    VANCOUVER, Jan. 10 /CNW/ - Aurizon Mines Ltd. (TSX:ARZ; AMEX:  AZK) is
pleased to announce its 2007 gold production and its plans for 2008.

    2007 Gold Production

    Gold production from Aurizon's 100% owned Casa Berardi mine for the year
ended December 31, 2007, totalled 159,469 ounces from the processing of
545,258 tonnes at an average grade of 9.8 grams of gold per tonne, which is
2.0 grams per tonne higher than the present mine reserve grade. Recoveries for
the year averaged 93.0% which was higher than anticipated. Gold production was
3% lower than the previous 2007 guidance of 165,000 ounces due primarily to a
delay in mining one higher grade stope that will now be mined in 2008.

    Fourth Quarter, 2007 Gold Production

    Ore processed in the fourth quarter amounted to 154,001 tonnes at an
average grade of 8.1 grams of gold per tonne. In the previous quarter, 152,002
tonnes were processed at an average grade of 10.6 grams of gold per tonne. The
average daily mine production for the quarter was 1,674 tonnes per day, in
line with the previous quarter's rate of 1,652 tonnes per day. Mill recoveries
of 91.8% were achieved in the fourth quarter, compared with 92.8% achieved in
the previous quarter due to the processing of lower grade ore, as anticipated.
As a result, gold production totalled 37,000 ounces for the quarter compared
to 48,305 ounces in the previous quarter of 2007.

    Forecast Gold Production for 2008

    It is estimated that Casa Berardi will produce between 160,000 - 170,000
ounces of gold in 2008 at an average grade of 8.6 grams of gold per tonne.
Average daily mine production is estimated at 1,800 tonnes per day, an
increase of 20% over 2007.
    In 2008, ore grades are expected to be lower than the high grades
achieved in 2007 and, assuming a stronger Canadian dollar, total cash costs
per ounce in 2008 are anticipated to increase to US$394 per ounce.
    Sustaining capital expenditures at Casa Berardi are estimated to be
$15.4 million in 2008, primarily for the development of the upper and lower
portions of Zone 113 and of the Lower Inter Zone. An additional $2.6 million
is planned on infrastructure and equipment improvements.

    Exploration

    Aurizon intends to initially invest over $13 million, from working
capital, in exploration and development activities at its properties in 2008,
of which approximately $3 million will be expensed. In total, over 70,000
metres of drilling is planned.

    Casa Berardi

    At Casa Berardi, surface drilling will focus on the extension of the
South fault, east of Zone 123-S, and in the area of the East Mine crown
pillar.
    In addition, it is anticipated that Lake Shore Gold will commence surface
drilling on the adjacent Casa Berardi exploration property in order to fulfill
its commitment to incur expenditures of $600,000.
    The three year underground exploration program, initiated in 2007, will
continue as follows:

    
    a)  As the track drift connecting the West Mine and East Mine on the
        280 metre level has been rehabilitated, drilling will occur in the
        area of the Principal Zone and between the two mines where limited
        surface exploration has been performed to date.

    b)  At the East Mine, rehabilitation of the underground workings and
        definition drilling is planned with the objective of transferring the
        inferred mineral resources to the indicated category and ultimately
        to mineral reserves.

    c)  An exploration drift will be developed at the 810 metre level, east
        of Zone 113 and south of the Casa Berardi fault, to provide drill
        access to test the depth extension of Zone 113 and to test the
        continuity and extension of Zones 122 and 123-South.
    

    A total of $10.2 million will be invested at Casa Berardi, including
$6.1 million on underground development and infrastructure, and $4.1 million
on approximately 45,000 metres of surface and underground drilling.

    Joanna

    At Joanna, approximately $3 million will be initially invested to perform
approximately 26,000 metres of drilling focused on the following:

    
    a)  Surface drilling to a depth of 300 metres, outside of the area of the
        existing mineral resources.

    b)  Testing for potential of higher gold grade mineralization below
        300 metres.

    c)  Exploration targets north of the existing mineral resources.
    

    In addition, Breton, Banville & Associates are currently working on a
preliminary economic assessment report which should be completed late in the
first quarter, 2008. Further work programs will be budgeted following receipt
of this report.
    At Joanna, mineral resources are currently estimated at 11.3 million
tonnes averaging 1.7 grams of gold per tonne, for 630,000 ounces in the
indicated mineral resource category and 28.6 million tonnes averaging 1.6
grams of gold per tonne, for 1.42 million ounces in the inferred mineral
resource category.

    Kipawa

    At Kipawa, 2008 programs and budgets are being finalised in conjunction
with analysis and interpretation of the results from the extensive exploration
programs performed in 2007. It is anticipated that 2008 exploration activity
will include trenching and drilling to follow up on the discoveries of gold,
uranium and rare earth elements made in 2007. Work will commence upon receipt
of the necessary approval from the First Nations communities and government
agencies.

    Corporate Development

    Aurizon will continue to focus on its organic growth within the Abitibi
area surrounding its existing properties. In addition, the Company is
continuing to evaluate opportunities to increase its gold production and
reserve profile.

    2007 Year End Financial Results

    Aurizon expects to release the fourth quarter and 2007 year end financial
results during the week of March 17, 2008, and will hold a conference call to
discuss the results. Details of the call, including times and contact numbers,
will be announced closer to the date.
    Aurizon also expects to release during the same week an updated mineral
reserves estimate for the Casa Berardi mine including Zones 113, Lower Inter
and the East Mine open pit, together with a new mineral resources estimate for
Zone 123 and the underground East Mine.

