higher production, partially offset by higher fuel costs and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Gold production in the second quarter of 2018 increased when compared to the prior-year period due to higher throughput and higher grades, partially offset by slightly lower gold recoveries.

      Canadian Malartic Mine - Operating Statistics







      Six Months Ended


      Six Months Ended



      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)(100%)


      10,286


      10,072

      Tonnes of ore milled per day (100%)


      56,829


      55,646

      Gold grade (g/t)


      1.20


      1.07

      Gold production (ounces)(50%)


      175,266


      153,891

      Production costs per tonne (C$)


      $

      24


      $

      23

      Minesite costs per tonne (C$)


      $

      25


      $

      23

      Production costs per ounce of gold produced ($ per ounce): 


      $

      558


      $

      554

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      551


      $

      548

      Production costs per tonne in the first six months of 2018 were essentially the same when compared to the prior-year period.  Production costs per ounce in the first six months of 2018 increased when compared to the prior-year period due higher fuel costs and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Minesite costs per tonne in the first six months of 2018 increased slightly when compared to the prior-year period due to higher fuel costs, partially offset by higher throughput.  Total cash costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to the reasons described above and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Gold production in the first six months of 2018 increased when compared to the prior-year period due to higher throughput and higher grades, partially offset by slightly lower gold recoveries.

      Work on the Barnat extension project is proceeding on budget and on schedule.  Work is primarily focused on the highway 117 road deviation, pit preparation and tailings expansion.  Production activities at Barnat are scheduled to begin in 2019.

      Infill and Resource Development Drilling Continues at Odyssey Project

      At the Canadian Malartic mine, exploration programs are ongoing to evaluate several near-pit and underground targets.  In addition, the Partnership is exploring the deposits to the east of the Canadian Malartic open pit including the Odyssey, East Malartic, Sladen and Sheehan zones.  These opportunities have the potential to provide new sources of ore for the Canadian Malartic mill.  The 2018 exploration program will consist of 140,000 metres of drilling (100% basis) with a budgeted cost of $8.6 million (50% basis).

      In the second quarter of 2018, 23,726 metres of drilling (49 holes) was completed at the Odyssey Zone and 27,549 metres of drilling (41 holes and 12 deviation wedges) was completed at the East Malartic and Sheehan zones.

      Lapa – Operations Now Expected to Extend into the Fourth Quarter of 2018

      The 100% owned Lapa mine in northwestern Quebec achieved commercial production in May 2009.

      Lapa Mine - Operating Statistics







      Three Months Ended


      Three Months Ended



      June 30, 2018*


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)


      109


      134

      Tonnes of ore milled per day


      1,787


      1,474

      Gold grade (g/t)


      5.02


      4.05

      Gold production (ounces) 


      14,533


      15,881

      Production costs per tonne (C$)


      $

      126


      $

      118

      Minesite costs per tonne (C$)


      $

      135


      $

      114

      Production costs per ounce of gold produced ($ per ounce): 


      $

      740


      $

      741

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      795


      $

      712

      * Milling operations occurred for 61 days in the period

      In the second quarter of 2018, the Lapa mill processed ore for 61 days as the mine approaches the end of operations, therefore, the operating statistics in the above table are not meaningfully comparable to the prior-year period.

      Lapa Mine - Operating Statistics







      Six Months Ended


      Six Months Ended



      June 30, 2018**


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)


      126


      264

      Tonnes of ore milled per day


      1,726


      1,456

      Gold grade (g/t)


      4.88


      4.15

      Gold production (ounces) 


      16,255


      31,241

      Production costs per tonne (C$)


      $

      114


      $

      125

      Minesite costs per tonne (C$)


      $

      135


      $

      124

      Production costs per ounce of gold produced ($ per ounce): 


      $

      694


      $

      789

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      823


      $

      781

      ** Milling operations occurred for 73 days in the period

      In the first six months of 2018, the Lapa mill processed ore for 73 days as the mine approaches the end of operations, therefore, the operating statistics in the above table are not meaningfully comparable to the prior-year period.

      Mining operations at Lapa are now forecast to continue into the fourth quarter of 2018.  Ore from Lapa will be batch processed with ore from LZ5 until the end of 2018.  As a result, gold production from Lapa for the full year 2018 is now forecast to be 25,000 ounces (previous guidance was 10,000 ounces).  Total cash costs per ounce for 2018, are expected to be in line with those in second quarter of 2018.

      Goldex – Drilling on Deep 2 and Deep 3 Zone Expected to Increase Mineral Resources at Year End 2018

      The 100% owned Goldex mine in northwestern Quebec began production from the M and E satellite zones in September 2013.  Commercial production from the Deep 1 Zone commenced on July 1, 2017.

      Goldex Mine - Operating Statistics





      All metrics exclude pre-production tonnes and ounces


      Three Months Ended


      Three Months Ended



      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)


      640


      562

      Tonnes of ore milled per day


      7,033


      6,173

      Gold grade (g/t)


      1.59


      1.48

      Gold production (ounces) 


      30,480


      24,691

      Production costs per tonne (C$)


      $

      42


      $

      35

      Minesite costs per tonne (C$)


      $

      42


      $

      36

      Production costs per ounce of gold produced ($ per ounce): 


      $

      687


      $

      596

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      680


      $

      603

      Production costs per tonne in the second quarter of 2018 increased when compared to the prior-year period due to higher contractor and consumable costs, partially offset by higher throughput levels (after deducting development ore tonnage from pre-commercial production at the Deep 1 Zone in the second quarter of 2017).  Production costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to the strengthening of the Canadian dollar relative to the U.S. dollar between periods and the reasons described above, partially offset by higher production (after deducting pre-commercial ounces in the second quarter of 2017).

      Minesite costs per tonne in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above.  Total cash costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above.

      Gold production in the second quarter of 2018 increased when compared to the prior-year period due to higher throughput.  As stope development in the Deep 1 area matures through 2018, Rail-Veyor utilization is expected to increase.  This is expected to lead to a reduction in unit costs.

      Goldex Mine - Operating Statistics





      All metrics exclude pre-production tonnes and ounces


      Six Months Ended


      Six Months Ended



      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)


      1,298


      1,146

      Tonnes of ore milled per day


      7,171


      6,332

      Gold grade (g/t)


      1.50


      1.58

      Gold production (ounces) 


      58,404


      54,967

      Production costs per tonne (C$)


      $

      39


      $

      37

      Minesite costs per tonne (C$)


      $

      39


      $

      36

      Production costs per ounce of gold produced ($ per ounce): 


      $

      677


      $

      574

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      677


      $

      564

      Production costs per tonne in the first six months of 2018 increased when compared to the prior-year period due to higher contractor and consumable costs, partially offset by higher throughput levels (after deducting development ore tonnage from pre-commercial production at the Deep 1 Zone in the first six months of 2017).  Production costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to the strengthening of the Canadian dollar relative to the U.S. dollar between periods and the reasons described above, partially offset by higher production (after deducting pre-commercial ounces in the first six months of 2017).

      Minesite costs per tonne in the first six months of 2018 increased when compared to the prior-year period due to the reasons described above.  Total cash costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to the reasons described above.

      Gold production in the first six months of 2018 increased when compared to the prior-year period due to higher throughput.

      Drilling and development is ongoing in the South Zone, which is accessible from the Deep 1 Zone infrastructure.  The South Zone consists of quartz veins that have higher grades than those in the primary mineralized zones at Goldex.  The Company is evaluating the potential for the South Zone to provide incremental ore feed to the Goldex mill.  A test stope in the South Zone is now expected to be mined in the fourth quarter of 2018 (previously August 2018).  The delay is due to a re-prioritization of development elsewhere in the mine, primarily related to advancement of the ramp to access Deep 2 and 3.

      In the third quarter of 2018, there will be a two-week scheduled shutdown at Goldex to update the hoist drive controls, which will affect underground operations.  During this downtime, there will be a one-week scheduled shutdown to carry out mill maintenance.  Stockpiled ore will be milled during one week of the underground shutdown.

      Akasaba West Update

      The Company acquired the Akasaba West gold-copper deposit in January 2014.  Located less than 30 kilometres from Goldex, the Akasaba West deposit could create flexibility and synergies for the Company's operations in the Abitibi region by using extra milling capacity at both Goldex and LaRonde, while reducing overall unit costs.

      In a decision issued on June 27, 2018, the Canadian Minister of Environment and Climate Change determined that the Akasaba West project is not likely to cause significant environmental effects and can proceed.  The decision was subject to several conditions which will be implemented by the Company.  This was followed on June 28, 2018, by the approval of the Decree for the project by the Quebec Ministers in Council.  The Company will now proceed with applications for the Certificate of Authorization and the mining lease.

      The Company is reviewing the timeline for the integration of the Akasaba West project into the Goldex production profile.  Over a five-year mine life, total production is expected to be approximately 115,000 ounces of gold and 21,000 tonnes of copper at total cash costs per ounce of $550 to $600.

      Deep 2 Zone Extended to East and West

      The main target of exploration at Goldex continues to be the Deep 2 Zone, which is the part of the Deep Zone between 1,200 metres and 1,500 metres depth, as well as the Deep 3 Zone (below 1,500 metres).  The Deep 2 Zone is estimated to have indicated mineral resources of 213,000 ounces of gold (2.9 million tonnes grading 2.27 g/t gold) and inferred mineral resources of 322,000 ounces of gold (7.2 million tonnes grading 1.39 g/t gold) as of December 31, 2017.  Exploration results from Goldex were last reported in the Company's news release dated February 11, 2015.

      Drilling of the Deep 2 and Deep 3 zones is being done from the Deep 1 Zone on level 120 and from the exploration ramp, which has now reached level 125.  Drilling of the Deep 2 and Deep 3 zones began in February 2018.  In the first half of 2018, 46 holes (15,107 metres) were drilled; assays are pending for many of the holes.

      Selected recent drill results are set out in the table below, and drill-hole collar coordinates are set out in a table in the Appendix of this news release.  Pierce points for these holes are shown on the Goldex Mine Composite Longitudinal Section.  All intercepts reported for the Goldex mine show uncapped and capped gold grades over estimated true widths, based on a current geological interpretation that is being updated as new information becomes available with further drilling.

      Recent exploration drill results from the Deep 2 and Deep 3 zones at the Goldex mine

      Drill hole

      Zone

      From

      (metres)

      To
      (metres)

      Depth of
      midpoint below
      surface (metres)

      Estimated
      true width
      (metres)

      Gold grade
      (g/t)
      (uncapped)

      Gold grade
      (g/t)
      (capped)

      GD120-250

      Deep 2

      129.0

      213.0

      1,260

      70.0

      1.7

      1.7

      GD120-251

      Deep 2

      199.0

      256.5

      1,310

      45.0

      1.5

      1.5

      GD120-258

      Deep 2

      175.5

      199.5

      1,360

      11.0

      1.5

      1.5

        and

      Deep 3

      406.5

      454.5

      1,580

      23.0

      3.4

      3.4

      GD120-266

      Deep 3

      412.5

      441.0

      1,570

      15.0

      2.3

      2.3

      *Goldex intercepts are capped at 30 g/t gold.

      [Goldex Mine Composite Longitudinal Section]

      Of particular interest are the results of two holes that fanned downward from level 120, confirming the known indicated mineral resources in a location where there had been no previous drilling, between level 125 and level 140 (1,250 to 1,400 metres depth).  Hole GD120-250 intersected 1.7 g/t gold over 70.0 metres at 1,260 metres depth, while hole GD120-251 intersected 1.5 g/t gold over 45.0 metres at 1,310 metres depth.  These results have the potential to expand and/or upgrade  the indicated mineral resources in this area.

      Other recent drilling has intersected gold mineralization outside the current mineral resources envelope, which has the potential to increase the inferred mineral resources of the Deep 2 Zone.  In the central part of the deposit, hole GD120-258 intersected 1.5 g/t gold over 11.0 metres at 1,360 metres depth; the same hole had a higher-grade intercept at depth, intersecting 3.4 g/t gold over 23.0 metres at 1,580 metres depth.  In the western part of the deposit, hole GD120-266 intersected 2.3 g/t gold over 15.0 metres at 1,570 metres depth.  The results of this program are expected to enlarge the mineral resources estimate for the Deep 2 and Deep 3 zones in the year-end mineral resource update.

      The 2018 exploration program is budgeted at $1.1 million, including 10,000 metres of drilling focused on the Deep 3 Zone and on the adjacent Joubi property.  The conversion program in 2018 is budgeted at $5.2 million, including 63,900 metres of drilling focused on the Deep 1, Deep 2 and South zones.

      Kirkland Lake Project Update – 2018 Drilling Program Has Commenced

      The Kirkland Lake project in northeastern Ontario covers approximately 27,312 hectares, and mineral reserves and mineral resources have been outlined on several properties.  The properties have been owned 100% by Agnico Eagle since March 28, 2018, when the Company completed the acquisition of Yamana's indirect 50% interest in the Canadian exploration assets of Canadian Malartic Corporation ("CMC") that it did not previously own.  Deposits in the Kirkland Lake project include: Upper Beaver, Upper Canada, Anoki and McBean, and Amalgamated Kirkland.

      At Kirkland Lake, an initial $5.4 million exploration program consisting of 20,000 metres of drilling is planned for 2018.  The drilling commenced in July.  The primary exploration focus at the Kirkland Lake project in 2018 will be extending the Upper Beaver deposit at depth, and testing for satellite targets around the Upper Canada deposit.  In addition, the Company is completing a technical review of all exploration data for the Upper Beaver deposit to determine the next steps at the property.  An advanced exploration program is being prepared to validate the technical aspects and the extended potential of the Upper Beaver property.  The Company is evaluating potential synergies between the Upper Beaver and Upper Canada projects and its other Abitibi operations.  An early-stage study is expected to be completed by the end of the year.

      NUNAVUT REGION

      Agnico Eagle has identified Nunavut as a politically attractive and stable jurisdiction with enormous geological potential.  With the Company's Meadowbank mine and two significant development assets (Meliadine and the Amaruq satellite deposit at Meadowbank) and other exploration projects, Nunavut has the potential to be a strategic operating platform with the ability to generate strong production and cash flows over several decades.

      Meadowbank – Production and Costs Expected to Improve in the Second Half of 2018

      The 100% owned Meadowbank mine in Nunavut, northern Canada, achieved commercial production in March 2010.  The mine produced its two millionth ounce of gold in 2015.

      Meadowbank Mine - Operating Statistics







      Three Months Ended


      Three Months Ended



      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)


      844


      996

      Tonnes of ore milled per day


      9,275


      10,948

      Gold grade (g/t)


      2.41


      3.26

      Gold production (ounces) 


      59,627


      95,289

      Production costs per tonne (C$)


      $

      86


      $

      73

      Minesite costs per tonne (C$)


      $

      85


      $

      73

      Production costs per ounce of gold produced ($ per ounce): 


      $

      947


      $

      571

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      920


      $

      559

      Production costs per tonne in the second quarter of 2018 increased when compared to the prior-year period primarily due to increased maintenance costs on excavation and drilling equipment, lower throughput levels and the timing of unsold inventory.  Production costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above, lower gold production and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Minesite costs per tonne in the second quarter of 2018 increased when compared to the prior-year period primarily due to increased maintenance costs on excavation and drilling equipment and lower throughput levels.  Total cash costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above, lower gold production and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Gold production in the second quarter of 2018 decreased when compared to the prior-year period due to anticipated lower grades and processing ore that was harder than previously anticipated at the Vault pit, which resulted in lower throughput levels.

      Meadowbank Mine - Operating Statistics







      Six Months Ended


      Six Months Ended



      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)


      1,674


      1,922

      Tonnes of ore milled per day


      9,249


      10,620

      Gold grade (g/t)


      2.47


      3.19

      Gold production (ounces) 


      121,074


      180,659

      Production costs per tonne (C$)


      $

      90


      $

      75

      Minesite costs per tonne (C$)


      $

      86


      $

      73

      Production costs per ounce of gold produced ($ per ounce): 


      $

      974


      $

      600

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      921


      $

      573

      Production costs per tonne in the first six months of 2018 increased when compared to the prior-year period primarily due to increased maintenance costs on excavation and drilling equipment, lower throughput levels and the timing of unsold inventory.  Production costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to the reasons described above, lower gold production and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Minesite costs per tonne in the first six months of 2018 increased when compared to the prior-year period primarily due to increased maintenance costs on excavation and drilling equipment and lower throughput levels.  Total cash costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to the reasons described above, lower gold production and the strengthening of the Canadian dollar relative to the U.S. dollar between periods.

      Gold production in the first six months of 2018 decreased when compared to the prior-year period due to anticipated lower grades and processing ore that was harder than previously anticipated at the Vault pit, which resulted in lower throughput levels.

      Amaruq Project – Construction Activities Commence Following Receipt of Whale Tail Type A Water Licence

      Agnico Eagle has a 100% interest in the Amaruq project, approximately 50 kilometres northwest of the Meadowbank mine.  Amaruq is situated on a 99,878-hectare property, almost adjacent to the 68,735-hectare Meadowbank property.  Development of the Amaruq project was approved in February 2017 by the Company's Board of Directors as a satellite deposit to supply ore to the existing Meadowbank mill, pending the receipt of the required permits.

