    CHALK RIVER, ON, May 27 /CNW/ - Atomic Energy of Canada Limited (AECL)
provides the following status report on the unplanned shutdown of the NRU
reactor at its Chalk River Laboratories.
    On Monday, May 18, AECL reported that the NRU reactor would remain out of
service for more than one month in order to investigate and repair a heavy
water leak in the reactor vessel. Since then, AECL staff have been working
around the clock to complete the initial investigation of the reactor vessel.
    The location of the heavy water leak has been identified at the base of
the reactor vessel in a location where there is corrosion on the outside wall
of the vessel. Initial inspection of the full circumference of the external
wall at the base of the reactor vessel using remote cameras is now complete.
Results from this inspection indicate additional corrosion points on the outer
wall of the vessel that will require further examination. Test equipment is
being prepared to inspect the interior of the reactor vessel.
    "Sophisticated diagnostic procedures are required to determine the exact
nature and extent of the repairs before returning the NRU reactor safely to
service," stated AECL's Senior Vice-President and Chief Nuclear Officer, Bill
Pilkington. "Based on our preliminary findings to date, we now believe that
the NRU reactor will be out of service for at least three months."
    Hugh MacDiarmid, President and CEO of AECL added "Until all
investigations are completed, it is premature at this point to set a
definitive timeline for the return to service of the NRU reactor. We want to
reassure Canadians that every effort is being taken by our team of experts to
address the situation as quickly as possible while adhering to all prescribed
safety procedures. We remain committed to providing regular updates on the
situation just as soon as we learn more about the condition of the reactor
vessel and the repair requirements."
    AECL has also lowered the heavy water level in the reactor vessel. As a
result of this action the initial leak rate of 5 kg/hr. has been reduced by
approximately one quarter. The heavy water is fully contained and is being
stored in specially designed drums.
    Due to high airflow in the area, a small portion of the leakage
evaporates and results in a monitored tritium release through the NRU reactor
ventilation system. Although the airborne release is well below regulatory
limits, the release has reached action levels for tritium. While this level
does not pose a threat to the public or our workers, this is the level at
which AECL reports to stakeholders and the Canadian Nuclear Safety Commission
(CNSC) for administrative purposes.
    AECL confirms that there is no threat to workers, the public, the
environment or nuclear safety related to this event. AECL will continue to
provide updates to the CNSC and stakeholders when new information becomes
available. A detailed briefing for media is planned for next week.





For further information:

For further information: Dale Coffin, Director, Corporate
Communications, AECL, 1-866-886-(AECL) 2325

Organization Profile

Atomic Energy of Canada Limited

More on this organization


Custom Packages

Browse our custom packages or build your own to meet your unique communications needs.

Start today.

CNW Membership

Fill out a CNW membership form or contact us at 1 (877) 269-7890

Learn about CNW services

Request more information about CNW products and services or call us at 1 (877) 269-7890