    Quality Control

    Information of a scientific or technical nature in this news release was
prepared under the supervision of Michel Gilbert, P.Eng., Vice President of
Aurizon and a qualified person under National Instrument 43-101.

    About Aurizon

    Aurizon is a gold producer with a growth strategy focused on developing
its existing projects in the Abitibi region of north-western Quebec, one of
the world's most prolific gold and base metal regions, and by increasing its
asset base through accretive transactions. Aurizon shares trade on the Toronto
Stock Exchange under the symbol "ARZ" and on the American Stock Exchange under
the symbol "AZK". Additional information on Aurizon and its properties is
available on Aurizon's website at www.aurizon.com.

    FORWARD-LOOKING STATEMENTS

    This News Release contains "forward-looking statements", including but
not limited to forecast/anticipated gold production, gold grades, cash costs
per ounce, sustaining capital expenditures and expected expenditures on
exploration, infrastructure and equipment, planned work programs and budgets
for the Company's various properties during 2008, and timing of release of the
Company's 2007 year end financial results.
    These forward-looking statements are based on certain assumptions that
the Company believes are reasonable, including continued parity of the US and
Canadian currency in 2008, that the current price of gold be sustained or will
improve, that current mill recovery rates at the Company's Casa Berardi mine
will continue, that the Company's current mine plan can be achieved and that
the Company will not experience any material accident, labour dispute or
failure of plant or equipment.
    However, forward-looking statements are inherently uncertain and involve
a number of risks some of which are not within the Company's control or may
not be reasonably foreseeable and as a result there is no assurance that the
forward-looking statements will prove to be accurate. Actual results and
future events could differ materially from those anticipated in this news
release. Factors that could cause forecasts, plans and results to differ
materially from those expressed or implied by the forward-looking statements
in this news release include but are not limited to inherent uncertainties
associated with exploration; changes in mine plan and method necessitated by
unexpected conditions encountered during mining, changes in future prices and
demand for gold; variations in ore reserves, grade or recovery rates; failure
of plant, equipment or processes to operate as anticipated; accidents, labour
disputes; environmental risks and hazards, and other risks related to the
mining industry and financial markets more fully described in Aurizon's Annual
Information Form filed with the Securities Commissions of the provinces of
British Columbia, Alberta, Manitoba, Ontario and Quebec, and in Aurizon's
Annual Report on Form 40-F filed with the United States Securities and
Exchange Commission (SEC). These documents are available on Sedar at
www.sedar.com and on Edgar at www.sec.gov.

    CAUTIONARY NOTE TO US READERS

    As a British Columbia corporation, the Company is subject to certain
rules and regulations issued by the British Columbia Securities Commission
("BC Securities Commission"). The Company is required to provide detailed
information regarding its properties including mineralization, drilling,
sampling and analysis, security of samples and mineral resource and mineral
reserve estimates. Further, the Company describes mineral resources associated
with its properties utilizing terminology such as "indicated" or "inferred"
which terms are recognized by Canadian regulations but are not recognized by
the United States Securities and Exchange Commission ("SEC").

    Cautionary Note to U.S. Investors Regarding Mineral Resources

    The SEC allows mining companies, in their filings with the SEC, to
disclose only those mineral deposits they can economically and legally extract
or produce. The Company may use certain terms in this document, such as
"mineral resources", "indicated mineral resources" and "inferred resources"
that are recognized and mandated by Canadian securities regulators but are not
recognized by the SEC.
    This News Release may use the term "indicated" resources. U.S. readers
are cautioned that while that term is recognized and required by Canadian
regulations, the SEC does not recognize it. U.S. investors are cautioned not
to assume that any part or all of mineral deposits in this category will ever
be converted into mineral reserves.
    This News Release may also use the term "inferred" resources. U.S.
readers are cautioned that while this term is recognized and required by
Canadian regulations, the SEC does not recognize it. "Inferred resources" have
a great amount of uncertainty as to their existence, and great uncertainty as
to their economic and legal feasibility. It cannot be assumed that all or any
part of an Inferred Mineral Resource will ever be upgraded to a higher
category. Under Canadian rules, estimates of Inferred Mineral Resources may
not form the basis of feasibility or pre-feasibility studies, except in rare
cases. U.S. investors are cautioned not to assume that part or all of an
inferred resource exists, or is economically or legally mineable.





For further information:

For further information: AURIZON MINES LTD.: David Hall, President and
C.E.O., Telephone: (604) 687-6600, Toll Free: 1-888-411-GOLD, Fax: (604)
687-3932; Michel Gilbert, Vice President, Telephone: (819) 874-4511, Fax:
(819) 874-3391; Web Site: www.aurizon.com, Email: info@aurizon.com; or Renmark
Financial Communications Inc., 2080 Rene-Levesque Blvd. West, Montreal, QC,
H3H 1R6; Barry Mire: bmire@renmarkfinancial.com; Jen Power:
jpower@renmarkfinancial.com; Tel: (514) 939-3989, Fax: (514) 939-3717

Organization Profile

AURIZON MINES LTD.

More on this organization


Custom Packages

Browse our custom packages or build your own to meet your unique communications needs.

Start today.

CNW Membership

Fill out a CNW membership form or contact us at 1 (877) 269-7890

Learn about CNW services

Request more information about CNW products and services or call us at 1 (877) 269-7890