      On July 11, 2018, the Minister of Crown-Indigenous Relations and Northern Affairs Canada (formerly Indigenous and Northern Affairs Canada) approved Agnico Eagle's Type A Water Licence for the Whale Tail pit, which had been issued by the Nunavut Water Board on May 30, 2018.  This approval authorizes the Company to commence development activities on the Whale Tail pit.

      In late July 2018, the Company began construction activities related to the Whale Tail dike (rock fill had already been stockpiled for use as approved in the pre-development licence) and progressive overburden and waste stripping for Phase 1 of the Whale Tail Pit.

      The Amaruq project remains on budget with capital expenditures in 2018 forecast to be approximately $175 million.  For additional details, please see the Company news release dated July 16, 2018.

      Meliadine Project – Boat Sealift Underway, Construction Activities are on Schedule and on Budget; Drilling Extends Mineralization at Tiriganiaq

      Located near Rankin Inlet, Nunavut, Canada, the Meliadine project was acquired in July 2010, and is Agnico Eagle's largest gold deposit in terms of mineral resources.  The Company owns 100% of the 111,358 hectare property.  In February 2017, the Company's Board of Directors approved the construction of the Meliadine project.

      Underground development and surface construction at Meliadine continued through the second quarter of 2018 and the project remains on schedule and on budget for the commencement of production in the second quarter of 2019.  The estimated capital budget for 2018 is unchanged at $398 million.

      On July 9, 2018, the first vessel of the sealift shipping season arrived in Rankin Inlet.  The first boat has been unloaded and shipping activities are expected to continue into October 2018.

      Second Quarter 2018 Activities and Additional Opportunities to Create Value at Meliadine

      Recent development/construction highlights include:

      • At end of the second quarter of 2018, construction was 74% complete
      • The mine dry, offices and the multi-service building were delivered to operations in the second quarter of 2018
      • The second phase of construction involving civil works at the crusher and paste plant was started in the second quarter of 2018
      • Mechanical/Piping/Electrical/Instrumentation (MPEI) at both the process plant and power plant were essentially completed by the end of the second quarter of 2018.  The remaining components required for completion of these two plants are expected to be delivered during the 2018 sea lift
      • Commissioning of the process plant is expected to begin in the first quarter of 2019
      • In the second quarter of 2018, approximately 2,143 metres of lateral underground development was completed, which was slightly ahead of budget.  The main development focus was on the lower levels and Ramp 3
      • In the second quarter of 2018, the Portal #2 production down ramp was connected with the up ramp from Portal #1
      • In the second quarter of 2018, approximately 6,707 metres of underground delineation drilling was completed, which is in line with the budget.  As a result, 100% of the stopes that will be mined in 2018 have been delineated.  Stope delineation for 2019 is progressing as expected
      • Results from the delineation drilling have generally been in line with the block model
      • Production equipment (drilling and blasting) is being shipped to site in the current barge season.  This equipment will be used to begin mining of the delineated stopes in the fourth quarter of 2018

      The Company believes that there are numerous opportunities to create additional value at Meliadine, both at the mine and on the large regional land package.  These include:

      • Optimization of the current mine plan by advancing the Phase 2 expansion through either open pit development and/or deepening the underground mine
      • Potential to optimize labour costs once the mine is in operation (via improved use of telecommunications or automation)
      • Minesite exploration upside through mineral resource conversion and expansion of known ore zones (most zones are open below a vertical depth of 450 metres)
      • Potential for the discovery of new deposits along the prospective 80-kilometre-long greenstone belt

      Drilling Extends Mineralization at Tiriganiaq and Shows Potential to Increase Mineral Resources

      The Meliadine project includes seven gold deposits, six of which are part of the current mine plan.  Tiriganiaq is the largest of the deposits with the bulk of the mineral reserves; it has a strike length of approximately 3.0 kilometres at surface and a depth of slightly more than 700 metres.

      The current interpretation is that Tiriganiaq is an orogenic deposit made of numerous quartz veins, as well as folded and thrust-faulted mineralized iron formation.  The main lode in terms of gold content at Meliadine is Tiriganiaq's lode 1000, which is a decimetre- to metre-wide quartz-carbonate vein located along the Lower Fault, a regional structure along the contact of sedimentary rock with mafic volcanics.  Lodes 1100, 1150s and 1250s are interpreted to be folded/thrust iron formation injected by quartz-carbonate veins and arsenopyrite mineralization.

      Exploration resumed at the Tiriganiaq deposit in January 2018 after a three-year hiatus while the Company evaluated the project and initial development work began.  In the first six months of 2018, the Company drilled 4,625 metres in eight exploration drill holes and 8,667 metres in 25 conversion drill holes at the Meliadine project, part of the 19,000 metres of conversion drilling and 10,000 metres of exploration drilling budgeted in 2018.  Exploration results at Meliadine were last reported in the Company's news release dated July 30, 2014.

      Selected recent intercepts from the project are set out in the table below.  The drill hole collar coordinates are set out in a table in the Appendix of this news release.  The pierce points are shown on the Meliadine project composite longitudinal section.  All intercepts reported for the Meliadine project show uncapped and capped grades over estimated true widths, based on a preliminary geological interpretation that is being updated as new information becomes available with further drilling.

      Recent exploration drill results from the Tiriganiaq deposit, Meliadine project

      Drill hole

      Lode

      From
      (metres)

      To
      (metres)

      Depth of
      midpoint
      below
      surface
      (metres)

      Estimated
      true width
      (metres)

      Gold grade
      (g/t)
      (uncapped)

      Gold
      grade (g/t)
      (capped)*

      M18-2434

      1025

      690.5

      693.8

      647

      3.0

      10.5

      10.5

        and

      1000

      699.0

      706.3

      655

      6.9

      6.1

      6.1

      M18-2434W2

      1100

      651.0

      654.0

      597

      2.8

      11.5

      11.5

        and

      1015

      670.2

      680.8

      616

      10.0

      4.3

      4.3

      M18-2438

      1253

      516.9

      530.6

      483

      12.8

      27.3

      27.3

        and

      1100

      577.5

      588.6

      535

      10.2

      19.6

      19.6

      M18-2441W1

      1000

      789.7

      793.0

      711

      3.0

      7.9

      7.9

      *   Holes at the Tiriganiaq deposit use a capping factor between 100 and 400 g/t gold, based on lithologies.

      [Meliadine Project Composite Longitudinal Section]

      The conversion drill program is expected to result in an increase of both the indicated mineral resources and the probable mineral reserves of the Tiriganiaq deposit.  Drilling has confirmed the continuity of the mineralization in the deeper portions of the Tiriganiaq deposit.  Hole M18-2438 returned an impressive 27.3 g/t gold over 12.8 metres at 483 metres depth that is expected to extend the inferred mineral resources envelope of the 1250s lodes.  The same hole returned 19.6 g/t gold over 10.2 metres (lode 1100) at 535 metres depth, while approximately 400 metres to the west hole M18-2434W2 intersected 11.5 g/t gold over 2.8 metres at 597 metres depth in the 1100 lode.

      Recent results from the exploration program at Tiriganiaq include hole M18-2441W1, approximately 700 metres east of hole M18-2438, that intersected 7.9 g/t gold over 3.0 metres at 711 metres depth in an area approximately 300 metres below the current mineral resources envelope, which opens up a new area for exploration and enhances the underground potential of the deposit.  This intercept is in the same lode (1000) that was intersected approximately 900 metres to the west by conversion hole M18-2434 that yielded 6.1 g/t gold over 6.9 metres at 655 metres depth.

      The plan in the second half of 2018 is to continue the conversion program with another 8,300 metres of drilling in the inferred mineral resources located below the mineral reserves envelope, with follow-ups to holes M18-2434, M18-2434W2 and M18-2438 at conversion spacing.  The exploration program will continue, with another 7,400 metres of drilling at depth below these three holes.  The area between hole M18-2441W1 and the other holes located to the west will be investigated.

      FINLAND AND SWEDEN

      Agnico Eagle's Kittila mine in Finland is the largest primary gold producer in Europe and hosts the Company's largest mineral reserves.  Exploration activities continue to expand the mineral reserves and mineral resources and the Company has approved an expansion to add an underground shaft and increase expected mill throughput by 25 percent to 2.0 million tonnes per annum ("mtpa").  In Sweden, the Company has a 55% interest in the Barsele exploration project.

      Kittila – Expansion of Roura Main Zone, Sisar Top and Central Areas and Rimpi Deep Area

      The 100% owned Kittila mine in northern Finland achieved commercial production in 2009.

      Kittila Mine - Operating Statistics







      Three Months Ended


      Three Months Ended



      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)


      423


      439

      Tonnes of ore milled per day


      4,648


      4,829

      Gold grade (g/t)


      3.63


      3.84

      Gold production (ounces) 


      42,049


      47,156

      Production costs per tonne (EUR)


      $

      78


      $

      75

      Minesite costs per tonne (EUR)


      $

      80


      $

      77

      Production costs per ounce of gold produced ($ per ounce): 


      $

      922


      $

      772

      Total cash costs per ounce of gold produced ($ per ounce): 


      $

      945


      $

      802

      Production costs per tonne in the second quarter of 2018 increased when compared to the prior-year period due to higher contractor costs and lower throughput levels.  Production costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above, lower gold production and the strengthening of the Euro relative to the U.S. dollar between periods.

      Minesite costs per tonne in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above.  Total cash costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above.

      Gold production was lower in the second quarter of 2018 compared to the prior-year period as a result of lower grades and recoveries.  The lower grade resulted from a delay in accessing higher grade Roura stopes due to a re-prioritization of underground development.  As a result, marginal stopes (that were already developed) were mined in the second quarter of 2018 to manage stockpile flexibility.  Development is expected to be back on schedule in the third quarter of 2018, and the higher grade stopes are expected to be mined in the fourth quarter of 2018 and the first quarter of 2019.  Recoveries were slightly below forecast in the second quarter of 2018 due to higher than expected thiocyanate concentrations in the reclaim water pond.  Thiocyanate levels are expected to decline during the summer months and a new water treatment strategy is being developed to address this issue.

      Kittila Mine - Operating Statistics





      Six Months Ended


      Six Months Ended


      June 30, 2018


      June 30, 2017

      Tonnes of ore milled (thousands of tonnes)

      891


      862

      Tonnes of ore milled per day

      4,923


      4,764

      Gold grade (g/t)

      3.70


      4.06

      Gold production (ounces) 

      90,167


      98,777

      Production costs per tonne (EUR)

      $

      76


      $

      76

      Minesite costs per tonne (EUR)

      $

      77


      $

      76

      Production costs per ounce of gold produced ($ per ounce): 

      $

      904


      $

      732

      Total cash costs per ounce of gold produced ($ per ounce): 

      $

      911


      $

      732

      Production costs per tonne in the first six months of 2018 were the same when compared to the prior-year period.  Production costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to lower gold production and the strengthening of the Euro relative to the U.S. dollar between periods.

      Minesite costs per tonne in the first six months of 2018 were essentially the same when compared to the prior-year period.  Total cash costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to lower gold production and the strengthening of the Euro relative to the U.S. dollar between periods.

      Production was lower in the six months of 2018 compared to the prior-year period as a result of lower grades and recoveries, as further described above.

      In February 2018, the Company's Board of Directors approved an expansion to increase throughput rates at Kittila to 2.0 mtpa from the current rate of 1.6 mtpa.  This expansion includes the construction of a 1,044 metre deep shaft, a processing plant expansion as well as other infrastructure and service upgrades over a period from 2018 to 2021.

      This expansion project is expected to increase the efficiency of the mine and decrease or maintain current operating costs while providing access to the deeper mining horizons.  In addition, the shaft is expected to provide access to the mineral resources located below 1,150 metres, where recent exploration programs have shown promising results.

      The Kittila shaft/mill expansion is progressing on schedule and on budget.  Major contracts have been signed, mobilization is complete and permitting is underway.

      The pilot hole for the shaft has been drilled to a depth of 325 metres and development to provide access on the 350 level has been completed.  Shaft raise boring is expected to start in the third quarter of 2018 and the hoist has been ordered.

      Phase 1 of the mill expansion is underway with engineering expected to be finalized in August 2018 followed by the commencement of site work.  The first mill tie-ins are expected to be completed during a scheduled mill shutdown in the spring of 2019.  Structural work is underway on the Rimpi Paste plant and the underground paste line will be started in the second half of 2018.  The Rimpi Paste plant is expected to be completed in the first quarter of 2019.

      Capital expenditures for the expansion project in 2018 remain on budget at €21 million.

      Drilling Expected to Increase and Upgrade Kittila Mineral Resources in Multiple Zones

      The main target of exploration at Kittila continues to be the Sisar Zone, which is subparallel to and slightly east of the main Kittila mineralization.  Sisar forms a roughly triangular shape located between approximately 775 metres and 1,910 metres below surface along a 1,900-metre north-south strike length; the zone remains open at depth and along strike.  Mineral reserves in the Sisar Zone form part of the total Kittila mineral reserves estimate.  Note that "Sisar Top" is approximately 775 to 1,000 metres below surface, and "Sisar Central" is between 1,100 and 1,300 metres below the surface.  Some of the Sisar mineralized lenses extend from the Top to the Central sections.

      The main exploration ramp is the platform now used for testing the extensions of the Roura and Rimpi zones.  Two internal ramps are being driven off the main exploration ramp for converting and exploring the Sisar Top Zone and Rimpi Deep mineral resources between 800 and 1,000 metres below surface.  Exploration from Kittila was last reported in the Company's news release dated February 14, 2018.

      In the first half of 2018, 41 holes (16,466 metres) were drilled in the Sisar Top and Sisar Central zones, Roura Zone and Rimpi Deep Zone; assays are pending for many of the holes.

      Selected recent drill results are set out in the table below, and drill-hole collar coordinates are set out in a table in the Appendix of this news release.  Pierce points for these holes are shown on the Kittila Composite Longitudinal Section.  All intercepts reported for the Kittila mine show uncapped grades over estimated true widths, based on a current geological interpretation that is being updated as new information becomes available with further drilling.

      Recent exploration drill results from the Sisar and Roura zones and Rimpi Deep area at the Kittila mine

      Drill hole

      Zone

      From
      (metres)

      To
      (metres)

      Depth of
      midpoint
      below
      surface
      (metres)

      Estimated
      true width
      (metres)

      Gold grade
      (g/t)
      (uncapped)

      RIE17-616

      Main - Rimpi

      71.7

      77.7

      925

      5.6

      4.9

      RIE17-618*

      Sisar Top

      407.0

      410.9

      1,076

      3.2

      3.2

      RIE17-620

      Main - Rimpi

      77.0

      80.2

      918

      3.0

      3.9

      RIE17-625

      Sisar Central

      442.8

      448.0

      1,113

      4.2

      3.1

      RIE17-701

      Sisar Central

      665.0

      669.8

      1,330

      3.0

      3.4

      RIE18-600

      Main - Rimpi

      90.0

      110.0

      940

      16.3

      4.5

        and

      Main - Rimpi

      119.0

      123.0

      947

      3.3

      4.1

        and

      Sisar Top

      355.1

      376.0

      1,013

      18.3

      3.0

        including

      Sisar Top

      355.1

      358.4

      1,011

      2.9

      5.7

      RIE18-601

      Main-Rimpi

      114.0

      149.0

      978

      23.6

      3.5

        and 

      Main-Rimpi

      183.0

      188.0

      1,006

      3.4

      8.5

      RIE18-604

      Main - Rimpi

      116.0

      121.0

      998

      3.1

      4.9

      RIE18-605

      Main-Rimpi

      162.0

      168.0

      1,021

      3.1

      3.5

      RIE18-606

      Main-Rimpi

      93.0

      100.0

      939

      5.6

      3.3

        and

      Main-Rimpi

      118.0

      122.8

      948

      3.9

      4.6

      ROD17-700H

      Main-Roura

      625.5

      632.9

      1,347

      3.5

      11.7

      ROD17-700I

      Main-Roura

      486.0

      498.0

      1,192

      4.6

      4.3

      ROU18-600

      Sisar Top

      138.0

      146.0

      888

      7.9

      3.9

      ROU18-612

      Main-Roura

      150.0

      154.0

      884

      3.7

      3.0

      ROU18-613

      Sisar Top

      144.0

      155.0

      931

      10.6

      3.6

      ROU18-615

      Sisar Top

      189.9

      197.0

      1,019

      5.6

      8.3

      *Hole RIE17-618 was previously reported in Agnico Eagle's February 14, 2018 news release.

      [Kittla Composite Longitudinal Section]

      Exploration drilling of the Rimpi Deep area from the exploration ramp continued in the first half of 2018.  Recent intercepts have confirmed the Main Zone at Rimpi and extended it northward at approximately 950 metres below surface.  Hole RIE17-616 intersected 4.9 g/t gold over 5.6 metres at 925 metres depth, while hole RIE18-604 intersected 4.9 g/t gold over 3.1 metres at 998 metres depth.  These two intercepts extend the Main Zone mineralization approximately 50 metres to the north in this area.

      Three other holes have confirmed Main Zone mineral resources at Rimpi at a similar depth.  Hole RIE17-620 intersected 3.9 g/t gold over 3.0 metres at 918 metres depth, confirming the current Main Zone mineral resources at Rimpi.  Hole RIE18-600 intersected two lenses of the Rimpi Main Zone: 4.5 g/t gold over 16.3 metres at 940 metres depth and 4.1 g/t gold over 3.3 metres at 947 metres depth.  Exploration hole RIE18-601 intersected a wide and variably mineralized zone, yielding 3.5 g/t gold over 23.6 metres at 978 metres depth.  The same hole intersected another lens approximately 55 metres to the east of the first intercept, yielding 8.5 g/t gold over 3.4 metres at 1,006 metres depth, outside of the current mineral resources.

