Volta Reports More Positive Results in Next Section of Drilling at its Kiaka
Gold Project Including 72m @ 1.12g/t Gold and 60.2m @ 1.17g/t Gold
- hanging wall zone intersect of 28m @ 1.19g/t Au -
TSX: VTR
TORONTO, April 19 /CNW/ - Volta Resources Inc. ("Volta" or the "Company") (TSX: VTR) announces the drill results from the next completed section at its Kiaka Gold Project, located approximately 120 kilometres southeast of Ouagadougou, the capital city of Burkina Faso. To date, 91 holes (~14,315 meters) have been completed of a program comprising more than 150 holes (greater than 22,000 meters). So far results have been received for 67 holes, with this news release covering the latest 3 holes, which are all located on Section 5550N. Randgold holes KDH21, KDH04, KRC06 and KRC07 are also located on this section. The highlights from this section include:
- KRD53 : 60.20m @ 1.17g/t Au, including 11m @ 2.91g/t Au AND - KRD53 : 72.00m @ 1.12g/t Au, including 5m @ 4.76g/t Au and 27m @ 1.55g/t Au - KRD54 : 31.00m @ 1.28g/t Au AND - KRD54 : 73.00m @ 0.80g/t Au, including 14m @ 1.89g/t Au - KKRC31 : 22.00m @ 0.60g/t Au, including 7m @ 1.84/t Au - KDH21* : 11.00m @ 2.34g/t Au AND - KDH21* : 28.00m @ 1.19g/t Au - KDH04* : 167.00m @ 0.80g/t Au, including 12m @ 1.42g/t Au and 23m @ 1.20g/t Au - KRC06* : 130.00m @ 0.87g/t Au, including 6m @ 2.26g/t Au and 14m @ 1.64g/t Au AND - KRC06* : 9.00m @ 2.68g/t Au - KRC07* : 63.00m @ 0.63g/t Au, including 6m @ 1.28g/t Au and 6m @ 1.03g/t Au * Previously drilled by Randgold
Kevin Bullock, Volta's CEO, said, "We continue to be impressed by the substantial widths and grades consistently encountered in the main zone (KMZ). The additional drilling on section 5550N clearly shows that the intersections encountered in Randgold's KDH21 are indeed associated with the parallel hanging wall zones (KHZ). Results from the KHZ demonstrate the additional mineralized potential outside of the main zone."
In order to appreciate the extent and geometry of the mineralization on the 5550N section, the results for the intersections for the three Volta holes and four of Randgold's holes are highlighted in Table 1 below and on the section in Figure 2. Analyses of the Volta samples were undertaken by fire assay on a 50g charge at ALS Chemex Laboratories in Ouagadougou. Volta's sampling and assay procedures included QA/QC elements that employed the inclusion of certified standards and blanks.
Table 1: Highlights of gold intersections from Section 5550N ------------------------------------------------------------------------- Hole ID From To Interval Grade Comment m m m g/t Au ------------------------------------------------------------------------- KKRC31 6.00 28.00 22.00 0.60 Volta ------------------------------------------------------------------------- Including 10.00 18.00 8.00 1.11 ------------------------------------------------------------------------- AND 56.00 63.00 7.00 1.84 ------------------------------------------------------------------------- AND 80.00 85.00 5.00 0.50 Stopped in mineralisation ------------------------------------------------------------------------- KRD53 45.00 64.00 19.00 0.96 Volta ------------------------------------------------------------------------- Including 50.00 64.00 14.00 1.03 ------------------------------------------------------------------------- AND 75.00 85.00 10.00 1.46 ------------------------------------------------------------------------- AND 91.00 151.20 60.20 1.17 ------------------------------------------------------------------------- Including 92.00 97.00 5.00 2.06 ------------------------------------------------------------------------- Including 100.00 111.00 11.00 2.91 ------------------------------------------------------------------------- Including 121.00 128.00 7.00 1.16 ------------------------------------------------------------------------- Including 134.00 138.15 4.15 1.00 ------------------------------------------------------------------------- AND 159.00 231.00 72.00 1.12 ------------------------------------------------------------------------- Including 164.00 169.00 5.00 4.76 ------------------------------------------------------------------------- Including 187.00 214.00 27.00 1.55 ------------------------------------------------------------------------- AND 270.00 275.13 5.13 0.61 Stopped in mineralisation ------------------------------------------------------------------------- KRD54 0.00 31.00 31.00 1.28 Volta ------------------------------------------------------------------------- Including 2.00 31.00 29.00 1.35 ------------------------------------------------------------------------- AND 45.00 118.00 73.00 0.80 ------------------------------------------------------------------------- Including 46.00 60.00 14.00 1.89 ------------------------------------------------------------------------- Including 67.00 74.00 7.00 1.53 ------------------------------------------------------------------------- Including 