Supreme Resources Ltd. - News release



    Trading Symbol: SPR - TSXV

    COQUITLAM, BC, May 28 /CNW/ - The Company is pleased to report that a
Titan 24 IP Program has commenced on the "TAS" Copper/Gold/Silver Claims
located in the Similkameen Mining Division, British Columbia. The IP Program
will also extend to the recently staked "TAS South Extension Claims".
    The claims cover an area of approximately 1,306 hectares (3,227 acres)
and 3,125 hectares (7,800 acres) respectively. The Titan 24 Deep Imaging
Survey is being conducted by Quantec Geoscience, LTD with headquarters in
Toronto, Ontario. Over the past twenty years, Quantec Geoscience has completed
in excess of 3,000 geophysical projects worldwide including over 400 Titan 24
surveys.
    The Titan 24 DCIP and MT is a multi-parameter distributed ground
geophysical survey system designed to collect large volumes of highly accurate
subsurface physical property information to depths of 750 meters (2,400 feet)
with IP chargeability and DC resistivity. The Titan Survey provides a means to
image the subsurface of the property. It will detect and delineate significant
targets and enable the company to direct future drilling effectively.
    There are six known geochemical anomalies on the "TAS Project". The
company anticipates similar results as received on the adjoining Copper
Mountain Mining Corp Properties that has proven in excess of 4.6 billion
pounds of copper.

    
    Exploration objectives:
    -----------------------
    Map and detect potential Copper mineralization to depth within the TAS
project area.

    -   Detecting and discriminating targets related to potential
        mineralization and alteration associated with porphyry style
        deposits.
    -   Discriminating large targets with potentially greater tonnage from
        small non economic targets.
    -   Compliment near surface information for integrated drill targeting.
    -   Provide thorough property evaluation in less overall time than
        previously possible.
    -   Locating and delineating mineralization and related alteration to
        depths of up to 750 metres with IP Chargeability and DC resistivity.
    -   Mapping the resistivity and chargeability features related to
        mineralization, alteration, faults and lithologies

    Scope of Survey Data Acquisition:
    ---------------------------------
    The Titan survey for the TAS Project will consist of:

    Data Acquisition of 5 Titan 24 spreads totaling 18 kilometres of Titan 24
DCIP data acquisition. The Titan survey will be conducted as follows:

    -   Each Titan 24 line will be done with "a" spacing of 100 metres and
        line length will be 3.6 kilometres long.
    -   Line spacing will be 400 metres on the northern block and 800 metres
        for the south.

    Further news will be forthcoming in the near future.

    ON BEHALF OF THE BOARD

    "Allan Levien"

    -------------------------
    Allan Levien
    President

    The TSX Venture Exchange has not reviewed and does not accept
    responsibility for the adequacy or accuracy of the release.
    

    %SEDAR: 00006000E




For further information:

For further information: SUPREME RESOURCES LTD., 3620 Crouch Ave.,
Coquitlam, B.C., V3E 3H4, Telephone: (604) 662-3004, Ext. 107

Organization Profile

SUPREME RESOURCES LTD

More on this organization


Custom Packages

Browse our custom packages or build your own to meet your unique communications needs.

Start today.

CNW Membership

Fill out a CNW membership form or contact us at 1 (877) 269-7890

Learn about CNW services

Request more information about CNW products and services or call us at 1 (877) 269-7890