Golden Predator Intercepts 28 m of 5.06 g/t Gold at Brewery Creek's Bohemian Discovery Zone

TSX: GPD

www.goldenpredator.com

VANCOUVER, April 7 /CNW/ - Golden Predator Corp. (TSX: GPD) (the "Company") is pleased to announce results from ten additional core holes from its winter 2011 drill program at its Brewery Creek Project, Yukon. All ten of these holes, which are in the Bohemian Zone discovered late last year, intersected significant mineralization with best results of 28.0 m of 5.06 g/t gold beginning at a depth of 46.0 m in hole BC11-183, including 13.5 m of 8.78 g/t beginning at a depth of 53.5 m.

"These consistent results, with increasingly high grades, are extremely promising for the rapid development of the Brewery Creek project beyond the exploration phase." said Chairman & CEO William M. Sheriff. "With all 15 of the holes from our winter drill program received to date providing exceptional results, we look forward to the continued expansion of the open ended Bohemian Zone.

Brewery Creek

Core drilling at Brewery Creek this winter delineated a strongly mineralized steeply dipping, structural corridor that traverses the Bohemian Zone. The east-west corridor intersects a lower angle tabular mineralized zone in intrusive rocks; both remain open along strike. The steeply dipping structural zone lies approximately 500 m east of the Lucky deposit, the nearest past producing deposit, and is an extension of the 12 km Reserve Trend that traverses the Brewery Creek district. Results from the final holes drilled in the current program are pending.

The Brewery Creek Property is located 55 km due east of Dawson City, Yukon and comprises 793 quartz claims over 165 km(2). Brewery Creek was the site of a heap-leach gold mine which operated from 1996-2002 and produced 279,541 ounces of gold. Current resources remaining on the Property include an Indicated Resource of 3.98 MM tonnes grading 1.135 g/t gold and an Inferred Resource of 2.2 MM tonnes averaging 2.01 g/t gold (Diment and Simpson, 2009). The Brewery Creek Project is authorized under a Type A Water License and a production license with expiry dates of December 31, 2021.

    <<
    -------------------------------------------------------------------------
                2011 Diamond Drill Holes at Brewery Creek, YT
                       Significant Intercepts(1),(2)
    -------------------------------------------------------------------------
    Drill                           From         To       Interval      Gold
    Hole                             (m)         (m)        (m)         (g/t)
    -------------------------------------------------------------------------
    BC11-180                        52.0        88.0        36.0        0.69
    -------------------------------------------------------------------------
    including                       52.0        60.0         8.0        1.24
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-181                        46.0        56.7        10.7        1.50
    -------------------------------------------------------------------------
    including                       53.5        56.7         3.2        3.04
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-182                        39.0        49.0        10.0        3.56
    -------------------------------------------------------------------------
    including                       39.0        45.0         6.0        5.18
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-183                        12.0        15.0         3.0        2.15
    -------------------------------------------------------------------------
    BC11-183                        46.0        74.0        28.0        5.06
    -------------------------------------------------------------------------
    including                       53.5        67.0        13.5        8.78
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-184                        37.0        83.1        46.1        1.00
    -------------------------------------------------------------------------
    including                       45.0        49.0         4.0        3.99
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-185                        18.0        58.0        40.0        1.06
    -------------------------------------------------------------------------
    including                       35.5        56.0        20.5        1.63
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-186                         0.0        25.0        25.0        1.01
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-187                        15.0        26.0        11.0        3.10
    -------------------------------------------------------------------------
    BC11-187                        39.9        57.4        17.5        0.80
    -------------------------------------------------------------------------
    including                       45.0        55.5        10.5        0.96
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-188                        31.0        45.7        14.7        1.15
    -------------------------------------------------------------------------
    including                       31.0        37.0         6.0        1.76
    -------------------------------------------------------------------------

    -------------------------------------------------------------------------
    BC11-189                        29.0        41.0        12.0        1.32
    -------------------------------------------------------------------------
    (1) Results where g/t x m is less than 2.5 are not reported in this
        table, unless the individual grade was (greater than or equal to)
        1 g/t gold over a minimum of 3.0 m. Other intervals require (greater
        than or equal to) 0.5 g/t gold to be included.
    (2) grams per tonne (g/t) to troy ounces per short ton: g/t divided by
        34.2857 or multiply by .0292
        meters to feet: 1 m equals 3.28084 ft.
    >>

Sampling Methodology, Quality Control and Assurance

Samples were fire assayed by ALS Chemex in Vancouver. Refer to the Company's news release dated March 24, 2011 for a complete discussion of sampling methods, quality control and assurance.

The technical content of this news release has been reviewed and approved by Bruce R. Otto, M.Sc., P.Geo., CPG, the Company's Senior Structural Geologist and a Qualified Person as defined by National Instrument 43-101.

About Golden Predator Corp.

Golden Predator Corp.'s mandate is to be the leading gold property explorer and developer in Yukon, Canada. Golden Predator has a vast Yukon property position with three advanced gold projects, 6 pipeline prospects as well as exploration landholdings comprising over 2,000 km(2). The 2011 winter drilling program has commenced at the Brewery Creek and Grew Creek projects. In 2011 Golden Predator will continue aggressive drill programs and work towards completing initial resource estimates for Grew Creek and Clear Creek and updating the existing resource estimate for Brewery Creek, in addition to conducting initial drilling at the recently acquired Harlan project.

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance. There are numerous risks and uncertainties that could cause actual results and Golden Predator's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, Golden Predator assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change.

SOURCE Golden Predator Corp.

For further information: Golden Predator Corp., Investor Relations, (604) 648-GOLD (4653), info@goldenpredator.com, www.goldenpredator.com

Profil de l'entreprise

Golden Predator Corp.

Renseignements sur cet organisme


FORFAITS PERSONNALISÉS

Jetez un coup d’œil sur nos forfaits personnalisés ou créez le vôtre selon vos besoins de communication particuliers.

Commencez dès aujourd'hui .

ADHÉSION À CNW

Remplissez un formulaire d'adhésion à CNW ou communiquez avec nous au 1-877-269-7890.

RENSEIGNEZ-VOUS SUR LES SERVICES DE CNW

Demandez plus d'informations sur les produits et services de CNW ou communiquez avec nous au 1‑877-269-7890.