Toronto Hydro at Work: Antrim Cres.and Dundalk Dr.

TORONTO, Sept. 19, 2012 /CNW/ - Toronto Hydro trucks and equipment occupy the sidewalk to replace a number of cables that have failed and caused numerous outages in the past year. Due to systemic failures, the cable needs to be replaced altogether. Approximately 40 per cent of outages on Toronto Hydro's grid are caused by equipment past its normal life span.

Image with caption: "Toronto Hydro trucks and equipment occupy the sidewalk to replace a number of cables that have failed and caused numerous outages in the past year. Due to systemic failures, the cable needs to be replaced altogether. Approximately 40 per cent of outages on Toronto Hydro's grid are caused by equipment past its normal life span. (CNW Group/Toronto Hydro Corporation)". Image available at: http://photos.newswire.ca/images/download/20120919_C7839_PHOTO_EN_18133.jpg

SOURCE: Toronto Hydro Corporation


Custom Packages

Browse our custom packages or build your own to meet your unique communications needs.

Start today.

CNW Membership

Fill out a CNW membership form or contact us at 1 (877) 269-7890

Learn about CNW services

Request more information about CNW products and services or call us at 1 (877) 269-7890