      Recent drilling has also extended the Sisar Zone northward at approximately 1,100 metres depth.  Hole RIE18-600 intersected 3.0 g/t gold over 18.3 metres at 1,013 metres depth, including 5.7 g/t gold over 2.9 metres at the northern extent of the Sisar Top Zone.  Hole RIE17-625 intersected 3.1 g/t gold over 4.2 metres at 1,113 metres depth, approximately 250 metres east of the Main Zone.  This intercept may represent a northward extension of the Sisar Central Zone, similar to and 100 metres north of hole RIE17-618 that intersected 3.2 g/t gold over 3.2 metres at 1,076 metres depth (previously reported in the Company's February 14, 2018 news release).

      A deep exploration hole drilled from the ramp intersected mineralization 200 metres east of the Main Zone.  Hole RIE17-701 intersected 3.4 g/t gold over 3.0 metres at 1,330 metres depth.  This intercept may represent a 120-metre northward extension of the Sisar Central Zone at this depth.

      Drilling of the Roura area from the exploration ramp continues.  Recent intercepts have confirmed the Sisar Top Zone mineral reserves and mineral resources in this area.  Exploration hole ROU18-615 returned 8.3 g/t gold over 5.6 metres at 1,019 metres depth.  At a slightly higher elevation, exploration hole ROU18-613 intersected 3.6 g/t gold over 10.6 metres at 931 metres depth, while exploration hole ROU18-600 returned 3.9 g/t gold over 7.9 metres at 888 metres depth.

      Deep exploration has confirmed and extended the mineral reserves and mineral resources at the Main Zone in the Roura area.  Hole ROD17-700H intersected 11.7 g/t gold over 3.5 metres at 1,347 metres depth, while hole ROD17-700I intersected 4.3 g/t gold over 4.6 metres at 1,192 metres depth.

      The 2018 exploration program is budgeted at $9.2 million, including 36,000 metres of drilling focused on extending the Roura and Rimpi zones.

      SOUTHERN BUSINESS REVIEW

      Agnico Eagle's Southern Business operations are focused in Mexico.  These operations have been a solid source of precious metals production (gold and silver) with stable operating costs and strong free cash flow since 2009.

      Pinos Altos – Drilling at Reyna de Plata Expected to Upgrade Mineral Resources

      The 100% owned Pinos Altos mine in northern Mexico achieved commercial production in November 2009.

      Pinos Altos Mine - Operating Statistics





      Three Months Ended


      Three Months Ended


      June 30, 2018


      June 30, 2017

      Tonnes of ore processed (thousands of tonnes)

      603


      620

      Tonnes of ore processed per day

      6,626


      6,811

      Gold grade (g/t)

      2.43


      2.65

      Gold production (ounces) 

      43,646


      48,196

      Production costs per tonne (USD)

      $

      58


      $

      46

      Minesite costs per tonne (USD)

      $

      58


      $

      46

      Production costs per ounce of gold produced ($ per ounce): 

      $

      796


      $

      595

      Total cash costs per ounce of gold produced ($ per ounce): 

      $

      608


      $

      373

      Production costs per tonne in the second quarter of 2018 increased when compared to the prior-year period due to lower throughput, higher costs associated with underground mining and the timing of unsold inventory.  Production costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due lower gold production and the reasons described above.

      Minesite costs per tonne in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above.  Total cash costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above, lower gold production and lower by-product revenues.

      Gold production in the second quarter of 2018 decreased when compared to the prior-year period due to lower throughput and lower grades.

      Pinos Altos Mine - Operating Statistics





      Six Months Ended


      Six Months Ended


      June 30, 2018


      June 30, 2017

      Tonnes of ore processed (thousands of tonnes)

      1,122


      1,173

      Tonnes of ore processed per day

      6,199


      6,482

      Gold grade (g/t)

      2.52


      2.67

      Gold production (ounces) 

      85,482


      93,556

      Production costs per tonne (USD)

      $

      62


      $

      45

      Minesite costs per tonne (USD)

      $

      60


      $

      47

      Production costs per ounce of gold produced ($ per ounce): 

      $

      812


      $

      560

      Total cash costs per ounce of gold produced ($ per ounce): 

      $

      574


      $

      366

      Production costs per tonne in the first six months of 2018 increased when compared to the prior-year period due to lower throughput, higher costs associated with underground mining and the timing of unsold inventory.  Production costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to the reasons described above, the strengthening of the Mexican peso relative to the U.S. dollar between periods and lower gold production.

      Minesite costs per tonne in the first six months of 2018 increased when compared to the prior-year period due to the reasons described above.  Total cash costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to the reasons described above, lower gold production, the strengthening of the Mexican peso relative to the U.S. dollar between periods and lower by-product revenue.

      Gold production in the first six months of 2018 decreased when compared to the prior-year period due to lower throughput and lower gold grades.

      In 2018, Pinos Altos is transitioning into a predominantly underground mining operation, with associated higher costs.  The development of satellite deposits provides an opportunity to lower unit costs by filling available capacity at the processing and heap leaching facility.  Optimization opportunities are being studied to reduce unit costs.

      A key priority in the second quarter of 2018 was on the continued advancement of the Sinter and Cubiro satellite deposits at Pinos Altos.  The Sinter deposit will be mined from underground and a small open pit.  At Sinter, earthwork was carried out to allow ramp development to begin in the third quarter of 2018.  Initial production from Sinter is expected to commence in the fourth quarter of 2018.

      At the Cubiro deposit, which could potentially supply high-grade ore to the Pinos Altos processing facilities, site activities (road construction and ramp preparation) are approximately 25% complete.  Portal and ramp development will be initiated once the access road is complete; 420 metres of underground development is planned to start in the fourth quarter of 2018.  Underground exploration and delineation drilling is expected to commence in 2019.

      Exploration in the Second Quarter of 2018 Focused on Reyna de Plata Deposit

      The Reyna de Plata deposit is an opportunity for another satellite source of ore on the Pinos Altos property, approximately 1,200 metres north of the Oberon de Weber pit.  The Company is studying different mining options to advance the deposit into the Pinos Altos production schedule.

      The Reyna de Plata deposit hosts inferred mineral resources of 110,000 ounces gold and 3.9 million ounces silver (5.8 million tonnes grading 0.59 g/t gold and 21.14 g/t silver) at open pit depth, as well as 93,000 ounces gold and 1.4 million ounces silver (1.2 million tonnes grading 2.35 g/t gold and 35.11 g/t silver) at underground depth.  These inferred mineral resources formed part of the total Pinos Altos mineral resources estimate as of December 31, 2017.  The current exploration program is part of the activities to increase the mineral resources at Reyna de Plata.

      Exploration permits were received for the Reyna de Plata deposit in the fourth quarter of 2017, and a drill program commenced in mid-January 2018.  In the second quarter of 2018, exploration included 5,802 metres (58 holes) of infill drilling focused on converting inferred mineral resources to indicated mineral resources within the current resources pit model, and step-out drilling to extend the mineral resources beyond the current pit model.  Total drilling in the first half of 2018 was 9,252 metres.  Drilling results for Reyna de Plata were last reported in the Company's news release dated April 26, 2018.

      Exploration drilling at the Pinos Altos complex in the second quarter of 2018 totaled 13,901 metres (105 holes) including the drilling at Reyna de Plata (noted above) as well as 2,094 metres (13 holes) at Bravo and 6,005 metres (34 holes) at Madrono.  The Pinos Altos site exploration drilling in the first six months of 2018 total 22,901 metres, of the 31,000 metres of drilling budgeted for the year.

      Selected recent drill results from the Reyna de Plata deposit are set out in the table below and drill hole coordinates are set out in a table in the Appendix of this news release.  The collars are also located on the Pinos Altos Local Geology Map.  All intercepts reported for the Reyna de Plata Zone show uncapped and capped gold and silver grades over estimated true widths, based on a preliminary geological interpretation that will be updated as new information becomes available with further drilling.

      Recent exploration drill results from the Reyna de Plata Deposit at the Pinos Altos mine

      Drill Hole

      From
      (metres)

      To
      (metres)

      Depth of
      midpoint
      below
      surface
      (metres)

      Estimated
      true width
      (metres)

      Gold grade
      (g/t)
      (uncapped)

      Gold
      grade (g/t)
      (capped)

      Silver grade
      (g/t)
      (uncapped)

      Silver
      grade (g/t)
      (capped)

      RP18-054

      18.6

      55.0

      48

      31.5

      1.1

      1.1

      36

      36

      RP18-056

      20.0

      31.4

      36

      10.3

      3.1

      1.5

      83

      77

      RP18-058

      0.0

      6.0

      4

      5.6

      1.1

      1.1

      21

      21

        And      

      10.9

      27.7

      25

      15.8

      1.8

      1.8

      76

      76

      RP18-060

      3.0

      15.0

      12

      10.9

      2.2

      2.2

      36

      36

        And 

      19.5

      24.0

      27

      4.1

      1.9

      1.9

      15

      15

      RP18-078

      28.0

      43.9

      50

      14.8

      1.4

      1.2

      24

      24

      RP18-081

      43.9

      69.0

      68

      23.6

      1.7

      1.7

      58

      58

        And

      81.0

      88.5

      100

      7.0

      4.2

      3.3

      39

      39

      RP18-082

      18.8

      31.5

      30

      10.4

      1.6

      1.6

      160

      100

      RP18-083

      19.5

      39.0

      39

      18.3

      1.8

      1.5

      101

      66

      RP18-084

      0.0

      20.0

      14

      18.8

      1.2

      1.2

      45

      45

      RP18-085

      54.9

      63.2

      62

      7.2

      0.9

      0.9

      53

      53

        And

      69.5

      84.0

      84

      12.6

      2.0

      2.0

      27

      27

      RP18-087

      3.6

      20.5

      15

      15.9

      3.3

      1.5

      19

      19

      RP18-089

      33.0

      62.8

      57

      19.1

      1.7

      1.7

      58

      58

      RP18-100

      4.5

      19.3

      18

      12.8

      2.9

      2.8

      33

      33

        and

      52.5

      58.2

      73

      4.7

      2.1

      2.1

      27

      27

      Cut-off value 0.30 g/t gold, maximum 3.0 metres internal dilution

      Holes at the Reyna de Plata zone use a capping factor of 10 g/t gold and 200 g/t silver.

      [Pinos Altos Local Geology Map]

      The Reyna de Plata deposit lies along the Reyna de Plata Fault, as does the Sinter Zone, approximately 1,740 metres to the northwest.  The Reyna de Plata deposit consists of low-sulphidation epithermal vein-style mineralization over a 2.5-kilometre strike length in an east-west direction.  The gold and silver mineralization is accompanied by green-clear-white quartz and calcite in veins, stockwork and breccia.

      Recent drilling has yielded significant shallow intercepts such as hole RP18-100 that intersected 2.8 g/t gold and 33 g/t silver over 12.8 metres at 18 metres depth and 2.1 g/t gold and 27 g/t silver over 4.7 metres at 73 metres depth.  Approximately 370 metres to the southeast, hole RP18-081 intersected 1.7 g/t gold and 58 g/t silver over 23.6 metres at 68 metres depth and 3.3 g/t gold and 39 g/t silver over 7.0 metres at 100 metres depth.  The favourable lengths and grades of intercepts from this program appear to extend the mineralization and confirm mineralization in the central portion of the deposit. These results are expected to increase the mineral resources and allow for the conversion to indicated mineral resources at Reyna de Plata in the year-end mineral resources estimate.

      There is growth potential down-dip from the 2.5-kilometre-long deposit and along an additional 1.5 kilometres of structure immediately to the east of the deposit.

      Creston Mascota – Drilling Extends Madrono Mineralization

      The Creston Mascota heap leach has been operating as a satellite operation to the Pinos Altos mine since late 2010.  In the first six months of 2018, the mine has been preparing to transition operations to the new Bravo pit and expanding the existing heap leach pad facility.

      Creston Mascota Mine - Operating Statistics





      Three Months Ended


      Three Months Ended


      June 30, 2018


      June 30, 2017

      Tonnes of ore processed (thousands of tonnes)

      255


      596

      Tonnes of ore processed per day

      2,802


      6,554

      Gold grade (g/t)

      0.51


      1.17

      Gold production (ounces) 

      8,716


      12,074

      Production costs per tonne (USD)

      $

      40


      $

      12

      Minesite costs per tonne (USD)

      $

      38


      $

      13

      Production costs per ounce of gold produced ($ per ounce): 

      $

      1,173


      $

      610

      Total cash costs per ounce of gold produced ($ per ounce): 

      $

      978


      $

      550

      Production costs per tonne in the second quarter of 2018 increased when compared to the prior-year period due to lower tonnes processed and the timing of unsold inventory, and have also been impacted by longer hauling distances and higher stripping volumes.  Production costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above and lower gold production.

      Minesite costs per tonne in the second quarter of 2018 increased when compared to the prior-year period due to the reasons described above.  Total cash costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to lower gold production and the reasons described above.

      Gold production in the second quarter of 2018 decreased when compared to the prior-year period due to lower tonnes processed and was impacted by delays in accessing the main Bravo pit as a result of slower than expected pre-stripping activities.  These activities are now expected to be completed in August 2018.  In the meantime, lower-grade ore is being sourced from the Calera zone at the Bravo deposit.  The Company expects to return to more normal production levels and gold grades by early in the fourth quarter of 2018.

      Creston Mascota Mine - Operating Statistics





      Six Months Ended


      Six Months Ended


      June 30, 2018


      June 30, 2017

      Tonnes of ore processed (thousands of tonnes)

      730


      1,120

      Tonnes of ore processed per day

      4,033


      6,188

      Gold grade (g/t)

      0.61


      1.16

      Gold production (ounces) 

      20,704


      23,318

      Production costs per tonne (USD)

      $

      27


      $

      13

      Minesite costs per tonne (USD)

      $

      27


      $

      13

      Production costs per ounce of gold produced ($ per ounce): 

      $

      960


      $

      615

      Total cash costs per ounce of gold produced ($ per ounce): 

      $

      839


      $

      538

      Production costs per tonne in the first six months of 2018 increased when compared to the prior-year period due to lower tonnes processed and the timing of unsold inventory, and have also been impacted by longer hauling distances and higher stripping volumes.  Production costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to slightly lower gold production, the strengthening of the Mexican peso relative to the U.S. dollar between periods and the reasons described above.

      Minesite costs per tonne in the first six months of 2018 increased when compared to the prior-year period due to reasons described above.  Total cash costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to lower gold production, the strengthening of the Mexican peso relative to the U.S. dollar between periods and the reasons described above.

      Gold production in the first six months of 2018 decreased when compared to the prior-year period due to lower tonnes processed and delays in accessing the main Bravo pit as a result of slower than expected pre-stripping activities as further described above.

      A new waste rock storage site has been located closer to the Bravo deposit, which is expected to reduce waste haulage costs.  Permits for this new waste dump are expected to be received by the end of 2018.

      The Phase V heap leach pad expansion is proceeding on time and on budget with completion expected at the end of August 2018.

      Drilling Continues to Expand Mineralized Zones at Madrono

      Exploration at the high-grade Madrono Zone, immediately southeast of the Creston Mascota pit, began in early 2016 and, at the end of 2017, a total of 33,045 metres (162 holes) had been drilled on the zone.  The initial indicated mineral resources at the Madrono zone are 56,000 ounces gold and 863,000 ounces silver (858,000 tonnes grading 2.03 g/t gold and 31.3 g/t silver) all at underground depth; the inferred mineral resources are 144,000 ounces gold and 2.6 million ounces silver (1,941,000 tonnes grading 2.31 g/t gold and 41.0 g/t silver), all at underground depth.  The Madrono zone's mineral resources form part of the total Pinos Altos mineral resources estimate as of December 31, 2017.

      Drilling in the second quarter of 2018 totalled 6,005 metres of infill and step-out exploration drilling in 34 holes (a total of 11,078 metres drilling in the first six months of 2018).  The Madrono Zone is a potential satellite mining opportunity to provide mill feed to extend the mine life at Pinos Altos.

      Drilling results for Madrono were last reported in the Company's news release dated April 26, 2018.

      Selected recent drill results from the Madrono Zone are set out in the table below; drill hole collar coordinates are set out in the Appendix of this news release.  The collars are also located on the Pinos Altos Local Geology Map.  All intercepts reported for the Madrono Zone show uncapped and capped gold and silver grades over estimated true widths, based on a preliminary geological interpretation that will be updated as new information becomes available with further drilling.

