You just read:

Adventus and Salazar announce additional 2018 drill results at the Curipamba project, including 3.71 metres of 3.00% copper, 36.55 g/t gold, 32.17% zinc, 411.3 g/t silver and 6.80% lead

News provided by

Adventus Zinc Corporation

Aug 20, 2018, 07:30 ET