Marban Gold Mine Project - Public notice - Public Consultation Period on the Draft Guidelines
FrançaisOTTAWA, ON, Nov. 19, 2026 /CNW/ --
What is happening?
The Impact Assessment Agency of Canada (IAAC) is conducting an impact assessment for the Marban Gold Mine Project, a new open-pit gold mine located in the Dubuisson Sector, approximately 15 kilometres northwest of Val-d'Or, Quebec.
As part of the Planning stage of the impact assessment process, IAAC is inviting Indigenous Peoples and the public to review the draft Tailored Information and Studies Guidelines (the draft guidelines) and provide comments on this document.
The draft guidelines outline the elements of the natural and human environments that will serve as the focal points of the impact assessment. These guidelines provide the proponent, Agnico Eagle Mines Limited, with the requirements for the studies and information to include in the impact statement.
How can I participate?
Comments can be submitted online by visiting the project home page on the Canadian Impact Assessment Registry (reference number 84117). The draft guidelines are also available on the Registry website. Participants who wish to provide input in a different format can contact IAAC by writing to [email protected].
Submit your comments online by December 9, 2026, at 11:59 p.m. All comments received will be published online as part of the project file.
Stay updated by following IAAC on X: @IAAC_AEIC, Facebook: Environment and Natural Resources in Canada, LinkedIn: Impact Assessment Agency of Canada or YouTube: @IAAC_AEIC.
What is the proposed project?
Agnico Eagle Mines Limited is proposing the construction, operation, decommissioning and restoration of a new open-pit gold mine located in the Dubuisson Sector of Val-d'Or, in Quebec. As proposed, the Marban Gold Mine Project would involve the operation of an open pit, waste rock and overburden stockpiles, and management and mine water treatment infrastructure. The project would also include the construction of an approximately 12-kilometre road to transport ore to the Canadian Malartic mine complex. No ore processing or tailings storage facilities would be built on the Marban site. The project would have a maximum ore production capacity of 23,300 tonnes per day and a 9-year life span.
SOURCE Impact Assessment Agency of Canada

For media inquiries, contact IAAC's media relations team by writing to [email protected].
Partager cet article