Toronto Hydro Corporation - Works at Toronto's Union Station

TORONTO, Feb. 9, 2012 /CNW/ - A 30 year-old transformer is prepped for replacement in front of Union Station.  A Toronto Hydro crew including, Tim O'Sullivan (right), installed a much needed new transformer powering part of the downtown core. This project is part of Toronto Hydro's long-term plan to replace the 29% of its assets that are past their useful life.

Image with caption: "A 30 year-old transformer is prepped for replacement in front of Union Station. A Toronto Hydro crew including, Tim O'Sullivan (right), installed a much needed new transformer powering part of the downtown core. This project is part of Toronto Hydro's long-term plan to replace the 29% of its assets that are past their useful life. (CNW Group/Toronto Hydro Corporation)". Image available at: http://photos.newswire.ca/images/download/20120209_C3021_PHOTO_EN_9978.jpg

SOURCE Toronto Hydro Corporation


FORFAITS PERSONNALISÉS

Jetez un coup d’œil sur nos forfaits personnalisés ou créez le vôtre selon vos besoins de communication particuliers.

Commencez dès aujourd'hui .

ADHÉSION À CNW

Remplissez un formulaire d'adhésion à CNW ou communiquez avec nous au 1-877-269-7890.

RENSEIGNEZ-VOUS SUR LES SERVICES DE CNW

Demandez plus d'informations sur les produits et services de CNW ou communiquez avec nous au 1‑877-269-7890.