      Recent exploration drill results from the Madrono Zone at the Creston Mascota mine

      Drill Hole

      From
      (metres)

      To
      (metres)

      Depth of
      midpoint
      below
      surface
      (metres)

      Estimated
      true width
      (metres)

      Gold grade
      (g/t)
      (uncapped)

      Gold grade
      (g/t)
      (capped)

      Silver
      grade (g/t)
      (uncapped)

      Silver
      grade (g/t)
      (capped)

      MAD18-154

      53.0

      57.5

      32

      2.9

      1.7

      1.7

      32

      32

        and

      65.5

      90.0

      42

      15.7

      4.4

      2.5

      62

      62

        and

      94.5

      109.0

      54

      9.3

      3.0

      2.9

      63

      63

      MAD18-159

      67.8

      92.5

      69

      23.8

      1.4

      1.2

      20

      20

      MAD18-161

      72.4

      76.7

      54

      3.9

      3.7

      3.7

      61

      61

        and

      166.8

      171.5

      97

      4.3

      3.0

      3.0

      34

      34

      MAD18-165

      225.0

      232.5

      122

      6.8

      2.2

      2.2

      15

      15

      MAD18-167

      18.6

      29.5

      40

      9.9

      6.6

      4.4

      200

      186

        including

      18.6

      22.7

      35

      3.7

      15.9

      10.0

      227

      197

      MAD18-168

      162.0

      172.5

      175

      9.9

      4.0

      2.2

      19

      19

      MAD18-170

      15.0

      22.5

      23

      7.0

      11.5

      5.9

      8

      8

        including

      16.5

      21.0

      22

      4.2

      17.5

      8.2

      9

      9

      MAD18-185

      36.7

      45.0

      42

      7.2

      2.0

      2.0

      17

      17

        and

      46.2

      60.1

      52

      12.1

      1.1

      1.1

      21

      21

      Cut-off value 0.30 g/t gold, maximum 3.0 metres internal dilution

      Results at the Madrono Zone use a capping factor of 10 g/t gold and 200 g/t silver.

      [Pinos Altos Local Geology Map]

      Recent results at Madrono are encouraging for the potential of open pit deposits in the Madrono, Santa Martha and Madera veins, as well as significant high gold grades supporting a potential underground mining scenario.  Intercepts in this area include hole MAD18-154 that intersected 2.5 g/t gold and 62 g/t silver over 15.7 metres at 42 metres depth and 2.9 g/t gold and 63 g/t silver over 9.3 metres at 54 metres depth.  Two and a half kilometres to the southeast, hole MAD18-167 intersected 4.4 g/t gold and 186 g/t silver over 9.9 metres at 40 metres depth.  Approximately 150 metres to the southeast of hole MAD18-154, hole MAD18-161 intersected 3.7 g/t gold and 61 g/t silver over 3.9 metres at 54 metres depth and 3.0 g/t gold and 34 g/t silver over 4.3 metres at 97 metres depth.  These intercepts confirm the presence of an ore shoot plunging to the southwest with potential to grow at depth and laterally.

      The one-kilometre-long, east-west-striking El Salto vein just south of the Madera vein represents an opportunity to expand mineral resources.  Hole MAD18-170 intersected 5.9 g/t gold and 8 g/t silver over 7.0 metres at 23 metres depth, including 8.2 g/t gold and 9 g/t silver over 4.2 metres at the east end of the El Salto vein.

      The Madrono Zone, including the El Salto vein, continues to be open at depth.  Mineral resources are expected to be updated at the end of this year considering various mining scenarios.

      La India – Drilling Expands Scope of El Realito Satellite Deposit

      The La India mine in Sonora, Mexico, located approximately 70 kilometres northwest of the Company's Pinos Altos mine, achieved commercial production in February 2014.

      La India Mine - Operating Statistics





      Three Months Ended


      Three Months Ended


      June 30, 2018


      June 30, 2017

      Tonnes of ore processed (thousands of tonnes)

      1,556


      1,329

      Tonnes of ore processed per day

      17,099


      14,605

      Gold grade (g/t)

      0.65


      0.65

      Gold production (ounces) 

      24,920


      24,211

      Production costs per tonne (USD)

      $

      11


      $

      11

      Minesite costs per tonne (USD)

      $

      11


      $

      11

      Production costs per ounce of gold produced ($ per ounce): 

      $

      714


      $

      617

      Total cash costs per ounce of gold produced ($ per ounce): 

      $

      691


      $

      552

      Production costs per tonne in the second quarter of 2018 were the same when compared to the prior-year period.  Production costs per ounce in the second quarter of 2018 increased when compared to the prior-year period due to higher consumable costs to facilitate a higher amount of tonnes of ore processed.

      Minesite costs per tonne in the second quarter of 2018 were the same when compared to the prior-year period.  Total cash costs per ounce in the second quarter of 2018 increased when compared to the prior-year period primarily due to lower by-product revenues.

      Gold production in the second quarter of 2018 increased when compared to the prior-year period due to higher tonnes processed.

      La India Mine - Operating Statistics





      Six Months Ended


      Six Months Ended


      June 30, 2018


      June 30, 2017

      Tonnes of ore processed (thousands of tonnes)

      3,251


      2,731

      Tonnes of ore processed per day

      17,961


      15,087

      Gold grade (g/t)

      0.70


      0.69

      Gold production (ounces) 

      47,975


      50,507

      Production costs per tonne (USD)

      $

      10


      $

      10

      Minesite costs per tonne (USD)

      $

      10


      $

      10

      Production costs per ounce of gold produced ($ per ounce): 

      $

      692


      $

      555

      Total cash costs per ounce of gold produced ($ per ounce): 

      $

      680


      $

      493

      Production costs per tonne in the first six months of 2018 were the same when compared to the prior-year period.  Production costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to lower gold production.

      Minesite costs per tonne in the first six months of 2018 were the same when compared to the prior-year period.  Total cash costs per ounce in the first six months of 2018 increased when compared to the prior-year period due to lower gold production and lower by-product revenues.

      Gold production in the first six months of 2018 decreased when compared to the prior-year period due to lower recoveries.

      Optimization work on the La India adsorption, desorption and recovery (ADR) plant continued in the second quarter of 2018.  Civil works have been completed in preparation for a new carbon regeneration kiln, which is expected to arrive at site in August 2018.  Full commissioning of the carbon regeneration kiln is planned for September 2018.

      La India Exploration Focused on El Realito

      Mine-site exploration at the La India property in the second quarter of 2018 included 4,311 metres (31 holes) at El Realito, 2,823 metres (24 holes) at Los Tubos, 1,426 metres (36 holes) at El Cochi and 3,026 metres (28 holes) at the Main Zone, totalling 11,586 metres (119 holes); the total mine-site drilling in the first half of 2018 was 18,419 metres, which form a portion of the budget of 26,000 metres for 2018.  Drilling results for the La India property were last reported in the Company's news release dated April 26, 2018.

      In addition, exploration at the La India property in the second quarter of 2018 included drilling, mapping and surface sampling and metallurgical testing at the Chipriona regional target.  To date, 3,600 metres has been drilled with the aim of better understanding the geometry of the mineralized veins along the Chipriona corridor.

      Nine kilometres northwest of the mine site is the Tarachi deposit where a bulk mineable type of mineralization was previously identified.  Tarachi has indicated mineral resources of 294,000 ounces gold (22.7 million tonnes grading 0.40 g/t gold) and inferred mineral resources of 68,000 ounces gold (6.5 million tonnes grading 0.33 g/t gold) as of December 31, 2017.  The mineral resources at Tarachi are separate from the mineral resources estimate for La India.  A 6,000-metre diamond drill program will commence in the third quarter of 2018, aimed at expanding the mineralized zones and testing new prospective areas within the deposit.

      Selected recent drill results from the La India property are set out in the table below, and drill-hole collar coordinates are set out in a table in the Appendix of this news release.  The collars are located on the La India Area Property and Location Map.  The intercepts reported for the La India property show uncapped and capped gold and silver grades over estimated true widths, based on a preliminary geological interpretation that will be updated as new information becomes available with further drilling.

      Additional drilling is planned in the El Realito, Los Tubos, El Cochi, Main Zone, Chipriona and Tarachi areas over the remainder of 2018.

      Recent exploration drill results from the La India property

      Drill Hole

      Vein

      From
      (metres)

      To
      (metres)

      Depth of
      midpoint
      below
      surface
      (metres)

      Estimated
      true width
      (metres)

      Gold grade
      (g/t)
      (uncapped)

      Gold grade
      (g/t)
      (capped)

      Silver grade
      (g/t)
      (uncapped)

      Silver grade
      (g/t)
      (capped)

      INER18-144

      El Realito

      22.0

      38.0

      16

      10.9

      2.2

      2.2

      12

      12

        including


      24.0

      29.0

      14

      3.7

      4.1

      4.1

      8

      8

        and

      El Realito

      101.2

      110.2

      55

      7.4

      1.3

      1.3

      4

      4

      INER18-146

      El Realito

      5.6

      21.0

      13

      12.2

      1.0

      1.0

      9

      9

      INER18-148

      El Realito

      10.0

      26.7

      11

      13.2

      0.7

      0.7

      5

      5

      INER18-149

      El Realito

      79.0

      90.0

      101

      7.1

      12.8

      7.9

      31

      31

      INER18-155

      El Realito

      53.8

      60.0

      56

      4.9

      1.9

      1.9

      2

      2

        and

      El Realito

      137.0

      143.0

      123

      4.2

      3.2

      3.2

      14

      14

        and

      El Realito

      161.7

      166.5

      136

      3.1

      4.1

      4.1

      4

      4

      INER18-157

      El Realito

      35.3

      76.0

      35

      14.8

      1.1

      1.1

      12

      12

      INER18-158

      El Realito

      107.0

      126.0

      55

      10.6

      0.5

      0.5

      3

      3

        and

      El Realito

      150.0

      167.3

      64

      11.8

      0.8

      0.8

      24

      24

      INER18-160

      El Realito

      0.0

      7.0

      4

      5.2

      1.2

      1.2

      3

      3

        and

      El Realito

      20.0

      32.0

      15

      8.4

      1.5

      1.5

      14

      14

      INER18-174

      El Realito

      82.5

      107.0

      54

      16.1

      0.9

      0.8

      3

      3

      Holes at the La India property, including the El Realito Zone use a capping factor of 10 g/t gold and 200 g/t silver.

      [La India Local Geology Map]

      Encouraging results at El Realito Zone, Open to the Northeast and Southwest

      Exploration drilling is defining and extending the mineralization at the El Realito satellite project, which is approximately 1.5 kilometres east of the North and La India zones, to evaluate the potential to increase mineral resources in close proximity to the existing La India mining operations, with encouraging results.  Initial indicated mineral resources have been declared at El Realito of 112,000 ounces gold and 642,000 ounces silver (5.0 million tonnes grading 0.70 g/t gold and 4.0 g/t silver); inferred mineral resources are 18,000 ounces gold and 97,000 ounces silver (1.4 million tonnes grading 0.40 g/t gold and 2.2 g/t silver).  The mineral resources at El Realito formed part of the total mineral resources estimate for La India as of December 31, 2017.

      The El Realito mineralization is found in northeast-striking subvertical parallel structural corridors of breccia that appear to have acted as conduits, bringing gold and silver mineralization into the favourable subhorizontal volcanic rock layers (the lower porphyritic dacite).

      An infill drill program at El Realito in the first half of 2018 has confirmed the lateral extent of the zone, with high-grade intersections associated with vertical feeders.  Hole INER18-149 intersected 7.9 g/t gold and 31 g/t silver over 7.1 metres at 101 metres depth.  Nearby, hole INER18-155 intersected three mineralized structures: 1.9 g/t gold and 2 g/t silver over 4.9 metres at 56 metres depth, 3.2 g/t gold and 14 g/t silver over 4.2 metres at 123 metres depth and 4.1 g/t gold and 4 g/t silver over 3.1 metres at 136 metres depth.  The gold and silver mineralization is related to hydrothermal breccia structures that strike northeast and dip steeply to the southeast.

      Approximately 350 metres to the north of these two holes, hole INER18-144 intersected 2.2 g/t gold and 12 g/t silver over 10.9 metres at 16 metres depth and 1.3 g/t gold and 4 g/t silver over 7.4 metres at 55 metres depth.  These intervals confirm that the gold-silver mineralization is associated with vertical feeder structures, with metal values and favourable alteration increasing close to the breccia.  Work in the second half of 2018 will focus on step-out and exploration drilling.  El Realito remains open to the northeast and southwest.

      Santa Gertrudis – Drilling Confirms Known Mineralized Areas and Presence of Higher Grade Feeder Zones

      Agnico Eagle acquired its 100% interest in the Santa Gertrudis gold property in November 2017 from GoGold Resources Inc. ("GoGold").  The 42,000-hectare property is located approximately 180 kilometres north of Hermosillo in Sonora, Mexico.

      The property was the site of a historical heap leach operation that produced approximately 565,000 ounces of gold at a grade of 2.1 g/t gold from 1991 to 1994 and includes substantial surface infrastructure already in place, including pre-stripped pits, haul roads, water sources and buildings.

      Three favourable geological trends with a potential strike length of 18 kilometres have been identified on the property with limited drilling between deposits.  In addition, GoGold had previously reported high-grade mineralization along northeast-trending structures.

      Although 2,600 drill holes were completed in the past, this news release represents the initial drill results reported by Agnico Eagle from the Santa Gertrudis project.  Drilling by the Company started at Santa Gertrudis during April 2018 using portable drill rigs with the purpose of confirming and extending the mineral resources estimated by previous owners.  As of the end of the second quarter of 2018, 9,152 metres has been drilled in 54 holes mainly in three zones: Corral, Greta and Cristina.  The 2018 exploration program at the project consists of 28,000 metres at a budget of approximately $7.2 million.

      Gold and silver grades of recent intercepts from the ongoing drilling campaign at Santa Gertrudis are set out in the table below and drill hole coordinates are set out in a table in the Appendix of this news release.  Drill collars are also shown on the Santa Gertrudis project local geology map.  All intercepts reported for the Santa Gertrudis project show uncapped gold and silver grades over estimated true widths, based on a preliminary geological interpretation that will be updated as new information becomes available with further drilling.

      Selected recent exploration drill results from the Santa Gertrudis project

      Drill Hole

      Zone

      From
      (metres)

      To
      (metres)

      Depth of
      midpoint below
      surface
      (metres)

      Estimated
      true width
      (metres)

      Gold grade
      (g/t)
      (uncapped)

      Silver grade
      (g/t)
      (uncapped)

      SGE18-001

      Corral

      52.0

      65.5

      59

      12.7

      2.1

      2

        and

      Corral

      138.2

      152.0

      145

      11.3

      0.4

      1

        and

      Corral

      164.4

      169.0

      167

      3.8

      2.1

      7

      SGE18-002

      Corral

      112.0

      133.5

      88

      21.5

      0.9

      2

      SGE18-005

      Corral

      100.5

      106.3

      93

      5.3

      0.5

      3

        and

      Corral

      138.9

      144.0

      131

      4.8

      2.0

      7

      SGE18-007

      Corral

      65.0

      84.0

      80

      16.5

      0.5

      7

        and

      Corral

      171.6

      174.2

      177

      2.6

      3.7

      3

      SGE18-008

      Corral

      34.6

      51.0

      43

      8.2

      1.3

      20

      SGE18-009

      Corral

      29.0

      45.0

      37

      9.2

      1.3

      20

      SGE18-012

      Greta

      0.0

      10.0

      5

      9.4

      4.7

      18

        and

      Greta

      35.0

      43.0

      39

      7.5

      1.1

      2

        and

      Greta

      69.0

      79.5

      74

      9.9

      5.3

      4

      SGE18-016

      Greta

      59.0

      64.5

      62

      5.5

      2.3

      17

      SGE18-018

      Greta

      31.0

      37.0

      34

      5.9

      0.5

      1

        and

      Greta

      115.0

      119.0

      117

      3.9

      2.4

      6

      SGE18-021

      Greta

      23.0

      30.0

      27

      6.8

      0.4

      15

        and

      Greta

      72.0

      76.5

      74

      4.4

      1.2

      13

      SGE18-027

      Corral

      130.0

      146.3

      138

      13.3

      2.1

      9

      SGE18-028

      Cristina

      0.0

      69.7

      40

      69.7

      1.0

      5

      SGE18-030

      Cristina

      14.0

      57.4

      36

      40.8

      0.9

      8

      SGE18-032

      Corral

      77.0

      88.5

      83

      7.7

      1.5

      15

      * No capping factor was used for these composites. The cut-off grade for these intervals is 0.3 g/t gold.

      [Santa Gertrudis Project Local Geology Map]

      Assay results from the Corral, Greta and Cristina zones have confirmed the existence and consistency of mineralized bodies as well as the continuity of structurally controlled feeders.

      In the Greta Zone at the southeast extent of the district, two different mineralized bodies have been identified so far: Greta and Gloria.  Hole SGE18-012 intersected three mineralized intervals in the Gloria body: 9.4 metres grading 4.7 g/t gold and 18 g/t silver at surface, 7.5 metres grading 1.1 g/t gold and 2 g/t silver at 39 metres depth and 9.9 metres grading 5.3 g/t gold and 4 g/t silver at 74 metres depth.  Approximately 800 metres to the southeast, still in the Greta Zone, hole SGE18-021 intersected 6.8 metres averaging 0.4 g/t gold and 15 g/t silver at 27 metres depth and 4.4 metres grading 1.2 g/t gold and 13 g/t silver at 74 metres depth.

      At the Cristina Zone, which is 7.8 kilometres west of the Greta Zone, hole SGE18-028 intersected 1.0 g/t gold and 5 g/t silver over 69.7 metres starting from surface.  Two hundred and ninety metres to the south-southeast, hole SGE18-030 intersected 40.8 metres grading 0.9 g/t gold and 8 g/t silver at 36 metres depth.  Both holes twinned historic drill holes, and their results correlate well with the historic data.

