CGA Mining Limited - Record Production In March

/NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR RELEASE TO US NEWS WIRE SERVICES/

ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE AND TORONTO STOCK EXCHANGE

PERTH, Western Australia, April 6 /CNW/ - CGA Mining Limited (ASX: CGX, TSX: CGA) ("CGA" or the "Company") is pleased to announce another month of record production at the Masbate Gold Project. Production for the month of March was 16,594 ounces up 18% on the previous highest month of October 2009 in which 14,061 ounces were produced.

    
                                               March 2010      October 2009

    Throughput                 t                 413,318           389,722
    Head grade               g/t                    1.47               1.3
    Recovery                   %                   85.02              86.2
    Availability               %                   92.62              96.2
    Gold produced            ozs                  16,594            14,061
    

ABOUT CGA MINING LIMITED

CGA is listed on the Toronto Stock Exchange and Australian Securities Exchange. The Masbate Gold Project in the Philippines was successfully developed with first gold poured on 12 May 2009. The project which is currently ramping up to full production has a total indicated resource base of 4.55M ounces, total inferred resource base of 3.22M ounces and a probable reserve of 3.03M ounces of gold. It is currently forecast to produce over 200,000 ounces per annum.

The 4Mt per annum plant was constructed by Leighton Contractors Asia Limited ("Leighton") without one lost time injury. The mining contract for the project has also been awarded to Leighton, the largest mining contractor in the world. CGA is completing a detailed study for the expansion of the plant throughput at Masbate to 6.5 Mtpa.

CGA has a disciplined acquisition program focused on acquiring new gold projects with a substantial initial resource with the capacity to grow materially and where the development and operational experience of CGA can be applied to enhance shareholder value.

NATIONAL INSTRUMENT 43-101 AND JORC COMPLIANCE

Mr Geoff.G.Jones, F.Aus.I.M.M.CP Mng, CGA's Consulting Engineer, is acting as the Qualified Person in compliance with NI 43-101 and JORC reporting requirements with respect to this announcement. He has prepared and or supervised the preparation of the scientific or technical information in this announcement and confirms compliance with NI43-101 and JORC requirements.

Further information relating to the Masbate Project is included in the technical report entitled Technical Report on the Mineral Resources of the Masbate Deposit, Masbate Province, Republic of the Philippines for CGA Mining Limited prepared by Mining Associates Pty Ltd and available on SEDAR at www.sedar.com, lodged 8 July 2008.

Andrew James Vigar of Mining Associates Pty Ltd, a qualified person, has verified the resource statement for the Masbate Project as disclosed in this announcement, including sampling, analytical and test data underlying the estimate. Verification of the data included numerous site visits, database validation of historical drill results and review of sampling and assaying protocols. The qualified person was satisfied with the verification process.

A NI 43-101 compliant report has been lodged on www.sedar.com verifying and supporting the reserve statement made for the Masbate Project. Mr Daniel Tuffin of Lower Quartile Solution Pty Ltd, a qualified person, has verified the reserve statement for the Masbate Project as disclosed in this announcement, including sampling, analytical and test data underlying the estimate. Verification of the data included database validation of historical drill results and review of sampling and assaying protocols. The qualified person was satisfied with the verification process.

A NI 43-101 compliant report was lodged on www.sedar.com on 3 December 2009 announcing a maiden resource estimate for CGA's Segilola Gold Project in Nigeria. Mr Alfred John Gillman of Odessa Resources Pty Ltd, an independent qualified person experienced in the style of mineralisation at Segilola, completed the resource statement for the Segilola Gold Project including verification of the sampling, analytical and test data underlying the estimate. Verification also included a site visit, database validation of historical drill results and a review of sampling and assaying protocols. The qualified person was satisfied with all of the protocols used during the drilling, sampling and in the Segilola Gold Project resource estimate compilation and computation.

CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS

This announcement includes certain "forward-looking statements" within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements and milestones related to the Masbate Gold Project and other projects, production estimates and CGA's future operating or financial performance, are forward-looking statements. Forward-looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from CGA's expectations include uncertainties related to fluctuations in gold and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for cooperation of government agencies in the development of CGA's mineral projects; the possibility of delay in development programs or in construction projects and uncertainty of meeting anticipated program milestones for CGA's mineral projects; and other risks and uncertainties disclosed under the heading "Risk Factors" in CGA's Annual Information Form for the year ended 30 June 2009 filed with the Canadian securities regulatory authorities on the SEDAR website at www.sedar.com.

SOURCE CGA Mining Limited

For further information: For further information: ENQUIRIES: Australian Contact: President & CEO - Michael Carrick, Tel: +61 8 9263 4000, Fax: +61 8 9263 4020, Email: mcarrick@cgamining.com; US Contact: Independent Chairman - Mark Savage, Tel: (505) 344-2822, Fax: (505) 344-2922, Email: marksavage@comcast.net

Organization Profile

CGA Mining Limited

More on this organization


Custom Packages

Browse our custom packages or build your own to meet your unique communications needs.

Start today.

CNW Membership

Fill out a CNW membership form or contact us at 1 (877) 269-7890

Learn about CNW services

Request more information about CNW products and services or call us at 1 (877) 269-7890