80.00 87.18 7.18 0.92 ------------------------------------------------------------------------- Including 94.00 98.00 4.00 1.07 ------------------------------------------------------------------------- AND 125.00 145.00 20.00 0.51 ------------------------------------------------------------------------- KDH04 64.00 85.00 21.00 0.62 Randgold ------------------------------------------------------------------------- AND 115.00 282.00 167.00 0.80 ------------------------------------------------------------------------- Including 152.00 166.00 14.00 1.14 ------------------------------------------------------------------------- Including 169.00 178.00 9.00 0.90 ------------------------------------------------------------------------- Including 190.00 195.00 5.00 1.65 ------------------------------------------------------------------------- Including 198.00 202.00 4.00 1.74 ------------------------------------------------------------------------- Including 207.00 230.00 23.00 1.20 ------------------------------------------------------------------------- Including 249.00 254.00 5.00 1.14 ------------------------------------------------------------------------- Including 268.00 280.00 12.00 1.08 ------------------------------------------------------------------------- KDH21 100.00 111.00 11.00 2.34 Randgold ------------------------------------------------------------------------- AND 118.00 134.00 16.00 0.97 ------------------------------------------------------------------------- Including 121.00 128.00 7.00 1.70 ------------------------------------------------------------------------- AND 149.00 177.00 28.00 1.19 ------------------------------------------------------------------------- KRC06 18.00 148.00 130.00 0.87 Randgold ------------------------------------------------------------------------- Including 47.00 63.00 16.00 1.15 ------------------------------------------------------------------------- Including 70.00 74.00 4.00 1.68 ------------------------------------------------------------------------- Including 80.00 86.00 6.00 2.26 ------------------------------------------------------------------------- Including 91.00 104.00 13.00 0.95 ------------------------------------------------------------------------- Including 110.00 117.00 7.00 1.42 ------------------------------------------------------------------------- Including 129.00 143.00 14.00 1.64 ------------------------------------------------------------------------- AND 155.00 164.00 9.00 2.68 ------------------------------------------------------------------------- KRC07 1.00 64.00 63.00 0.63 Randgold ------------------------------------------------------------------------- Including 26.00 32.00 6.00 1.03 ------------------------------------------------------------------------- Including 46.00 52.00 6.00 1.28 ------------------------------------------------------------------------- Including 55.00 58.00 3.00 1.42 ------------------------------------------------------------------------- NOTES: 1) Intervals are core length. True width is unknown at this time. 2) Intersections are based on a 0.3 g/t gold cut-off with maximum internal dilution of 5m for the lower grade mineralization envelope. (increased to 6m for KRD53 and KRD54). 3) In order to highlight the continuity of the high grade zone, a 0.8 g/t gold cut-off with maximum internal dilution of 2m has been used. No top cut has been applied. 4) The intersections listed in the table represent sections of at least 3m in excess of 1g/t Au and/or sections of at least 10m in excess of 0.5g/t Au. (except for KKRC31 and KRD53 where the holes end in mineralization and, so, the last mineralized intervals are less than 10m @ 0.50g/t Au) 5) The intersections also represent sections drilled by reverse circulation (RC) and/or cored drilling (see Table 2). 6) The RC portions of the drill holes were sampled at 1-m intervals. Dry samples were riffle-split to provide 2 kg samples sent to the laboratory. Wet samples were dried in the field, then riffle-split in the same way. The cored portion of the drill holes were sampled at one metre intervals and cut in half using a diamond saw. Half-core is archived at the core storage facility on site while the other half was sent to the laboratory. 7) Samples were sent to ALS Chemex in Ouagadougou for standard preparation followed by Fire Assay on a 50g charge. 8) Certified standards were inserted every 15 samples, field duplicates (in the RC portions) about every 20 and blanks about every 30 samples. The blanks, certified standards and duplicate assays confirm that all assays used to compile the intersections quoted here have passed Volta's rigorous QA/QC checks. 9) The assay results of the holes KDH21, KDH04, KRC06 and KRC07 are assays produced by Randgold. Randgold sampling and assay procedures included QA/QC elements that employed the inclusion of certified standards and blanks. Volta is currently repeating these assays.