      The Corral Zone is the central portion of the project, located 4.5 kilometres northwest of the Greta Zone, and has been the focus of most of the Company's drilling to date.  The Corral Zone consists of a series of shallow legacy open pits on a northwest-trending corridor.  Recent drilling has not only confirmed the existence of mineralization but also expanded the limits of orebodies.  Significant recent results include hole SGE18-002 that intersected 21.5 metres grading 0.9 g/t gold and 2 g/t silver at 88 metres depth.  Approximately 1,250 metres to the northwest, hole SGE18-032 intersected 7.7 metres grading 1.5 g/t gold and 15 g/t silver at 83 metres depth, in what the Company believes to be a feeder structure.  Another 1,200 metres to the northwest, hole SGE18-027 intersected 13.3 metres grading 2.1 g/t gold and 9 g/t silver at 138 metres depth.

      An additional 19,000 metres of drilling is planned for the rest of this year.  The Company expects to report its initial mineral resources estimate for Santa Gertrudis in mid-February 2019.

      El Barqueno – 2018 Program Primarily Focused on Testing Satellite Targets and Advancing Conceptual Mining Studies

      Agnico Eagle acquired its 100% interest in the El Barqueno project in November 2014.  The 79,746-hectare property is in the Guachinango gold-silver mining district of Jalisco State in west-central, Mexico, approximately 150 kilometres west of the state capital of Guadalajara.

      In the first half of 2018, a total of 57 diamond drill holes (19,124 metres) were completed, primarily at satellite targets, especially the El Rayo Zone.  This included 19 holes (4,617 metres) on two separate veins at the Tolteca Zone, approximately 11 kilometres east of the Azteca-Zapoteca deposit.

      Approximately 35,000 metres of drilling is expected to be completed in 2018 at the El Barqueno project, with a principal focus on testing new target areas.  Exploration expenditures in 2018 are expected to total approximately $9.7 million.

      About Agnico Eagle

      Agnico Eagle is a senior Canadian gold mining company that has produced precious metals since 1957.  Its eight mines are located in Canada, Finland and Mexico, with exploration and development activities in each of these countries as well as in the United States and Sweden.  The Company and its shareholders have full exposure to gold prices due to its long-standing policy of no forward gold sales.  Agnico Eagle has declared a cash dividend every year since 1983.

      Note Regarding Certain Measures of Performance

      This news release discloses certain measures, including "total cash costs per ounce", "all-in sustaining costs per ounce", "minesite costs per tonne" and "adjusted net income" that are not standardized measures under IFRS.  These data may not be comparable to data reported by other issuers.  For a reconciliation of these measures to the most directly comparable financial information reported in the consolidated financial statements prepared in accordance with IFRS, other than adjusted net income, see "Reconciliation of Non-GAAP Financial Performance Measures" below.

      The total cash costs per ounce of gold produced is reported on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal revenues).  The total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the consolidated statements of income for by-product revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and other adjustments, and then dividing by the number of ounces of gold produced.  The total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as the total cash costs per ounce of gold produced on a by-product basis, except that no adjustment is made for by-product metal revenues.  Accordingly, the calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting, refining and marketing charges associated with the production and sale of by-product metals.  The total cash costs per ounce of gold produced is intended to provide information about the cash-generating capabilities of the Company's mining operations.  Management also uses this measure to monitor the performance of the Company's mining operations.  As market prices for gold are quoted on a per ounce basis, using the total cash costs per ounce of gold produced on a by-product basis measure allows management to assess a mine's cash-generating capabilities at various gold prices.

      All-in sustaining costs per ounce of gold produced on a by-product basis are calculated as the aggregate of total cash costs on a by-product basis, sustaining capital expenditures (including capitalized exploration), general and administrative expenses (including stock options) and reclamation expenses, and then dividing by the number of ounces of gold produced.  The all-in sustaining costs per ounce of gold produced on a co-product basis is calculated in the same manner as the all-in sustaining costs per ounce of gold produced on a by-product basis, except that the total cash costs on a co-product basis are used, meaning no adjustment is made for by-product metal revenues.  All-in sustaining costs per ounce is used to show the full cost of gold production from current operations.  Management is aware that these per ounce measures of performance can be affected by fluctuations in foreign exchange rates and, in the case of total cash costs per ounce of gold produced on a by-product basis, by-product metal prices.  Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne (discussed below) as well as other data prepared in accordance with IFRS.

      Minesite costs per tonne are calculated by adjusting production costs as recorded in the consolidated statements of income for unsold concentrate inventory production costs, and then dividing by tonnes of ore processed.  As the total cash costs per ounce of gold produced can be affected by fluctuations in by‑product metal prices and foreign exchange rates, management believes that minesite costs per tonne provides additional information regarding the performance of mining operations, eliminating the impact of varying production levels.  Management also uses this measure to determine the economic viability of mining blocks.  As each mining block is evaluated based on the net realizable value of each tonne mined, in order to be economically viable the estimated revenue on a per tonne basis must be in excess of the minesite costs per tonne.  Management is aware that this per tonne measure of performance can be impacted by fluctuations in processing levels and compensates for this inherent limitation by using this measure in conjunction with production costs prepared in accordance with IFRS.

      Adjusted net income is calculated by adjusting the basic net income per share as recorded in the consolidated statements of income for foreign currency translation gains and losses, mark-to-market adjustments, non-recurring gains and losses and unrealized gains and losses on financial instruments.  Management uses adjusted net income to evaluate the underlying operating performance of the Company and to assist with the planning and forecasting of future operating results.  Management believes that adjusted net income is a useful measure of performance because foreign currency translation gains and losses, mark-to-market adjustments, non-recurring gains and losses and unrealized gains and losses on financial instruments do not reflect the underlying operating performance of the Company and may not be indicative of future operating results.

      Management also performs sensitivity analyses in order to quantify the effects of fluctuating foreign exchange rates and metal prices.  This news release also contains information as to estimated future total cash costs per ounce, all-in sustaining costs per ounce and minesite costs per tonne.  The estimates are based upon the total cash costs per ounce, all-in sustaining costs per ounce and minesite costs per tonne that the Company expects to incur to mine gold at its mines and projects and, consistent with the reconciliation of these actual costs referred to above, do not include production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined.  It is therefore not practicable to reconcile these forward-looking non-GAAP financial measures to the most comparable IFRS measure.

      Forward-Looking Statements

      The information in this news release has been prepared as at July 25, 2018.  Certain statements contained in this news release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" under the provisions of Canadian provincial securities laws and are referred to herein as "forward-looking statements".  When used in this news release, the words "anticipate", "could", "estimate", "expect", "forecast", "future", "plan", "possible", "potential", "will" and similar expressions are intended to identify forward-looking statements.  Such statements include, without limitation: the Company's forward-looking production guidance, including estimated ore grades, project timelines, drilling results, metal production, life of mine estimates, total cash costs per ounce, all-in sustaining costs per ounce, minesite costs per tonne, other expenses and cash flows; the estimated timing and conclusions of technical reports and other studies and evaluations; the methods by which ore will be extracted or processed; statements concerning the Company's plans to build operations at Meliadine, Amaruq, LaRonde Zone 5 and Akasaba West and the Company's expansion plans at Kittila, including the timing and funding thereof; statements concerning other expansion projects, recovery rates, mill throughput, optimization and projected exploration expenditures, including costs and other estimates upon which such projections are based; statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future mineral reserves, mineral resources, mineral production, optimization efforts and sales; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; statements as to the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs and estimates of the timing of such exploration, development and production or decisions with respect to such exploration, development and production; estimates of mineral reserves and mineral resources; statements regarding the Company's ability to obtain the necessary permits and authorizations in connection with its exploration, development and mining operations and the anticipated timing thereof; statements regarding anticipated future exploration; the anticipated timing of events with respect to the Company's mine sites; and statements regarding the sufficiency of the Company's cash resources and other statements regarding anticipated trends with respect to the Company's operations, exploration and the funding thereof.  Such statements reflect the Company's views as at the date of this news release and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such statements.  Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by Agnico Eagle as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies.  The material factors and assumptions used in the preparation of the forward looking statements contained herein, which may prove to be incorrect, include, but are not limited to, the assumptions set forth herein and in management's discussion and analysis ("MD&A") and the Company's Annual Information Form ("AIF") for the year ended December 31, 2017 filed with Canadian securities regulators and that are included in its Annual Report on Form 40-F for the year ended December 31, 2017 ("Form 40-F") filed with the U.S. Securities and Exchange Commission (the "SEC") as well as: that there are no significant disruptions affecting operations; that production, permitting, development and expansion at each of Agnico Eagle's properties proceeds on a basis consistent with current expectations and plans; that the relevant metal prices, foreign exchange rates and prices for key mining and construction supplies will be consistent with Agnico Eagle's expectations; that Agnico Eagle's current estimates of mineral reserves, mineral resources, mineral grades and metal recovery are accurate; that there are no material delays in the timing for completion of ongoing growth projects; that the Company's current plans to optimize production are successful; and that there are no material variations in the current tax and regulatory environment.  Many factors, known and unknown, could cause the actual results to be materially different from those expressed or implied by such forward looking statements.  Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, project development, capital expenditures and other costs; foreign exchange rate fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; community protests, including by First Nations groups; risks associated with foreign operations; the unfavorable outcome of litigation involving the Partnership; governmental and environmental regulation; the volatility of the Company's stock price; and risks associated with the Company's currency, fuel and by-product metal derivative strategies.  For a more detailed discussion of such risks and other factors that may affect the Company's ability to achieve the expectations set forth in the forward-looking statements contained in this news release, see the AIF and MD&A filed on SEDAR at www.sedar.com and included in the Form 40-F filed on EDGAR at www.sec.gov, as well as the Company's other filings with the Canadian securities regulators and the SEC.  Other than as required by law, the Company does not intend, and does not assume any obligation, to update these forward-looking statements.

      Notes to Investors Regarding the Use of Mineral Resources

      Cautionary Note to Investors Concerning Estimates of Measured and Indicated Mineral Resources

      This news release uses the terms "measured mineral resources" and "indicated mineral resources".  Investors are advised that while those terms are recognized and required by Canadian regulations, the SEC does not recognize them.  Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into mineral reserves.

      Cautionary Note to Investors Concerning Estimates of Inferred Mineral Resources

      This news release also uses the term "inferred mineral resources".  Investors are advised that while this term is recognized and required by Canadian regulations, the SEC does not recognize it.  "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility.  It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.  Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases.  Investors are cautioned not to assume that any part or all of an inferred mineral resource exists, or is economically or legally mineable.

      Scientific and Technical Data

      The scientific and technical information contained in this news release relating to Quebec operations has been approved by Christian Provencher, Eng., Vice-President, Canada; relating to Nunavut operations has been approved by Dominique Girard, Eng., Vice-President, Nunavut Operations; relating to the Finland operations has been approved by Francis Brunet, Eng., Corporate Director Mining; relating to Southern Business operations has been approved by Marc Legault, Eng., Senior Vice President, Operations – U.S.A. & Latin America; and relating to exploration has been approved by Alain Blackburn, Eng., Senior Vice-President, Exploration and Guy Gosselin, Eng. and P.Geo., Vice-President, Exploration, each of whom is a "Qualified Person" for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101").

      The scientific and technical information relating to Agnico Eagle's mineral reserves and mineral resources contained herein (other than the Canadian Malartic mine) has been approved by Daniel Doucet, Eng., Senior Corporate Director, Reserve Development; and relating to mineral reserves and mineral resources at the Canadian Malartic mine contained herein has been approved by Donald Gervais, P.Geo., Director of Technical Services at CMC, each of whom is a "Qualified Person" for the purposes of NI 43-101.

      Cautionary Note to U.S. Investors - The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce.  Agnico Eagle reports mineral reserve and mineral resource estimates in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum Best Practice Guidelines for Exploration and Best Practice Guidelines for Estimation of Mineral Resources and Mineral Reserves, in accordance with NI 43-101.  These standards are similar to those used by the SEC's Industry Guide No. 7, as interpreted by Staff at the SEC ("Guide 7").  However, the definitions in NI 43-101 differ in certain respects from those under Guide 7.  Accordingly, mineral reserve information contained herein may not be comparable to similar information disclosed by U.S. companies.  Under the requirements of the SEC, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made.  A "final" or "bankable" feasibility study is required to meet the requirements to designate mineral reserves under Guide 7.  Agnico Eagle uses certain terms in this news release, such as "measured", "indicated", "inferred" and "resources" that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.

      In prior periods, mineral reserves for all properties were typically estimated using historic three-year average metals prices and foreign exchange rates in accordance with the SEC guidelines.  These guidelines require the use of prices that reflect current economic conditions at the time of mineral reserve determination, which the Staff of the SEC has interpreted to mean historic three-year average prices.  Given the current commodity price environment, Agnico Eagle has decided to use price assumptions that are below the three-year averages.

      Assumptions used for the December 31, 2017 mineral reserves estimate at all mines and advanced projects reported by the Company


      Metal prices

      Exchange rates


      Gold
      (US$/oz)

      Silver
      (US$/oz)

      Copper
      (US$/lb)

      Zinc (US$/lb)

      C$ per
      US$1.00

      Mexican
      peso per
      US$1.00

      US$ per
      €1.00

      Long-life
      operations and
      projects

      $1,150

      $16.00

      $2.50

      $1.00

      C$1.20

      MXP16.00

      US$1.15

      Short-life
      operations – Lapa,
      Meadowbank mine, Santos Nino
      pit and Creston
      Mascota satellite
      operation at Pinos
      Altos

      C$1.25

      MXP17.00

      Not
      applicable

      Upper Canada,
      Upper Beaver*,
      Canadian Malartic
      mine**

      $1,200

      Not
      applicable

      2.75

      Not
      applicable

      C$1.25

      Not
      applicable

      Not
      applicable

      *The Upper Beaver project has a C$125/tonne net smelter return (NSR)

      **The Canadian Malartic mine uses a cut-off grade between 0.35 g/t and 0.37 g/t gold (depending on the deposit)

      NI 43-101 requires mining companies to disclose mineral reserves and mineral resources using the subcategories of "proven mineral reserves", "probable mineral reserves", "measured mineral resources", "indicated mineral resources" and "inferred mineral resources".  Mineral resources that are not mineral reserves do not have demonstrated economic viability.

      A mineral reserve is the economically mineable part of a measured and/or indicated mineral resource.  It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at pre-feasibility or feasibility level as appropriate that include application of modifying factors.  Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified.  The mineral reserves presented in this news release are separate from and not a portion of the mineral resources.

      Modifying factors are considerations used to convert mineral resources to mineral reserves.  These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors.

      A proven mineral reserve is the economically mineable part of a measured mineral resource.  A proven mineral reserve implies a high degree of confidence in the modifying factors.  A probable mineral reserve is the economically mineable part of an indicated and, in some circumstances, a measured mineral resource.  The confidence in the modifying factors applying to a probable mineral reserve is lower than that applying to a proven mineral reserve.

      A mineral resource is a concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction.  The location, quantity, grade or quality, continuity and other geological characteristics of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling.

      A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with confidence sufficient to allow the application of modifying factors to support detailed mine planning and final evaluation of the economic viability of the deposit.  Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation.  An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit.  Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation.  An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling.  Geological evidence is sufficient to imply but not verify geological and grade or quality continuity.

      Investors are cautioned not to assume that part or all of an inferred mineral resource exists, or is economically or legally mineable.

      A feasibility study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of applicable modifying factors, together with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is reasonably justified (economically mineable).  The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project.  The confidence level of the study will be higher than that of a pre-feasibility study.

      Additional Information

      Additional information about each of the mineral projects that is required by NI 43-101, sections 3.2 and 3.3 and paragraphs 3.4(a), (c) and (d) can be found in Technical Reports, which may be found at www.sedar.com.  Other important operating information can be found in the Company's AIF, MD&A and Form 40-F.

