|
ACADIAN MINING CORPORATIONDetailed Chart...Acadian Mining intersects 53 meters grading 2.25 g/t gold including 21 meters grading 4.99 g/t gold at Beaver Dam, Nova Scotia
Trading Symbol: ADA:TSX; C2Z-Frankfurt
Shares Outstanding: 491,691,616
The highlights of drill holes BD-09-140 to BD-09-142 are presented in the table below. Drill hole BD-09-142 terminated in old mine workings and as a result did not fully intersect the target zone.
Table 1 Significant Results - Drill Holes BD-09-140 to BD-09-142
----------------------------------------------------------------
-------------------------------------------------------------------------
Drill Holes From (m) Interval (m) Gold Grade (uncut g/t)
-------------------------------------------------------------------------
BD-09-140 18.00 53.00 2.25
-------------------------------------------------------------------------
including 18.00 21.00 4.99
-------------------------------------------------------------------------
including 38.00 1.00 81.08
-------------------------------------------------------------------------
BD-09-141 31.00 51.00 1.42
-------------------------------------------------------------------------
Including 63.00 19.00 2.11
-------------------------------------------------------------------------
Including 63.00 9.00 3.48
-------------------------------------------------------------------------
BD-09-142 7.00 40.00 0.87
-------------------------------------------------------------------------
Including 24.00 21.00 1.12
-------------------------------------------------------------------------
Including 34.00 10.00 1.88
-------------------------------------------------------------------------
The true width of gold mineralized intercepts varies from approximately 80% (-50 dip hole) to 85% (-45 dip hole) of the intercept width.
Table 2 Drill Hole Co-ordinates BD09-140 to BD09-153
----------------------------------------------------
-------------------------------------------------------------------------
Hole Easting (m) Northing Elevation (m) Depth (m) Dip Azimuth
(m)
-------------------------------------------------------------------------
BD09-140 711 1074 1133 103 -45 190
-------------------------------------------------------------------------
BD09-141 737 1080 1133 95 -45 190
-------------------------------------------------------------------------
BD09-142 860 1046 1133 47 -45 190
-------------------------------------------------------------------------
BD09-143 887 10645 1133 80 -45 190
-------------------------------------------------------------------------
BD09-144 1137 1055 1131 110 -45 190
-------------------------------------------------------------------------
BD09-145 1075 1180 1131 270 -60 190
-------------------------------------------------------------------------
BD09-146 650 1190 1139 190 -50 190
-------------------------------------------------------------------------
BD09-147 700 1180 1132 190 -65 190
-------------------------------------------------------------------------
BD09-148 825 1209 1136 215 -45 190
-------------------------------------------------------------------------
BD09-149 875 1150 1133 215 -70 190
-------------------------------------------------------------------------
BD09-150 1200 1150 1135 250 -62 190
-------------------------------------------------------------------------
BD09-151 600 1158 1130 170 -65 190
-------------------------------------------------------------------------
BD09-152 1062 1079 1131 235 -45 190
-------------------------------------------------------------------------
BD09-153 -175 1112 1135 260 -45 190
-------------------------------------------------------------------------
The Beaver Dam Main Zone as presently defined has a strike length of 725 meters and averages approximately 30 meters in width. Drilling to date has generally been to shallow depths to support a potential bulk tonnage - open pit development plan. However, limited deep drilling to date demonstrates the continuity of the gold zones to depth, and supports the potential for a gold deposit amenable to underground mining methods below the open pit target.
The current resource at Beaver Dam is comprised of cut indicated resources of 446,000 oz. gold (9.08 million tonnes grading 1.53 g/t gold) and cut inferred resources of 504,000 oz. gold (10.40 million tonnes grading 1.50 g/t gold). Details of the Beaver Dam resources are described in the "Technical Report on the Updated Mineral Resource Estimate", effective date
Management's Opinion
--------------------
Will Felderhof, President and CEO, stated, "These results continue to support the bulk tonnage - open pit potential at Beaver Dam, and we look forward to the point in time when a decision can be made to commence a feasibility study."
Other
-----
Terence F. Coughlan, P. Geo., is a qualified person as defined by National Instrument 43-101 and has reviewed the technical information reported in this news release for accuracy.
Technical Reports
-----------------
"Technical Report on the Updated Mineral Resource Estimate for the Beaver Dam Property,
About Acadian
-------------
Acadian is a
Forward Looking Statement
-------------------------
Certain information regarding Acadian contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although Acadian believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. Acadian cautions that actual performance will be affected by a number of factors, many of which are beyond Acadian's control, and that future events and results may vary substantially from what Acadian currently foresees. Discussion of the various factors that may affect future results is contained in Acadian's Annual Information Form dated
Additional Information
----------------------
For additional information on Acadian's properties and activities, please visit our web site at www.acadianmining.com.
No regulatory authority has approved or disapproved the contents of this
release.
For further information: G. William Felderhof, President & CEO; Terry F. Coughlan, Vice President, (902) 444-7779, Toll Free: (877) 444-7774, mail@acadianmining.com
|