Volta's current drill program will test 1,200m strike of the 2,800m long KMZ zone in the Central Area. The program will infill and extend drilling on the Central Area such that the KMZ zone is drilled to 50m x 50m spacing from surface to 150m and 100m x 50m from 150m to 200m depth.
The drill program has been optimized with input from SRK Consulting (UK) to ensure that the delivery of the independent resource consultant's NI 43-101 compliant resource is delivered before the end of June 2010.
TABLE 2: Borehole collar coordinates and orientation parameters ------------------------------------------------------------------------- Hole Section Easting Northing Azi- ID Eleva- Total Dip muth RC DD tion depth (deg- (deg- (m) (m) (m) (m) rees) rees) ------------------------------------------------------------------------- KKRC31 5550N 739564 1289483 266.39 85 -55 135 85 0 ------------------------------------------------------------------------- KRD53 5550N 739564 1289485 266.29 275.13 -55 315 72 103.13 ------------------------------------------------------------------------- KRD54 5550N 739529 1289519 267.51 155.14 -55 135 67 88.14 ------------------------------------------------------------------------- RANDGOLD HOLES ------------------------------------------------------------------------- KDH04 5550N 739392 1289633 268.1 283 -45 130 0 283 ------------------------------------------------------------------------- KRC06 5550N 739458 1289580 267.51 166 -45 130 166 0 ------------------------------------------------------------------------- KDH21 5550N 739285 1289743 272.58 252.5 -45 130 252.5 ------------------------------------------------------------------------- KRC07 5550N 739451 1289512 266.35 73.0 -45 130 73.0 0 -------------------------------------------------------------------------
Under the guidelines of National Instrument 43-101, the qualified person for the Kiaka Gold Project is Mr. Guy Franceschi, Vice President, Exploration for Volta. Mr. Franceschi is a member of the European Federation of Geologists and has reviewed and approved the contents of this news release.
Volta is a mineral exploration company primarily focused on becoming a leader in the identification, acquisition and exploration of gold properties in West Africa. The Company is currently fast-tracking its flagship Kiaka Gold Project, located in Burkina Faso, towards a development decision.
Forward Looking Information Caution:
This press release presents "forward-looking statements" within the meaning of Canadian securities legislation that involve inherent risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the future price of gold and other minerals and metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the capital expenditures, costs and timing of the resources, the realization of mineral reserve estimates, the capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Volta to be materially different from those expressed or implied by such forward looking statements, including but not limited to: risks related to international operations, risks related to the integration of acquisitions; risks related to joint venture operations; actual results of current exploration activities; actual results of current or future reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold and other minerals and metals; possible variations in ore reserves, grade or recovery rates; failure of equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; and delays in obtaining governmental approvals or financing or in the completion of development or construction activities. Although the management and officers of Volta believe that the expectations reflected in such forward-looking statements are based upon reasonable assumptions and have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Volta Resources does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.
To view Figure 1 and Figure 2 please visit http://files.newswire.ca/407/figures.pdf
%SEDAR: 00026749E
For further information: please refer to our website www.voltaresources.com or contact Kevin Bullock, P.Eng., President & CEO, Tel: (647) 388-1842, Fax: (416) 867-2298, Email: [email protected]
Share this article