      Property/Project name and location

      Date of most recent Technical Report
      (NI 43-101) filed on
      SEDAR

      LaRonde, LaRonde Zone 5 & Ellison, Quebec, Canada

      March 23, 2005

      Canadian Malartic, Quebec, Canada

      June 16, 2014

      Kittila, Kuotko and Kylmakangas, Finland

      March 4, 2010

      Meadowbank Gold Complex including the Amaruq Satellite Mine
      Development, Nunavut, Canada

      February 14, 2018

      Goldex, Quebec, Canada

      October 14, 2012

      Lapa, Quebec, Canada

      June 8, 2006

      Meliadine, Nunavut, Canada

      February 11, 2015

      Hammond Reef, Ontario, Canada

      July 2, 2013

      Upper Beaver (Kirkland Lake property), Ontario, Canada

      November 5, 2012

      Pinos Altos and Creston Mascota, Mexico

      March 25, 2009

      La India, Mexico

      August 31, 2012

      Appendix

      Goldex mine exploration drill collar coordinates of selected holes


      Drill collar coordinates*

      Drill hole ID

      UTM North

      UTM East

      Elevation
      (metres above
      sea level)

      Azimuth
      (degrees)

      Dip
      (degrees)

      Length
      (metres)

      GD120-250

      5330695

      286827

      -897

      002

      -23

      280

      GD120-251

      5330695

      286827

      -897

      002

      -32

      282

      GD120-258

      5330695

      286829

      -897

      020

      -62

      461

      GD120-266

      5330668

      286624

      -908

      024

      -57

      558

      * Coordinate System NAD83, UTM Zone 18M

      Meliadine project exploration drill collar coordinates of selected holes


      Drill collar coordinates*

      Drill hole ID

      UTM North

      UTM East

      Elevation
      (metres above
      sea level)

      Azimuth
      (degrees)

      Dip
      (degrees)

      Length
      (metres)

      M18-2434

      6988906

      538767

      63

      175

      -85

      1,010

      M18-2434W2

      6988837

      538775

      -278

      182

      -69

      705

      M18-2438

      6988864

      539096

      64

      186

      -79

      974

      M18-2441W1

      6988923

      539741

      -214

      158

      -66

      1,086

      * Coordinate System UTM NAD83 Z15

      Kittila mine exploration drill collar coordinates of selected holes


      Drill collar coordinates*

      Drill hole ID

      UTM North

      UTM East

      Elevation
      (metres above
      sea level)

      Azimuth
      (degrees)

      Dip
      (degrees)

      Length
      (metres)

      RIE17-616

      7539500

      2558638

      -697

      089

      -6

      456

      RIE17-618**

      7539500

      2558638

      -698

      090

      -25

      469

      RIE17-620

      7539501

      2558638

      -697

      080

      0

      467

      RIE17-625

      7539601

      2558639

      -711

      090

      -26

      515

      RIE17-701

      7538998

      2558632

      -629

      089

      -65

      771

      RIE18-600

      7539400

      2558637

      -685

      092

      -22

      500

      RIE18-601

      7539400

      2558637

      -685

      093

      -35

      456

      RIE18-604

      7539602

      2558639

      -711

      069

      -35

      222

      RIE18-605

      7539399

      2558636

      -685

      093

      -45

      297

      RIE18-606

      7539400

      2558637

      -685

      077

      -22

      231

      ROD17-700H

      7538498

      2558632

      -557

      090

      -70

      836

      ROD17-700I

      7538498

      2558632

      -557

      090

      -70

      650

      ROU18-600

      7538289

      2558730

      -727

      090

      25

      234

      ROU18-612

      7538288

      2558729

      -727

      107

      25

      222

      ROU18-613

      7538288

      2558729

      -728

      105

      7

      201

      ROU18-615

      7538288

      2558729

      -729

      105

      -22

      280

      * Finnish Coordinate System KKJ Zone 2

      **Hole RIE17-618 was previously reported in Agnico Eagle's February 14, 2018 news release.

      Reyna de Plata Deposit at Pinos Altos mine exploration drill collar coordinates


      Drill collar coordinates*

      Drill Hole ID

      UTM North

      UTM East

      Elevation (metres
      above sea level)

      Azimuth
      (degrees)

      Dip
      (degrees)

      Length
      (metres)

      RP18-054

      3131300

      765681

      2,023

      201

      -45

      99

      RP18-056

      3131290

      765704

      2,024

      202

      -44

      108

      RP18-058

      3131281

      765643

      2,038

      200

      -47

      117

      RP18-060

      3131275

      765670

      2,042

      200

      -45

      114

      RP18-078

      3131395

      765425

      1,999

      200

      -45

      102

      RP18-081

      3131342

      765534

      2,021

      194

      -80

      102

      RP18-082

      3131342

      765534

      2,023

      201

      -46

      72

      RP18-083

      3131323

      765565

      2,025

      201

      -45

      78

      RP18-084

      3131300

      765647

      2,026

      200

      -45

      105

      RP18-085

      3131322

      765706

      2,006

      202

      -44

      114

      RP18-087

      3131274

      765693

      2,042

      202

      -45

      81

      RP18-089

      3131322

      765612

      2,010

      201

      -71

      111

      RP18-100

      3131446

      765177

      2,036

      201

      -45

      60

      *       Coordinate System UTM Nad 27 Zone N12

      Madrono Zone at Creston Mascota mine exploration drill collar coordinates


      Drill collar coordinates*

      Drill Hole ID

      UTM North

      UTM East

      Elevation
      (metres above
      sea level)

      Azimuth
      (degrees)

      Dip
      (degrees)

      Length
      (metres)

      MAD18-154

      3135095

      761496

      2,113

      181

      -60

      126

      MAD18-159

      3134954

      761618

      2,137

      001

      -45

      255

      MAD18-161

      3134979

      761594

      2,141

      002

      -46

      243

      MAD18-165

      3134919

      761571

      2,104

      001

      -45

      291

      MAD18-167

      3134423

      761967

      2,028

      050

      -46

      102

      MAD18-168

      3134871

      761612

      2,089

      001

      -45

      272

      MAD18-170

      3134001

      761985

      2,001

      051

      -46

      162

      MAD18-185

      3134509

      761951

      2,102

      051

      -45

      102

      *  Coordinate System UTM Nad 27 Zone

      La India property exploration drill hole collar coordinates


      Drill Hole Collar Coordinates*

      Drill Hole ID

      UTM North

      UTM East

      Elevation
      (metres
      above sea
      level)

      Azimuth
      (degrees)

      Dip
      (degrees)

      Length
      (metres)

      INER18-144

      3178216

      708826

      2,004

      315

      -50

      156

      INER18-146

      3178397

      708634

      1,868

      135

      -45

      105

      INER18-148

      3178279

      708771

      1,973

      315

      -50

      126

      INER18-149

      3177902

      708854

      1,996

      315

      -45

      147

      INER18-155

      3177871

      708813

      1,990

      315

      -45

      201

      INER18-157

      3178378

      708730

      1,929

      315

      -60

      105

      INER18-158

      3178048

      708713

      2,038

      315

      -45

      188

      INER18-160

      3178276

      708900

      2,031

      315

      -50

      192

      INER18-174

      3178318

      709067

      2,051

      315

      -60

      144

      * Coordinate System UTM NAD27 Mexico 12 Zone

      Santa Gertrudis project exploration drill hole collar coordinates


      Drill Hole Collar Coordinates*

      Drill Hole ID

      UTM North

      UTM East

      Elevation
      (metres
      above sea
      level)

      Azimuth
      (degrees)

      Dip
      (degrees)

      Length
      (metres)

      SGE18-001

      3386618

      546914

      1,447

      060

      90

      249

      SGE18-002

      3386619

      546915

      1,447

      060

      57

      200

      SGE18-005

      3387035

      546548

      1,456

      090

      65

      201

      SGE18-007

      3386440

      54,934

      1,467

      050

      70

      220

      SGE18-008

      3387491

      546075

      1,450

      050

      90

      100

      SGE18-009

      3387504

      546068

      1,450

      050

      85

      102

      SGE18-012

      3385013

      551419

      1,628

      228

      90

      141

      SGE18-016

      3384231

      551027

      1,559

      100

      65

      147

      SGE18-018

      3384382

      551871

      1,711

      090

      70

      165

      SGE18-021

      3384335

      551867

      1,707

      090

      80

      153

      SGE18-027

      3388471

      545288

      1,464

      050

      80

      156

      SGE18-028

      3384404

      544123

      1,314

      060

      60

      126

      SGE18-030

      3384144

      544261

      1,315

      000

      90

      102

      SGE18-032

      3387527

      546020

      1,454

      065

      83

      120

      * Coordinate System UTM WGS84 12N Zone

      AGNICO EAGLE MINES LIMITED
      SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS
      (thousands of United States dollars, except where noted)
      (Unaudited)






      Three Months Ended
      June 30,


      Six Months Ended
      June 30,


      2018


      2017(i)


      2018


      2017(i)









      Operating margin(ii)by mine:








      Northern Business









      LaRonde mine

      $

      74,517


      $

      54,062


      $

      164,277


      $

      124,764


      LaRonde Zone 5 mine

      334


      —


      334


      —


      Lapa mine

      6,303


      8,189


      6,592


      14,394


      Goldex mine

      18,686


      15,990


      36,738


      36,844


      Meadowbank mine

      21,001


      62,668


      51,194


      120,141


      Canadian Malartic mine(iii)

      67,680


      51,237


      129,941


      102,823


      Kittila mine

      15,312


      21,741


      38,621


      51,582

      Southern Business









      Pinos Altos mine

      29,620


      41,138


      66,839


      83,171


      Creston Mascota mine

      3,313


      8,114


      10,949


      16,171


      La India mine

      15,821


      19,103


      30,211


      39,472

      Total operating margin(ii)

      252,587


      282,242


      535,696


      589,362

      Gain on impairment reversal

      —


      —


      —


      —

      Amortization of property, plant and mine development

      138,469


      128,440


      272,839


      260,949

      Exploration, corporate and other

      73,710


      90,122


      153,096


      162,086

      Income before income and mining taxes

      40,408


      63,680


      109,761


      166,327

      Income and mining taxes expense

      35,436


      8,804


      59,859


      35,501

      Net income for the period

      $

      4,972


      $

      54,876


      $

      49,902


      $

      130,826

      Net income per share — basic (US$)

      $

      0.02


      $

      0.24


      $

      0.21


      $

      0.57

      Net income per share — diluted (US$)

      $

      0.02


      $

      0.23


      $

      0.21


      $

      0.57









      Cash flows:








      Cash provided by operating activities

      $

      120,087


      $

      183,950


      $

      327,793


      $

      406,561

      Cash used in investing activities

      $

      (201,405)


      $

      (203,444)


      $

      (556,122)


      $

      (357,131)

      Cash provided by financing activities

      $

      340,498


      $

      169,836


      $

      306,150


      $

      351,407









      Realized prices (US$):








      Gold (per ounce)

      $

      1,293


      $

      1,260


      $

      1,313


      $

      1,241

      Silver (per ounce)

      $

      16.43


      $

      17.03


      $

      16.61


      $

      17.33

      Zinc (per tonne)

      $

      3,144


      $

      2,642


      $

      3,280


      $

      2,721

      Copper (per tonne)

      $

      6,760


      $

      5,660


      $

      7,014


      $

      6,018









      Payable production(iv):








      Gold (ounces):









      Northern Business










      LaRonde mine

      84,526


      72,090


      174,311


      151,002



      LaRonde Zone 5 mine

      4,601


      —


      4,601


      —



      Lapa mine

      14,533


      15,881


      16,255


      31,241



      Goldex mine

      30,480


      30,337


      58,404


      63,008



      Meadowbank mine

      59,627


      95,289


      121,074


      180,659



      Canadian Malartic mine(iii)                                                      

      91,863


      82,509


      175,266


      153,891



      Kittila mine

      42,049


      47,156


      90,167


      98,777


      Southern Business










      Pinos Altos mine

      43,646


      48,196


      85,482


      93,556



      Creston Mascota mine

      8,716


      12,074


      20,704


      23,318



      La India mine

      24,920


      24,211


      47,975


      50,507

      Total gold (ounces)

      404,961


      427,743


      794,239


      845,959









      Silver (thousands of ounces):









      Northern Business










      LaRonde mine

      234


      337


      601


      609



      LaRonde Zone 5 mine

      —


      —


      —


      —



      Lapa mine

      1


      1


      1


      2



      Goldex mine

      1


      1


      1


      1



      Meadowbank mine

      48


      65


      108


      136



      Canadian Malartic mine(iii)

      117


      89


      223


      173



      Kittila mine

      3


      3


      6


      6


      Southern Business










      Pinos Altos mine

      538


      645


      1,079


      1,228



      Creston Mascota mine

      77


      70


      168


      126



      La India mine

      37


      74


      82


      202

      Total silver (thousands of ounces)

      1,056


      1,285


      2,269


      2,483









      Zinc (tonnes)

      2,778


      1,724


      3,824


      2,729

      Copper (tonnes)

      961


      907


      2,253


      2,179









      Payable metal sold:








      Gold (ounces):









      Northern Business









      LaRonde mine 

      94,868


      72,706


      196,693


      158,162


      LaRonde Zone 5 mine 

      683


      —


      683


      —


      Lapa mine 

      13,286


      15,870


      13,899


      31,277


      Goldex mine

      30,531


      30,165


      57,989


      63,377


      Meadowbank mine

      59,126


      92,038


      127,251


      182,593


      Canadian Malartic mine(iii)(v)

      84,920


      77,380


      161,965


      141,240


      Kittila mine

      41,758


      46,210


      91,538


      100,110


      Southern Business









      Pinos Altos mine

      43,653


      47,839


      90,013


      92,972


      Creston Mascota mine

      9,499


      11,414


      21,388


      23,040


      La India mine

      25,362


      26,251


      47,392


      51,931

      Total gold (ounces)

      403,686


      419,873


      808,811


      844,702









      Silver (thousands of ounces):









      Northern Business









      LaRonde mine

      249


      319


      611


      607


      LaRonde Zone 5 mine

      0


      —


      0


      —


      Lapa mine

      1


      6


      1


      6


      Goldex mine

      1


      1


      1


      1


      Meadowbank mine

      51


      73


      109


      136


      Canadian Malartic mine(iii)(v)

      107


      75


      194


      154


      Kittila mine

      2


      3


      6


      5


      Southern Business









      Pinos Altos mine

      528


      586


      1,139


      1,192


      Creston Mascota mine

      81


      70


      167


      120


      La India mine

      41


      86


      88


      215

      Total silver (thousands of ounces):

      1,061


      1,219


      2,316


      2,436









      Zinc (tonnes)

      2,979


      1,645


      5,509


      3,781

      Copper (tonnes)

      945


      885


      2,233


      2,114









      Total cash costs per ounce of gold produced — co-product basis (US$)(vi):





      Northern Business









      LaRonde mine

      $

      622


      $

      686


      $

      631


      $

      673


      LaRonde Zone 5 mine

      796


      —


      796


      —


      Lapa mine

      795


      717


      823


      785


      Goldex mine(vii)

      680


      603


      677


      564


      Meadowbank mine

      933


      572


      936


      586


      Canadian Malartic mine(iii)

      557


      558


      571


      566


      Kittila mine

      946


      803


      912


      733

      Southern Business









      Pinos Altos mine

      812


      594


      785


      594


      Creston Mascota mine

      1,123


      648


      974


      634


      La India mine

      716


      604


      708


      563

      Weighted average total cash costs per ounce of gold produced

      $

      736


      $

      628


      $

      735


      $

      622









      Total cash costs per ounce of gold produced — by-product basis (US$)(vi):





      Northern Business









       LaRonde mine

      $

      395


      $

      482


      $

      412


      $

      473


       LaRonde Zone 5 mine

      796


      —


      796


      —


       Lapa mine

      795


      712


      823


      781


       Goldex mine(vii)

      680


      603


      677


      564


       Meadowbank mine

      920


      559


      921


      573


       Canadian Malartic mine(iii)

      537


      540


      551


      548


       Kittila mine

      945


      802


      911


      732

      Southern Business









       Pinos Altos mine

      608


      373


      574


      366


       Creston Mascota mine

      978


      550


      839


      538


       La India mine

      691


      552


      680


      493

      Weighted average total cash costs per ounce of gold produced

      $

      656


      $

      556


      $

      652


      $

      548


      Notes:


      (i) The Company has adopted IFRS 9 - Financial instruments ("IFRS 9") effective January 1, 2018 on a retrospective basis where appropriate and the comparative adjustments above have been adjusted accordingly. 

      (ii) Operating margin is calculated as revenues from mining operations less production costs.

      (iii) The information set out in this table reflects the Company's 50% interest in the Canadian Malartic mine.

      (iv) Payable production (a non-GAAP non-financial performance measure) is the quantity of mineral produced during a period contained in products that have been or will be sold by the Company, whether such products are sold during the period or held as inventories at the end of the period.

      (v) The Canadian Malartic mine's payable metal sold excludes the 5.0% net smelter royalty in favour of Osisko Gold Royalties Ltd.

      (vi) Total cash costs per ounce of gold produced is not a recognized measure under IFRS and this data may not be comparable to data reported by other gold producers. Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (without deducting by-product metal revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the condensed interim consolidated statements of income  for by-product metal revenues, inventory production costs, smelting, refining and marketing charges, other adjustments, and then dividing by the number of ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except that no adjustment for by-product metal revenues is made. Accordingly, the calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting, refining and marketing charges associated with the production and sale of by-product metals. The Company believes that these generally accepted industry measures provide a realistic indication of operating performance and provide useful comparison points between periods. Total cash costs per ounce of gold produced is intended to provide information about the cash generating capabilities of the Company's mining operations. Management also uses these measures to monitor the performance of the Company's mining operations. As market prices for gold are quoted on a per ounce basis, using the total cash costs per ounce of gold produced on a by-product basis measure allows management to assess a mine's cash generating capabilities at various gold prices. Management is aware that these per ounce measures of performance can be affected by fluctuations in exchange rates and, in the case of total cash costs of gold produced on a by-product basis, by-product metal prices. Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne as well as other data prepared in accordance with IFRS. Management also performs sensitivity analysis in order to quantify the effects of fluctuating metal prices and exchange rates.


      (vi) The Lapa mine's per ounce of gold produced calculations exclude 203 ounces for the three months ended March 31, 2017 of payable gold production as a result of the Lapa mill being placed on temporary maintenance.

      (vii) The Goldex mine's data presented  on a per ounce of gold produced basis for the three and six  months ended June 30, 2017 excludes 5,646 and 8,041 ounces of payable gold production respectively and the associated costs related to the Deep 1 Zone which were produced prior to the achievement of commercial production.

      AGNICO EAGLE MINES LIMITED
      CONSOLIDATED BALANCE SHEETS
      (thousands of United States dollars, except share amounts, IFRS basis)
      (Unaudited)






      As at June 30,
      2018


      As at December 31,
      2017

      ASSETS




      Current assets:





      Cash and cash equivalents

      $

      708,270


      $

      632,978


      Short-term investments

      12,936


      10,919


      Restricted cash

      408


      422


      Trade receivables

      13,479


      12,000


      Inventories

      440,047


      500,976


      Income taxes recoverable

      30,900


      13,598


      Equity securities

      73,221


      122,775


      Fair value of derivative financial instruments

      5,558


      17,240


      Other current assets

      200,898


      150,626

      Total current assets

      1,485,717


      1,461,534

      Non-current assets:





      Restricted cash

      —


      801


      Goodwill

      696,809


      696,809


      Property, plant and mine development

      5,990,183


      5,626,552


      Other assets

      105,978


      79,905

      Total assets

      $

      8,278,687


      $

      7,865,601

      LIABILITIES AND EQUITY




      Current liabilities:





      Accounts payable and accrued liabilities

      $

      324,396


      $

      290,722


      Reclamation provision

      4,728


      10,038


      Interest payable

      16,350


      12,894


      Income taxes payable

      16,716


      16,755


      Finance lease obligations

      2,094


      3,412


      Fair value of derivative financial instruments

      5,508


      —

      Total current liabilities

      369,792


      333,821

      Non-current liabilities:





      Long-term debt

      1,720,873


      1,371,851


      Reclamation provision

      374,756


      345,268


      Deferred income and mining tax liabilities

      833,709


      827,341


      Other liabilities

      47,399


      40,329

      Total liabilities

      3,346,529


      2,918,610

      EQUITY





      Common shares:






      Outstanding — 234,085,916 common shares
      issued, less 824,497 shares held in trust

      5,322,229


      5,288,432


      Stock options

      192,410


      186,754


      Contributed surplus

      37,254


      37,254


      Deficit

      (561,025)


      (595,797)


      Other reserves

      (58,710)


      30,348

      Total equity

      4,932,158


      4,946,991

      Total liabilities and equity

      $            8,278,687


      $

      7,865,601

      AGNICO EAGLE MINES LIMITED
      CONSOLIDATED STATEMENTS OF INCOME
      (thousands of United States dollars, except per share amounts, IFRS basis)
      (Unaudited)






      Three Months Ended


      Six Months Ended


      June 30,


      June 30,


      2018


      2017(i)


      2018


      2017(i)

















      REVENUES








      Revenues from mining operations

      $ 556,282


      $ 549,883


      $ 1,134,717


      $ 1,097,342









      COSTS, EXPENSES AND OTHER INCOME








      Production(ii)

      303,695


      267,641


      599,021


      507,980

      Exploration and corporate development

      38,936


      34,323


      69,159


      59,636

      Amortization of property, plant and mine development

      138,469


      128,440


      272,839


      260,949

      General and administrative

      30,647


      27,754


      64,108


      58,508

      Impairment loss on equity securities

      —


      5,814


      —


      5,814

      Finance costs

      25,293


      17,835


      47,109


      37,541

      Loss (gain) on derivative financial instruments

      4,440


      (2,577)


      3,134


      (6,377)

      Environmental remediation

      26


      (190)


      233


      138

      Foreign currency translation loss

      3,875


      2,647


      390


      3,499

      Other (income) expenses

      (29,507)


      4,516


      (31,037)


      3,327

      Income before income and mining taxes

      40,408


      63,680


      109,761


      166,327

      Income and mining taxes expense

      35,436


      8,804


      59,859


      35,501

      Net income for the period

      $     4,972


      $   54,876


      $      49,902


      $    130,826









      Net income per share - basic

      $       0.02


      $       0.24


      $          0.21


      $          0.57

      Net income per share - diluted

      $       0.02


      $       0.23


      $          0.21


      $          0.57









      Weighted average number of common shares outstanding (in thousands):







      Basic

      232,829


      230,798


      232,660


      228,842

      Diluted

      234,949


      233,531


      234,678


      231,234

      Note:

      (i)In accordance with the adoption of IFRS 9 on January 1, 2018, the Company has restated comparative information where required.

      (ii)Exclusive of amortization, which is shown separately.

      AGNICO EAGLE MINES LIMITED
      CONSOLIDATED STATEMENTS OF CASH FLOWS
      (thousands of United States dollars, IFRS basis)
      (Unaudited)






      Three Months Ended


      Six Months Ended


      June 30,


      June 30,


      2018


      2017(i)


      2018


      2017(i)









      OPERATING ACTIVITIES








      Net income for the period

      $     4,972


      $   54,876


      $   49,902


      $ 130,826

      Add (deduct) items not affecting cash:









      Amortization of property, plant and mine development

      138,469


      128,440


      272,839


      260,949


      Deferred income and mining taxes

      17,888


      (9,741)


      6,266


      (9,210)


      Stock-based compensation

      12,133


      9,530


      27,457


      24,920


      Impairment loss on equity securities

      —


      5,814


      —


      5,814


      Foreign currency translation loss

      3,875


      2,647


      390


      3,499


      Other

      (17,153)


      7,661


      (15,501)


      7,474

      Adjustment for settlement of reclamation provision

      (661)


      (1,989)


      (1,294)


      (2,295)

      Changes in non-cash working capital balances:









      Trade receivables

      255


      1,218


      (1,479)


      (210)


      Income taxes

      (15,010)


      (14,807)


      (17,341)


      (18,610)


      Inventories

      12,768


      (16,725)


      37,318


      (8,789)


      Other current assets

      (57,593)


      (20,676)


      (52,840)


      (15,457)


      Accounts payable and accrued liabilities

      30,258


      52,533


      19,819


      31,374


      Interest payable

      (10,114)


      (14,831)


      2,257


      (3,724)

      Cash provided by operating activities

      120,087


      183,950


      327,793


      406,561









      INVESTING ACTIVITIES








      Additions to property, plant and mine development

      (250,221)


      (192,272)


      (436,315)


      (320,911)

      Acquisition

      —


      —


      (162,479)


      —

      Net proceeds from sale of property, plant and mine development

      35,083


      —


      35,083


      —

      Net (purchases) sales of short-term investments

      (365)


      2,726


      (2,017)


      5

      Net proceeds from sale of equity securities and other investments

      16,305


      6


      16,305


      197

      Purchases of equity securities and other investments

      (3,000)


      (13,888)


      (7,514)


      (36,425)

      Decrease (increase) in restricted cash

      793


      (16)


      815


      3

      Cash used in investing activities

      (201,405)


      (203,444)


      (556,122)


      (357,131)









      FINANCING ACTIVITIES








      Dividends paid

      (19,418)


      (18,769)


      (42,067)


      (38,227)

      Repayment of finance lease obligations

      (825)


      (1,466)


      (1,745)


      (3,148)

      Proceeds from long-term debt

      —


      280,000


      250,000


      280,000

      Repayment of long-term debt

      —


      (410,412)


      (250,000)


      (410,412)

      Notes issuance

      350,000


      300,000


      350,000


      300,000

      Long-term debt financing

      (2,181)


      (2,129)


      (2,285)


      (2,129)

      Repurchase of common shares for stock-based compensation plans

      (76)


      (302)


      (26,332)


      (24,540)

      Proceeds on exercise of stock options

      9,499


      19,969


      21,683


      30,882

      Common shares issued

      3,499


      2,945


      6,896


      218,981

      Cash provided by financing activities

      340,498


      169,836


      306,150


      351,407

      Effect of exchange rate changes on cash and cash equivalents

      (3,168)


      407


      (2,529)


      3,125

      Net increase in cash and cash equivalents during the period

      256,012


      150,749


      75,292


      403,962

      Cash and cash equivalents, beginning of period

      452,258


      793,187


      632,978


      539,974

      Cash and cash equivalents, end of period

      $ 708,270


      $ 943,936


      $ 708,270


      $ 943,936









      SUPPLEMENTAL CASH FLOW INFORMATION








      Interest paid

      $   34,508


      $   31,433


      $   41,675


      $   38,300

      Income and mining taxes paid

      $   34,084


      $   38,792


      $   71,922


      $   69,155

      Note:

      (i)In accordance with the adoption of IFRS 9 on January 1, 2018, the Company has restated comparative information where required.

      AGNICO EAGLE MINES LIMITED
      RECONCILIATION OF NON-GAAP FINANCIAL PERFORMANCE MEASURES
      (thousands of United States dollars, except where noted)
      (Unaudited)












      Three Months Ended June


      Three Months Ended June


      Six Months Ended June


      Six Months Ended June

      Total Production Costs by Mine


      30, 2018


      30, 2017


      30, 2018


      30, 2017

      (thousands of United States dollars)

















      LaRonde mine


      $



      62,908


      $



      46,641


      $



      127,844


      $



      91,006

      LaRonde Zone 5 mine




      521


      —


      521


      —

      Lapa mine


      10,757


      11,762


      11,285


      24,649

      Goldex mine


      20,943


      14,706


      39,527


      31,571

      Meadowbank mine


      56,483


      54,397


      117,973


      108,375

      Canadian Malartic mine(i)


      50,557


      52,752


      97,877


      85,253

      Kittila mine


      38,759


      36,420


      81,475


      72,339

      Pinos Altos mine


      34,743


      28,660


      69,442


      52,392

      Creston Mascota mine


      10,226


      7,361


      19,877


      14,339

      La India mine


      17,798


      14,942


      33,200


      28,056

      Production costs per the consolidated statement of
      income


      $



      303,695


      $



      267,641


      $



      599,021


      $



      507,980


      Reconciliation of Production Costs to Total Cash Costs per Ounce of Gold Produced (ii)by Mine and Reconciliation of Production Costs to Minesite Costs per Tonne(iii)  by Mine 

      (thousands of United States dollars, except as noted)



























      LaRonde Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      84,526




      72,090




      174,311




      151,002


















      Production costs


      $

      62,908


      $

      744


      $

      46,641


      $

      647


      $

      127,844


      $

      733


      $

      91,006


      $

      603


      Inventory and other adjustments(iv)


      (10,336)


      (122)


      2,839


      39


      (17,867)


      (102)


      10,679


      70

      Cash operating costs (co-product basis)


      $

      52,572


      $

      622


      $

      49,480


      $

      686


      $

      109,977


      $

      631


      $

      101,685


      $

      673


      By-product metal revenues


      (19,152)


      (227)


      (14,727)


      (204)


      (38,212)


      (219)


      (30,312)


      (200)

      Cash operating costs (by-product basis)


      $

      33,420


      $

      395


      $

      34,753


      $

      482


      $

      71,765


      $

      412


      $

      71,373


      $

      473


















      LaRonde Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore milled (thousands of tonnes)




      507




      520




      1,038




      1,079


















      Production costs


      $

      62,908


      $

      124


      $

      46,641


      $

      90


      $

      127,844


      $

      123


      $

      91,006


      $

      84

      Production costs (C$)


       C$

      79,891


       C$

      158


       C$

      61,574


       C$

      118


       C$

      162,023


       C$

      156


       C$

      120,798


       C$

      112

      Inventory and other adjustments (C$)(v)


      (19,335)


      (38)


      (3,055)


      (5)


      (37,320)


      (36)


      (1,559)


      (1)

      Minesite operating costs (C$)


       C$

      60,556


       C$

      120


       C$

      58,519


       C$

      113


       C$

      124,703


       C$

      120


       C$

      119,239


       C$

      111


















      LaRonde Zone 5 Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii) (vi)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      4,601




      —




      4,601




      —


















      Production costs


      $

      521


      $

      113


      $

      —


      $

      —


      $

      521


      $

      113


      $

      —


      $

      —


      Inventory and other adjustments(iv)


      3,141


      683


      —


      —


      3,141


      683


      —


      —

      Cash operating costs (co-product basis)


      $

      3,662


      $

      796


      $

      —


      $

      —


      $

      3,662


      $

      796


      $

      —


      $

      —


      By-product metal revenues


      —


      —


      —


      —


      —


      —


      —


      —

      Cash operating costs (by-product basis)


      $

      3,662


      $

      796


      $

      —


      $

      —


      $

      3,662


      $

      796


      $

      —


      $

      —


















      LaRonde Zone 5 Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii) (vi)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore milled (thousands of tonnes)




      56




      —




      56




      —


















      Production costs


      $

      521


      $

      9


      $

      —


      $

      —


      $

      521


      $

      9


      $

      —


      $

      —

      Production costs (C$)


       C$

      681


       C$

      12


       C$

      —


       C$

      —


       C$

      681


       C$

      12


       C$

      —


       C$

      —

      Inventory and other adjustments (C$)(v)


      4,102


      73


      —


      —


      4,102


      73


      —


      —

      Minesite operating costs (C$)


       C$

      4,783


       C$

      85


       C$

      —


       C$

      —


       C$

      4,783


       C$

      85


       C$

      —


       C$

      —


















      Lapa Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      14,533




      15,881




      16,255




      31,241


















      Production costs


      $

      10,757


      $

      740


      $

      11,762


      $

      741


      $

      11,285


      $

      694


      $

      24,649


      $

      789


      Inventory and other adjustments(iv)


      799


      55


      (382)


      (24)


      2,094


      129


      (140)


      (4)

      Cash operating costs (co-product basis)


      $

      11,556


      $

      795


      $

      11,380


      $

      717


      $

      13,379


      $

      823


      $

      24,509


      $

      785


      By-product metal revenues


      (4)


      (0)


      (80)


      (5)


      (9)


      0


      (94)


      (4)

      Cash operating costs (by-product basis)


      $

      11,552


      $

      795


      $

      11,300


      $

      712


      $

      13,370


      $

      823


      $

      24,415


      $

      781


















      Lapa Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore milled (thousands of tonnes)




      109




      134




      126




      264


















      Production costs


      $

      10,757


      $

      99


      $

      11,762


      $

      88


      $

      11,285


      $

      90


      $

      24,649


      $

      93

      Production costs (C$)


       C$ 

      13,720


       C$

      126


       C$

      15,790


       C$

      118


       C$

      14,395


       C$

      114


       C$

      33,049


       C$

      125

      Inventory and other adjustments (C$)(v)


      980


      9


      (537)


      (4)


      2,661


      21


      (476)


      (1)

      Minesite operating costs (C$)


       C$ 

      14,700


       C$

      135


       C$

      15,253


       C$

      114


       C$ 

      17,056


       C$

      135


       C$

      32,573


       C$

      124


















      Goldex Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii)(vii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      30,480




      24,691




      58,404




      54,967


















      Production costs


      $

      20,943


      $

      687


      $

      14,706


      $

      596


      $

      39,527


      $

      677


      $

      31,571


      $

      574


      Inventory and other adjustments(iv)


      (213)


      (7)


      193


      7


      24


      0


      (559)


      (10)

      Cash operating costs (co-product basis)


      $

      20,730


      $

      680


      $

      14,899


      $

      603


      $

      39,551


      $

      677


      $

      31,012


      $

      564


      By-product metal revenues


      (10)


      (0)


      (7)


      (0)


      (14)


      (0)


      (15)


      (0)

      Cash operating costs (by-product basis)


      $

      20,720


      $

      680


      $

      14,892


      $

      603


      $

      39,537


      $

      677


      $

      30,997


      $

      564


















      Goldex Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii)(viii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore milled (thousands of tonnes)




      640




      562




      1,298




      1,146


















      Production costs


      $

      20,943


      $

      33


      $

      14,706


      $

      26


      $

      39,527


      $

      30


      $

      31,571


      $

      28

      Production costs (C$)


       C$

      27,018


       C$

      42


       C$

      19,822


       C$

      35


       C$

      50,555


       C$

      39


       C$

      42,125


       C$

      37

      Inventory and other adjustments (C$)(v)


      (78)


      (0)


      289


      1


      324


      0


      (684)


      (1)

      Minesite operating costs (C$)


       C$

      26,940


       C$

      42


       C$

      20,111


       C$

      36


       C$

      50,879


       C$

      39


       C$

      41,441


       C$

      36


















      Meadowbank Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      59,627




      95,289




      121,074




      180,659


















      Production costs


      $

      56,483


      $

      947


      $

      54,397


      $

      571


      $

      117,973


      $

      974


      $

      108,375


      $

      600


      Inventory and other adjustments(iv)


      (826)


      (14)


      92


      1


      (4,647)


      (38)


      (2,423)


      (14)

      Cash operating costs (co-product basis)


      $

      55,657


      $

      933


      $

      54,489


      $

      572


      $

      113,326


      $

      936


      $

      105,952


      $

      586


      By-product metal revenues


      (826)


      (13)


      (1,258)


      (13)


      (1,800)


      (15)


      (2,365)


      (13)

      Cash operating costs (by-product basis)


      $

      54,831


      $

      920


      $

      53,231


      $

      559


      $

      111,526


      $

      921


      $

      103,587


      $

      573


















      Meadowbank Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore milled (thousands of tonnes)




      844




      996




      1,674




      1,922


















      Production costs


      $

      56,483


      $

      67


      $

      54,397


      $

      55


      $

      117,973


      $

      70


      $

      108,375


      $

      56

      Production costs (C$)


       C$

      72,479


       C$

      86


       C$

      72,521


       C$

      73


       C$

      150,140


       C$

      90


       C$

      143,935


       C$

      75

      Inventory and other adjustments (C$)(v)


      (770)


      (1)


      247


      0


      (5,627)


      (4)


      (2,894)


      (2)

      Minesite operating costs (C$)


       C$

      71,709


       C$

      85


       C$

      72,768


       C$

      73


       C$

      144,513


       C$

      86


       C$

      141,041


       C$

      73


















      Canadian Malartic Mine(i)


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      91,863




      82,509




      175,266




      153,891


















      Production costs


      $

      50,557


      $

      550


      $

      52,752


      $

      639


      $

      97,877


      $

      558


      $

      85,253


      $

      554


      Inventory and other adjustments(iv)


      626


      7


      (6,674)


      (81)


      2,214


      13


      1,889


      12

      Cash operating costs (co-product basis)


      $

      51,183


      $

      557


      $

      46,078


      $

      558


      $

      100,091


      $

      571


      $

      87,142


      $

      566


      By-product metal revenues


      (1,878)


      (20)


      (1,513)


      (18)


      (3,546)


      (20)


      (2,866)


      (18)

      Cash operating costs (by-product basis)


      $

      49,305


      $

      537


      $

      44,565


      $

      540


      $

      96,545


      $

      551


      $

      84,276


      $

      548


















      Canadian Malartic Mine(i)


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore milled (thousands of tonnes)




      2,633




      2,603




      5,143




      5,036


















      Production costs


      $

      50,557


      $

      19


      $

      52,752


      $

      20


      $

      97,877


      $

      19


      $

      85,253


      $

      17

      Production costs (C$)


       C$ 

      64,801


       C$

      25


       C$

      70,868


       C$

      27


       C$

      125,303


       C$

      24


       C$

      113,864


       C$

      23

      Inventory and other adjustments (C$)(v)


      1,036


      0


      (9,261)


      (3)


      3,078


      1


      1,871


      0

      Minesite operating costs (C$)


       C$

      65,837


       C$

      25


       C$

      61,607


       C$

      24


       C$

      128,381


       C$

      25


       C$

      115,735


       C$

      23


















      Kittila Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      42,049




      47,156




      90,167




      98,777


















      Production costs


      $

      38,759


      $

      922


      $

      36,420


      $

      772


      $

      81,475


      $

      904


      $

      72,339


      $

      732


      Inventory and other adjustments(iv)


      1,017


      24


      1,450


      31


      793


      8


      58


      1

      Cash operating costs (co-product basis)


      $

      39,776


      $

      946


      $

      37,870


      $

      803


      $

      82,268


      $

      912


      $

      72,397


      $

      733


      By-product metal revenues


      (39)


      (1)


      (40)


      (1)


      (110)


      (1)


      (84)


      (1)

      Cash operating costs (by-product basis)


      $

      39,737


      $

      945


      $

      37,830


      $

      802


      $

      82,158


      $

      911


      $

      72,313


      $

      732


















      Kittila Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore milled (thousands of tonnes)




      423




      439




      891




      862


















      Production costs


      $

      38,759


      $

      92


      $

      36,420


      $

      83


      $

      81,475


      $

      91


      $

      72,339


      $

      84

      Production costs (€)


      €

      32,853


      €

      78


      €

      32,748


      €

      75


      €

      67,837


      €

      76


      €

      65,852


      €

      76

      Inventory and other adjustments (€)(v)


      911


      2


      1,118


      2


      429


      1


      (222)


      (0)

      Minesite operating costs (€)


      €

      33,764


      €

      80


      €

      33,866


      €

      77


      €

      68,266


      €

      77


      €

      65,630


      €

      76


















      Pinos Altos Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      43,646




      48,196




      85,482




      93,556


















      Production costs


      $

      34,743


      $

      796


      $

      28,660


      $

      595


      $

      69,442


      $

      812


      $

      52,392


      $

      560


      Inventory and other adjustments(iv)


      680


      16


      (8)


      (1)


      (2,307)


      (27)


      3,203


      34

      Cash operating costs (co-product basis)


      $

      35,423


      $

      812


      $

      28,652


      $

      594


      $

      67,135


      $

      785


      $

      55,595


      $

      594


      By-product metal revenues


      (8,885)


      (204)


      (10,663)


      (221)


      (18,050)


      (211)


      (21,358)


      (228)

      Cash operating costs (by-product basis)


      $

      26,538


      $

      608


      $

      17,989


      $

      373


      $

      49,085


      $

      574


      $

      34,237


      $

      366


















      Pinos Altos Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore processed (thousands of tonnes)




      603




      620




      1,122




      1,173


















      Production costs


      $

      34,743


      $

      58


      $

      28,660


      $

      46


      $

      69,442


      $

      62


      $

      52,392


      $

      45

      Inventory and other adjustments(v)


      503


      (0)


      (70)


      (0)


      (2,471)


      (2)


      2,771


      2

      Minesite operating costs


      $

      35,246


      $

      58


      $

      28,590


      $

      46


      $

      66,971


      $

      60


      $

      55,163


      $

      47


















      Creston Mascota Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      8,716




      12,074




      20,704




      23,318


















      Production costs


      $

      10,226


      $

      1,173


      $

      7,361


      $

      610


      $

      19,877


      $

      960


      $

      14,339


      $

      615


      Inventory and other adjustments(iv)


      (434)


      (50)


      466


      38


      283


      14


      435


      19

      Cash operating costs (co-product basis)


      $

      9,792


      $

      1,123


      $

      7,827


      $

      648


      $

      20,160


      $

      974


      $

      14,774


      $

      634


      By-product metal revenues


      (1,271)


      (145)


      (1,186)


      (98)


      (2,797)


      (135)


      (2,230)


      (96)

      Cash operating costs (by-product basis)


      $

      8,521


      $

      978


      $

      6,641


      $

      550


      $

      17,363


      $

      839


      $

      12,544


      $

      538


















      Creston Mascota Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore processed (thousands of tonnes)




      255




      596




      730




      1,120


















      Production costs


      $

      10,226


      $

      40


      $

      7,361


      $

      12


      $

      19,877


      $

      27


      $

      14,339


      $

      13

      Inventory and other adjustments(v)


      (519)


      (2)


      378


      1


      110


      0


      283


      0

      Minesite operating costs


      $

      9,707


      $

      38


      $

      7,739


      $

      13


      $

      19,987


      $

      27


      $

      14,622


      $

      13


















      La India Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Ounce of Gold Produced(ii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )


      (thousands)


      ($ per ounce )

      Gold production (ounces)




      24,920




      24,211




      47,975




      50,507


















      Production costs


      $

      17,798


      $

      714


      $

      14,942


      $

      617


      $

      33,200


      $

      692


      $

      28,056


      $

      555


      Inventory and other adjustments(iv)


      39


      2


      (313)


      (13)


      781


      16


      373


      8

      Cash operating costs (co-product basis)


      $

      17,837


      $

      716


      $

      14,629


      $

      604


      $

      33,981


      $

      708


      $

      28,429


      $

      563


      By-product metal revenues


      (622)


      (25)


      (1,268)


      (52)


      (1,376)


      (28)


      (3,547)


      (70)

      Cash operating costs (by-product basis)


      $

      17,215


      $

      691


      $

      13,361


      $

      552


      $

      32,605


      $

      680


      $

      24,882


      $

      493


















      La India Mine


      Three Months Ended


      Three Months Ended


      Six Months Ended


      Six Months Ended

      Per Tonne(iii)


      June 30, 2018


      June 30, 2017


      June 30, 2018


      June 30, 2017



      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )


      (thousands)


      ($ per tonne )

      Tonnes of ore processed (thousands of tonnes)




      1,556




      1,329




      3,251




      2,731


















      Production costs


      $

      17,798


      $

      11


      $

      14,942


      $

      11


      $

      33,200


      $

      10


      $

      28,056


      $

      10

      Inventory and other adjustments(v)


      (147)


      (0)


      (687)


      0


      313


      0


      (318)


      (0)

      Minesite operating costs


      $

      17,651


      $

      11


      $

      14,255


      $

      11


      $

      33,513


      $

      10


      $

      27,738


      $

      10

      Notes:

      (i) The information set out in this table reflects the Company's 50% interest in the Canadian Malartic mine.

      (ii) Total cash costs per ounce of gold produced is not a recognized measure under IFRS and this data may not be comparable to data reported by other gold producers. Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (without deducting by-product metal revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the condensed interim consolidated statements of income  for by-product metal revenues, inventory production costs, smelting, refining and marketing charges, other adjustments, and then dividing by the number of ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except that no adjustment for by-product metal revenues is made. Accordingly, the calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting, refining and marketing charges associated with the production and sale of by-product metals. The Company believes that these generally accepted industry measures provide a realistic indication of operating performance and provide useful comparison points between periods. Total cash costs per ounce of gold produced is intended to provide information about the cash generating capabilities of the Company's mining operations. Management also uses these measures to monitor the performance of the Company's mining operations. As market prices for gold are quoted on a per ounce basis, using the total cash costs per ounce of gold produced on a by-product basis measure allows management to assess a mine's cash generating capabilities at various gold prices. Management is aware that these per ounce measures of performance can be affected by fluctuations in exchange rates and, in the case of total cash costs of gold produced on a by-product basis, by-product metal prices. Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne as well as other data prepared in accordance with IFRS. Management also performs sensitivity analysis in order to quantify the effects of fluctuating metal prices and exchange rates.

      (iii) Minesite costs per tonne is not a recognized measure under IFRS and this data may not be comparable to data reported by other gold producers. This measure is calculated by adjusting production costs as shown in the consolidated statement of income for inventory production costs and other adjustments, and then dividing by tonnes of ore milled. As the total cash costs per ounce of gold produced measure can be affected by fluctuations in by-product metal prices and exchange rates, management believes that the minesite costs per tonne measure provides additional information regarding the performance of mining operations, eliminating the impact of varying production levels. Management also uses this measure to determine the economic viability of mining blocks. As each mining block is evaluated based on the net realizable value of each tonne mined, in order to be economically viable the estimated revenue on a per tonne basis must be in excess of the minesite costs per tonne. Management is aware that this per tonne measure of performance can be impacted by fluctuations in processing levels and compensates for this inherent limitation by using this measure in conjunction with production costs prepared in accordance with IFRS.

      (iv) Under the Company's revenue recognition policy, revenue from contracts with customers is recognized upon the transfer of control over metals sold to the customer. As total cash costs per ounce of gold produced are calculated on a production basis, an inventory adjustment is made to reflect the portion of production not yet recognized as revenue. Other adjustments include the addition of smelting, refining and marketing charges to production costs.

      (v) This inventory and other adjustment reflects production costs associated with the portion of production still in inventory and smelting, refining and marketing charges associated with production.

      (vi) The LaRonde Zone 5 mine achieved commercial production on June 1, 2018. Therefore, no comparative operating results are presented for the three and six months ended June 30, 2017.

      (vii) The Goldex mine's data presented  on a per ounce of gold produced basis for the three and six  months ended June 30, 2017 excludes 5,646 and 8,041 ounces of payable gold production respectively and the associated costs related to the Deep 1 Zone which were produced prior to the achievement of commercial production.

      (viii) The Goldex mine's data presented on a per tonne basis for the three and six months ended June 30, 2017 excludes 117,784 and 175,514 tonnes processed and the  associated costs related to the Deep 1 Zone which were processed prior to the achievement of commercial production.

      Reconciliation of Production Costs to All-in Sustaining Costs per Ounce of Gold Produced














      (United States dollars per ounce of gold produced, except where noted)


      Three Months Ended June
      30, 2018


      Three Months Ended June
      30, 2017


      Six Months Ended
      June 30, 2018


      Six Months Ended
      June 30, 2017

      Production costs per the consolidated statements of income and
      comprehensive income (thousands of United States dollars)


      $

      303,695


      $

      267,641


      $

      599,021


      $

      507,980

      Adjusted gold production (ounces)(i)



      404,961



      422,097



      794,239



      837,918

      Production costs per ounce of adjusted gold production(i)


      $

      750


      $

      634


      $

      754


      $

      606

      Adjustments:














      Inventory and other adjustments(ii)



      (14)



      (6)



      (19)



      16

      Total cash costs per ounce of gold produced (co-product basis)(iii)


      $

      736


      $

      628


      $

      735


      $

      622

      By-product metal revenues



      (80)



      (72)



      (83)



      (74)

      Total cash costs per ounce of gold produced (by-product basis)(iii)


      $

      656


      $

      556


      $

      652


      $

      548

      Adjustments:













      Sustaining capital expenditures (including capitalized exploration)



      183



      160



      167



      143

      General and administrative expenses (including stock options)



      76



      66



      81



      70

      Non-cash reclamation provision and other



      6



      3



      6



      3

      All-in sustaining costs per ounce of gold produced (by-product basis)


      $

      921


      $

      785


      $

      906


      $

      764

      By-product metal revenues



      80



      72



      83



      74

      All-in sustaining costs per ounce of gold produced (co-product basis)


      $

      1,001


      $

      857


      $

      989


      $

      838

      Notes:

      (i) Adjusted gold production for the three and six months ended June 30, 2017 excludes 5,646 and 8,041 ounces of payable gold production respectively at the Goldex mine's Deep 1 Zone which were produced prior to the achievement of commercial production.

      (ii) Under the Company's revenue recognition policy, revenue from contracts with customers is recognized upon transfer of control over metals sold to the customer. As total cash costs per ounce of gold produced are calculated on a production basis, an inventory adjustment is made to reflect the portion of production not yet recognized as revenue. Other adjustments include the addition of smelting, refining and marketing charges to production costs.

      (iii) Total cash costs per ounce of gold produced is not a recognized measure under IFRS and this data may not be comparable to data reported by other gold producers. Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (without deducting by-product metal revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the condensed interim consolidated statements of income  for by-product metal revenues, inventory production costs, smelting, refining and marketing charges, other adjustments, and then dividing by the number of ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except that no adjustment for by-product metal revenues is made. Accordingly, the calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting, refining and marketing charges associated with the production and sale of by-product metals. The Company believes that these generally accepted industry measures provide a realistic indication of operating performance and provide useful comparison points between periods. Total cash costs per ounce of gold produced is intended to provide information about the cash generating capabilities of the Company's mining operations. Management also uses these measures to monitor the performance of the Company's mining operations. As market prices for gold are quoted on a per ounce basis, using the total cash costs per ounce of gold produced on a by-product basis measure allows management to assess a mine's cash generating capabilities at various gold prices. Management is aware that these per ounce measures of performance can be affected by fluctuations in exchange rates and, in the case of total cash costs of gold produced on a by-product basis, by-product metal prices. Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne as well as other data prepared in accordance with IFRS. Management also performs sensitivity analysis in order to quantify the effects of fluctuating metal prices and exchange rates.

      SOURCE Agnico Eagle Mines Limited

      For further information regarding Agnico Eagle, contact Investor Relations at [email protected] or call (416) 947-1212.

      Modal title

      Organization Profile

      Agnico Eagle Mines Limited

        Also from this source

      • AGNICO EAGLE REPORTS THIRD QUARTER 2026 RESULTS - STRONG FREE CASH FLOW GENERATION DRIVEN BY SOLID OPERATIONAL PERFORMANCE; ON TRACK TO ACHIEVE 2026 PRODUCTION AND COST GUIDANCE

      • AGNICO EAGLE PROVIDES NOTICE OF RELEASE OF THIRD QUARTER 2026 RESULTS AND CONFERENCE CALL

      • AGNICO EAGLE ANNOUNCES DISPOSITION OF DELTA AND HELM BAY PROJECTS AND INVESTMENT IN VIZSLA COPPER

      Contact PR Newswire

      • 866-245-2317
        from 7:30 AM - 6:30 PM ET
      • Become a Client
      • Request a Demo
      • Editorial Bureaus
      • Partnerships
      • General Enquiries
      • Media

      Products

      • Explore Our Platform
      • Plan Campaigns
      • Create with AI
      • Distribute Press Releases
      • Report Results
      • Amplify Content
      • Investor Relations

      About

      • About PR Newswire
      • About Cision
      • Careers
      • APAC
      • APAC - Simplified Chinese
      • APAC - Traditional Chinese
      • Brazil
      • Canada
      • Czech
      • Denmark
      • Finland
      • France
      • Germany
      • India
      • Indonesia
      • Israel
      • Japan
      • Korea
      • Mexico
      • Middle East
      • Middle East - Arabic
      • Netherlands
      • Norway
      • Poland
      • Portugal
      • Russia
      • Slovakia
      • Spain
      • Sweden
      • United States
      • Vietnam

      My Services

      • All News Releases
      • Platform Login
      • Privacy Policy

      Do not sell or share my personal information:

      • Submit via [email protected] 
      • Call Privacy toll-free: 877-297-8921

      Contact Cision

      Products

      About

      My Services
      • All News Releases
      • Platform
      • Next Gen Communications Cloud
      • Cision Communications Cloud
      • my CNW
      877-269-7890
      from 8 AM - 10 PM ET
      • Terms of Use
      • Information Security Policy
      • Site Map
      • Cookie Settings
      • Accessibility Statement
      Copyright © 2026 CNW Group Ltd. All Rights Reserved. A Cision company.